, j.c Ill. OPERATING DATA STATISTICS APPENDIX C A. REVISED OPERATING DATA REPORT FOR JULY,1998 DOCKET NO: 50-254 UNIT: One DATE: Sept. 9,1998 COMPLETED BY: Lynne Hamilton TELEPHONE: (309) 654-2241 i
OPERATING STATUS 0000 070198
- 1. REPORTING PERIOD: 2400 073198 GROSS HOURS IN REPORTING PERIOD: 744
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2511 MAX > DEPEND > CAPACITY: 769 DESIGN ELECTRICAL RATING (MWe-NET): 789
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-NET): N/A
- 4. REASONS FOR RESTRICTION (IF ANY):
Tills MONTil YEAR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL 744.00 1438.40 173813.80
- 6. REACTOR RESERVE SHUTDOWN HOURS 0.00 0.00 3421.90
- 7. HOURS GENERATOR ON LINE 744.00 1354.50 168649.80
- 8. UNIT RESERVE SHUTDOWN HOURS 0.00 0.00 909.20
- 9. GROSS THERMAL ENERGY GENERATED (MWH)
- 1793532.00
- 3114160.80
- 368551403.40
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 552086.00 971309.00 119224678.00
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 525668.00 922745.00 107077714.00
- 12. REACTOR SERVICE FACTOR 100.00 28.28 75.39
- 13. REACTOR AVAILABILITY FACTOR 100.00 28.28 76.87
- 14. UNIT SERVICE FACTOR 100.00 26.63 73.15
- 15. UNIT AVAILABILITY FACTOR 100.00 26.63 73.54
- 16. UNIT CAPACITY FACTOR (Using MDC) 91.88 23.59 60.39
- 17. UNIT CAPACITY FACTOR (Using Design Mwe) 89.55 22.99 58.86
- 18. UNIT FORCED OUTAGE RATE 0.00 0.03 7.18
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refuel, 11/07/98. 30 days.
- 20. IF SHUTDOWN AT END OF REPORT PERIOD < ESTIMATED DATE OF STARTUP: N/A
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): N/A FORECAST ACIIIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- To Correct Typographical Errors l
1.16-9 n
9909210010 990911 PDR ADOCK 05000254 R
4 yq
.o III. OPERATING DATA STATISTICS 9
APPENDIX C It. REVISED OPERATING DATA REPORT FOR JULY,1998 DOCKET NO: 50-265 UNIT: Two DATE: Sept. 9,1998 COMPLETED BY: Lynne Hamilton TELEPHONE: (309) 654-2241 OPERATING STATUS 0000 070198
- 1. REPORTING PERIOD: 2400 073198 GROSS HOURS IN REPORTING PERIOD: 744
{
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2511 MAX > DEPEND > CAPACITY: 769 DESIGN ELECTRICAL RATING (MWc-NET): 789 1
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(Mwe-NET): N/A
- 4. REASONS FOR RESTRICTION (IF ANY):
Tills MONTil YEAR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL 744.00 1619.25 165986.30
- 6. REACTOR RESERVE SHUTDOWN HOURS 0.00 0.00 2985.80
- 7. HOURS GENERATOR ON LINE 742.30 1501.60 161471.45
- 8. UNIT RESERVE SHUTDOWN HOURS 0.00 0.00 702.90
- 9. GROSS THERMAL ENERGY GENERATED (MWH)
- 1803069.60 3513878.40 351870134.72
]
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 552790.00 1083987.00 112846531.00 i
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 529647.00 1032044.00 106979502.00
- 12. REACTOR SERVICE FACTOR 100.00 31.83 72.48
- 13. REACTOR AVAILABILITY FACTOR 100.00 31.83 73 M
- 14. UNIT SERVICE FACTOR 99.77 29.52 7bl~
- 15. UNIT AVAILABILITY FACTOR 99.77 29.52 70.82
- 16. UNIT CAPACITY FACTOR (Using MDC) 92.57 26.38 60.75
- 17. UNIT CAPACITY FACTOR (Using Design Mwe) 90.23 25.71 59.21
- 18. UNIT FORCED OUTAGE RATE 0.23 6.46 11.15
}
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
None
- 20. IF SHUTDOWN AT END OF REPORT PERIOD < ESTIMATED DATE OF STARTUP: N/A
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): N/A FORECAST ACIIIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION