4 I
~
ConunonweeHh disor.
Ond-Cities Generating Station, l
/
Put Office Box 21C.
l 4-f Cordcrira,I!!!nois 61242
~.. - -. '. "
Telephona339/654 2241.
C-75-437 LOOCpy Region.III, Attention:
Mr. C. Feierabend
)
gust 31, 1975 K:ppigr', Regional Director rico cf Inspection and Enforcement.
pion: III S. Nuclear Regulatory Commission.
P Ricacvelt Road.
en.Ellyn, 1111nois 60137 Ecr nsa:
Quad-Cities Nuclear Power Station, Unit 2 Docket No. 50-265, DPR-30' Appendix A, Sections 1.0. A. 4, 3 5.E.1, 6.6.B la.
te Mr. Keppler:
g.
r purpose of this letter'is-to provide you with, notification. or an-
,f 1:rmal Occurrence as required by Technical Specification. 6.6.B.1,a
'l hin. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the occurrence.
I August 30, 1975, whilo performing the monthly RCIC operability j
millance test, it was discovered that.the RCIC would not. reach.
3 t rat 6d conditions, but would trip.at 3500 RPM.
Approximately-l 30 RPM was needed.
A failure in the overspeed mechanism is sus-i
- tCd.
The HCIC system was declared inoperable and the required
) "
sting cf the HPCI system was initiated.
l L3 occtirrtence was discussed by' telephone with. Mr. Allen of your
[
Fico on August 30, 1975.
Further information will be provided-by
'b 10rmal Occurrence Report AO 5_0-265/73-34_which. will be submitted g
8 Lhin.10 days.of the date ofthis occurrence, pp Fy truly ycurs, j
Ol0NWEALTN EDISON COMPANY f gl LD-CITIES NUCLEAR POWER STATION.:
f Y
l if J. Kalivianakis ttien Superintendent
}
C/RAR/caa f
Office of Nuclear' Reactor Regulation.
G. A..Abrell i
i e
I 8306160121 750909 b
PDR ADOCK 05000265 S