Telecopy Ao:On 750812,ECCS Low Pressure Permissive Sensor PS-2-263-52A Discovered in Isolated condition.PS-2-263-52A Put Into Svc & All Switches Satisfactorily Functionally Tested.Further Info to Be Provided in AO 50-265/75-30
ML20084S223
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 08/13/1975
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NJK-75-415, NUDOCS 8306160260
Download: ML20084S223 (1)


Text

-

O

- Commonw :l&dison [

. \ Oua
i Cibes NucMPower Subon I 'C-' Post Othee Dox 216 Coruova. Ilhnom 61N2 c letephone 3J9/0%2241 NJK-75-415 Talocopy: Region lil, Attention: Mr. C. Feie rabend August 13, 1975 J. K;ppler, Regional Director Office of Inspection and Enforcenent Region iII U. S. Nuclear Regulatory Conenission 799 Roosevelt Road Ginn Ellyn, Illinois 60137 Refarence: Quad-Cl tics Nuclear Power Station Docket No. 50-265, DPR-30 Appendix A, Section 1.0.A.4, 3.2.8, 6.6.B.I.a
i. I! ,,

T. i : } I Th2 purpose of this Ictter is to provide you with notification of an Abnormal Occurrence os requi red by Technicul Specifict.tlon 6.6.D. I .a within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the occurrence.

On August 12, 1975, ultile perforralng routinc surveillance testing of the ECCS 10,4 pressure permissive sensors, PS-2-263-52A uns discovered in the isolated ccndition. The other three sensors were not isolated. PS-2-263-52A was put into service and all four switches were satisfactorily functionally tested.

This occurrence was discussed by telephone with fir. Tarrbling of your office on August 12 1975 Further Information will be provided by Abnormal Occurrence Report A0 50-265/75-30 which wi11 be submitted within 10 days of the date of thIs occurrence.

V2ry truly yours, COMMONWEALTH EDISON COMPNiY ..

QUAD-CITIES NUCLEAR PO'JER STATION k ,  % 'W I

N. J. Kallvianakis l Staticn Superintendent NJK/RAR/1k l cc: Of fice of Nuclerer Reactor Regulation G. A. Abrell 8306160260 750813 gDRADOCK05000 _ , , _

g 3/ VM fd://3/75 8

t i

O g  % ., Commonwa i Edir, ort-e 4

3 osao-cit <ct No a Po <. e Sin on (n)

'-~'

~

g i> Pot,1 O*fd.tr D D E *U g Corcova. Hhnois b1:M?

Tott pho')e JD3(65C-2241

]M /J7 HJK-75-422 Tal ocopy:.- Region I'! l ,, At tenti on ;; Mr.. C.. FeI erabend August. 18',. 1971 J. Keppler, Regl'onsi Di> recto r -

Of fice of. Inspection and En.foricement Rogfon 111; 0; S. Nucicorr Regulatory- Commissiott.

799' Roosevelt Road, Gicn- El lyn, l.I:Iinot s 60137J Re fe rence: Quad-Ci tres Nuclear Power Station, Unf t 2 Decket No. 50-265, DPR' 30 -

Appcodix A, Secti ons 1.0. A. 5, 6.6. 8. I .a.

Do r Nr. Keppler:

Tha purpose of. this letter. is to providecyou wi th notification of. an Abnorcal Occurrence as requi red by Technical Specification 6.6.B.I.a wi thin 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ef. the-occurrence.

Gn Augus t- 17, 1975 whlic bringing Unit Two back to power following a r.uinten-cnce outogcc, the 6" to. 4" reducer on the downstream side of. Icu flo4 feedwater regulating valve, 2-643, severed due to. vibration incurred.while treasferring f rom the low flow feedsater regulating valve to. the main feedwater regulating v21ve.

Tho unit was manually scrammed and the reactor 1cvel was maintain.ed with the RCIC system. Although contaminated. water was introduced into the oil separator none was released to the envi rons.

l Thi s occurrence was discussed by telephone wi th Mr. Knop of your offi'ce on August 17, 1975 Further inf onnation will be provided by Abnormai Occurrence l

Report A0 50-265/75-31 which will be submi tted within 10 days of the date of this occurrence.

C ry truly yours, C0tuCWEALTH EDISON COP.PANY QUAD-CITIES NUCL AR POWER STATION Y') 1 94 N.. J. Kaliviannkis.

Stction Superintendent NJK/lk . ,

cc; Of fi'ce of Nuclear Reactor Regulation G. A. Abrell Qap e of,(__Y,Y Af-b f . .' <f a cjLdf _

~ ' - ' ~

3 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION III 799 ROOSEVELT RO AD CLEN ELLYN. ILLINOl5 601.l7 A. IE Inspection Report No.

Transmittal Date  :

Distribution: Distribu' tion:

IE Chief, FS&EB IE Chief, FS&EB IE:HQ (5) IE:HQ (4)

DR Central Files L:D/D for Fuels & Materials Regulatory Standards (3) DR Central Files Licensing (13) T.E Files -

IE Files IE Chief, M&FPB L:D/D for Reactor Project B. IE Inquiry Report No. ___

Transmittal Date  :

Distribution: Distribution:

IE Chief, FS&CB IE Chief, l';aEB IE:HQ (5) IE:HQ -*

DR Central Files DR Central Files Regulatory Standards (3) IE Filea Licensing (13)

IE Files C. Incident Notification From: Commonwealth Edison Company 50-254 (Licensec & Docket No. (or License No.)

Transmittal Date  : Quad-Cities Unit 1 August 21. 1975 Distribution: Distribution:

IE Chief, FS&EB IE Chief, FS&EB IE:HQ (4) IE:HQ (4)

Licensing (4) L:D/D for Fuels & Materials DR Central Files DR Cap..al Files IE Files IE Files otuilo, ae a e- .

( QL