Telecopy AO 50-265/75-42:on 751018,differential Pressure Across B Train Particulate Filters of Standby Gas Treatment Sys Exceeded Tech Specs.Caused by Smoke from Small Fire Created by Onsite Welders.Work Request Issued
ML20084S612
Person / Time
Site: Quad Cities 
Issue date: 10/20/1975
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20084S605 List:
References
AO-50-265-75-42, NUDOCS 8306170133
Download: ML20084S612 (1)


Text

I

^^

O pd '

I Quagdm Co wealth Edison

{

J aos Nuclear Power Station t

Post Ofbec Box 216

(\\

Cordova,Ithnois 61242 Tc!cphone 300/654-2241 NJ K-75-518 Telecopy:

Region ill, Attention:

Mr. C. FeIerabend October 20, 1975

[

I/4 b

s J. Keppler, Regional Director j

Ogs

. Ya d'/

Office of Inspection and Enforcement 2

1

. N8 d

Region til

- i-k

[]'sg'

,jg.g'.

c U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

~

Reference:

Quad-Cities lluclear Power Station, Unit 2 Docket No. 50-265, DPR-30 Appendix A, Sections 1.0.A.2, 3 7.B.1, 6.6.B.2.a

Dear Mr. Keppler:

The purpose of this letter is to provide you with notification of an Abnormal Occurrence as required by Technical Specification 6.6.B.I.a within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the occurrence.

On October 18, 1975, with Unit Two in the' cold shutdown condition, smoke from a small fire created by onsite contracted welders, fouled the Standby Cas Treat-ment "B" train particulate filters sufficiently to produce a differential pressure across the filters slightly in excess of the Tec,hnical Specification Ilmit of 5.7 inches of water.

The "A" train was immediately tested and found operational, and a work request was issued to change the "B" train filters.

During a conversation with the NRC Regional Office on October 20, 1975, it was decided to classify this event as an Abnormal Occurrence.

This occurrence was discussed by telephone with Mr. Feierabend of yotir office on October 20, 1975 Further information will be provided by Abnormal Occurrence Report A0 50-265/75-42 which will be submitted within 10 days of the date of this occurrence.

Very truly yours, COMMONWEALTH EDISON COMPANY QUAD-CITIES NUCLEAR POWER STATION Y

h N.J. Kalivianakis Station Superintendent 8306170133 ] % h ;