Comgwealth Edison C) h Quad-Cases Nu !eas PourSurson Post Oitice Box 21G Cordova, Ilhno s 61247 l
'g g Telep%ne 309/654-2247 NJ3G-75-431-Telecopya Region < f K+, Atterrtioe:
Mr; C. Felerabend-j August 25, 1975' J. Meppler. Regional DTrestor-Office of l'nspection and Enforcement-l Region < 1 f-h U.
S-. Nuclear Regulatory. Co unission-t 799' RooseveI t-Road-GTen: Ellyn, I filiners 60137-
-j
Reference:
Quad.-CT-tres Nucleac-Power Station, Uni t 2 l
Doeket Me. 50-265; DPR f Appendix A, Sectroaa 1.0. A.J. 6.6.S; I.a.
Dear Ner. Keppler.:
The purpose of this, lettec Ts to provide yow with. noti ff. cation of an Abnormal Decuccence as regurred-by Techn.i cal Speci ficat Torr. 6.6.8. le.a within, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of '
the occurrense.
i As a. resul t of the feedwater line break (AO-50-265/75-317 on-unit 2 on Augus t T7, 1975, some contaminated-water was present in. the Uni t Two oi-T.- separaton.
Rain ;
2 fali received between midnight and 6:00' am on: August-25; 1975 added suff.icient {
water to the oil. separatorr to. cause i t to overflow. Into the spray canal.
The-i activity in the separator was-measured at 9.68 x: 10.-5 ucl/ml. After dilution with. the spray canal water fios and the ci rculating water flow from the river, the acti.vrty was calculated to be 1.7. x 10-82 uct/mi in the plant discharge bay.
This activity was-within Techn-ical Specification ITmrts but was however an un-planned release from the site.
The remaining-watec in the oil separator is being discharged: as. a-controfled batch release.
This occurrence was discussed.by telephone wi th-Me. Felerabend. of your. office -
on August 25, i975 Further information wil T be provided-by Abnonnel Occuerencei Repont AO 50.-265/75-33;hich wiii be submi tted w.i thin; 10- days of the. date of this occurrence.
Vecy truly youes-COMMONWEALTH: EDISON'. COMPANY QUAD-CITIES NUCLEA,1b POWERA l'0W Y f Yb#4[
Ni, J. Kalivianakis.
Statfort Superintendent NJK/ik-OffTce: of NuIclear Reactor Regulation.
cc0 G.. W. A b c e I:l' 8306160133 750904 A