ed ComgCu., Generating Station
(}
x
rlth Edison Outd-v i?
{!-
P2st Offica Box 216 Cordova, Illinois 61242
'? \\
1Q
- r
\\
Telephone 30'3/654-2241
.(
'3 Ga7
' !6, U wa
\\
b.!
n/
t NJK-75-386
%>}
l y
TELECOPY:
Region III, ATTENTION:
Mr. C. Feierabend -i' * "
?e July 30, 1975 e.
p J. Keppler, Regional Director Directorate of Regulatory Operations Region III U. S. NUCLEAR REGULATORY COMMISSION 799 Roosevelt Road Glen Ellyn, IL 60137 REFEPENCE:
Quad-Cities Nuclear Power Station, Unit 2 Docket No. 50-265, DPR-30 Appendix A, Sections 1.0.A.2, 3 5.B.1, 6.6.B.1.a
Dear Mr. Keppler:
The purpose of this letter is to provide you with notification of an Abnormal decurrence as required by Technical Specification 6.6.B.l.a within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the occurrence.
At 9: 00 pm on July 29, 1975, during flow rate nurveillance tesuing of the Residual Heat Removal (RHR) System Service Water Pumps,i pump 2A failed to meet the Technical Specification / required flow rate of 3500 GPM at 198 PSIG.
The maximum flow rate obtained was 2850 GPM at 19 8 PSIG.
Work request 2794-75 was immediately issued for in-vestigation and repair.
This occurrence was discussed by telephone with Mr. Knop of your office on July 30, 1975.
Further information will be provided by Abnormal Occurrence Report A0 50-265/75-28 which will be submitted within 10 days of the date of this occurrence.
Very truly yours, COMMONWEALTH EDISON COMPANY QUAD-CITIESPC/EARPOWERSTATION ffk.,.;h/Jfllf$
N. J. Kalivianakis Station Superintendent NJK:SRH/dkp cc:
Directorate of Licensing J. S. Abel 8306160307 75080s PDR ADDCK 05000265 I
S PDR g
l
1 _. m n.'5 N Zf 5 T -
Generating Station D
Post Off 216
- Cordcnn, t61242 Telephone 309/654 2241 NJK-75-386 TELECOPY:
Region III, ATTEtiTION :
Mr. C. Feierabend July 30, 1975 J.
Keppler, Regional Director-Directorate of Regulatory Operations Region III U. S. NUCLEAR REGULATORY COMMISSION 799 Roosevait Road Glen Ellyn,\\IL 60137 xQuad-Cities Nuclear Power Station, Unit' 2
REFERENCE:
Docket No. 50-265, DPR-30 App,endix A, Sections 1.0.A.2, 3 5. B.1, 6. 6. B.1. a
\\
Dear Mr. Keppler
\\
The purpose of this letter is to provide you with notification of an Abnormal Occurre'nce as required by Technical Specification 6.6.B.1.a within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of t!he occurrence.
At 9:00 pm on July 29, 1975, during flow rate surveillance testing Removal (RIIR) System Service Water Pumps, pump of the Residual Heat 2A failed to meet the Te'yhnical Specification required flow rate of The maximum flow rate obtained was 2850 GFM 35nn GPM at 19 8 PSIG.
at.198 PSIG.
Work request 2794-75 was immediately issued for in-vestigation and repair.
This occurrence was discussed by telephone with Mr. Knop of your office on July 30, 1975 Furtn9r information will be provided by Abnormal Occurrence Report AO 50-265/75-28 which will be submitted within 10 days of the date of thi occurrence.
Very truly yours, COMMONWEALTH EDISON COMPANY QUAD-CITIES I C EAR POWER STATION f
4W/
N. J. Kalivianakis Station Superintendent NJK:SRH/dkp Directorate of Licensing s
cc:
J. S.
Abel
&& w m
a
.o g
g e
.*i-Comm _cith Edis:n W
-f i Ouad Cibes Nuclear F'o.,er Stat.cn
'M Z-Post Othcc Box 216 Y
bj / Cordova,11hnois G1242 Tc!cphone 309/C54 2241 f1JK-75-404
~
August 8, 1975
~
~
Director of Of fice of flucicar Reactor Regulation
,x U. S. fluclear Regula tory Commission Washington, D. C. 20555
Reference:
Quad-Citics fluclear Power Station Docket flo. 50-265, DPR-30, Unit 2 Appendix A, Sections 1.0.A.2, 3 5 0.1, 6.6.B.I.a Enclosed please f ind Abnormal Occurrence Report flo. 50-265/75-28 for Quad-Cities lluclear Power Station. This occurrence was previously reported to Region Ill, Directorate of Regulatory Operations by telephone on July 30, 1975 and to you and Region ill, Directorate of Regulatory Operations by telecopy on July 30, 1975 This report is submitted to you in accordance uith the requirements of Technical Specification 6.6.B.l.a.
Very truly yours, C0 tit 40, WEALTH EDI SON CO,'iPAflY QUAD-C ITIES ffUC'. EAR POWER STATION i
/
f ll-3 ;,. qIdh N.J. Kalivianakis Station Superintendent NJ K/ORH/vmb cc: Office of Inspection and Enforcement G.A. Abrell COPY SErn REGION -