.. . _ _ ... _ . . _ _ . _ _ _ _ _ . _ .. _ _ ._._ _ _ _ _ _ _ _ . _ ._

. 4

, j .c  ;

. Ill. OPERATING DATA STATISTICS APPENDIX C A. REVISED OPERATING DATA REPORT FOR JULY,1998 DOCKET NO: 50-254 UNIT: One DATE: Sept. 9,1998 COMPLETED BY: Lynne Hamilton TELEPHONE: (309) 654-2241 ,

i OPERATING STATUS ,

0000 070198

1. REPORTING PERIOD: 2400 073198 GROSS HOURS IN REPORTING PERIOD: 744 ,
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2511 MAX > DEPEND > CAPACITY: 769 DESIGN ELECTRICAL RATING (MWe-NET): 789
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-NET): N/A
4. REASONS FOR RESTRICTION (IF ANY):

Tills MONTil YEAR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 744.00 1438.40 173813.80
6. REACTOR RESERVE SHUTDOWN HOURS 0.00 0.00 3421.90
7. HOURS GENERATOR ON LINE 744.00 1354.50 168649.80
8. UNIT RESERVE SHUTDOWN HOURS 0.00 0.00 909.20
9. GROSS THERMAL ENERGY GENERATED (MWH) *1793532.00 *3114160.80 *368551403.40
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 552086.00 971309.00 119224678.00
11. NET ELECTRICAL ENERGY GENERATED (MWH) 525668.00 922745.00 107077714.00
12. REACTOR SERVICE FACTOR 100.00 28.28 75.39
13. REACTOR AVAILABILITY FACTOR 100.00 28.28 76.87
14. UNIT SERVICE FACTOR 100.00 26.63 73.15
15. UNIT AVAILABILITY FACTOR 100.00 26.63 73.54
16. UNIT CAPACITY FACTOR (Using MDC) 91.88 23.59 60.39
17. UNIT CAPACITY FACTOR (Using Design Mwe) 89.55 22.99 58.86
18. UNIT FORCED OUTAGE RATE 0.00 0.03 7.18
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refuel, 11/07/98. 30 days.

20. IF SHUTDOWN AT END OF REPORT PERIOD < ESTIMATED DATE OF STARTUP: N/A
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): N/A FORECAST ACIIIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
  • To Correct Typographical Errors l 1.16-9  ;

n 9909210010 990911 ,

PDR ADOCK 05000254 R PDR '

5-mmonwacssrrin.coc

4 yq .o 9 III. OPERATING DATA STATISTICS APPENDIX C It. REVISED OPERATING DATA REPORT FOR JULY,1998 DOCKET NO: 50-265 UNIT: Two DATE: Sept. 9,1998 COMPLETED BY: Lynne Hamilton TELEPHONE: (309) 654-2241

, OPERATING STATUS 0000 070198

1. REPORTING PERIOD: 2400 073198 GROSS HOURS IN REPORTING PERIOD: 744

{ 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2511 MAX > DEPEND > CAPACITY: 769 DESIGN ELECTRICAL RATING (MWc-NET): 789 1

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(Mwe-NET): N/A
4. REASONS FOR RESTRICTION (IF ANY):

Tills MONTil YEAR TO DATE CUMULATIVE

, 5. NUMBER OF HOURS REACTOR WAS CRITICAL 744.00 1619.25 165986.30

6. REACTOR RESERVE SHUTDOWN HOURS 0.00 0.00 2985.80
7. HOURS GENERATOR ON LINE 742.30 1501.60 161471.45
8. UNIT RESERVE SHUTDOWN HOURS 0.00 0.00 702.90
9. GROSS THERMAL ENERGY GENERATED (MWH) *1803069.60 3513878.40 351870134.72

]

10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 552790.00 1083987.00 112846531.00 i
11. NET ELECTRICAL ENERGY GENERATED (MWH) 529647.00 1032044.00 106979502.00 l
12. REACTOR SERVICE FACTOR 100.00 31.83 72.48  !
13. REACTOR AVAILABILITY FACTOR 100.00 31.83 73 M
14. UNIT SERVICE FACTOR 99.77 29.52 7bl~
15. UNIT AVAILABILITY FACTOR 99.77 29.52 70.82
16. UNIT CAPACITY FACTOR (Using MDC) 92.57 26.38 60.75
17. UNIT CAPACITY FACTOR (Using Design Mwe) 90.23 25.71 59.21
18. UNIT FORCED OUTAGE RATE 0.23 6.46 11.15

}

19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

. None l

20. IF SHUTDOWN AT END OF REPORT PERIOD < ESTIMATED DATE OF STARTUP: N/A
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): N/A FORECAST ACIIIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
  • To Correct Typographical Error 1.16-9 TirHOP3\NRC\5ETT/8. DOC