y.

1

. e..

.a i

QUAD CITIES NUCLEAR POWER STATION UNITS 1 AND 2 4

MONTHLY PERFORMANCE REPORT AUGUST 1998 COMMONWEALTH EDISON COMPANY AND MIDAMERICAN ENERGY COMPANY NRC DOCKET NOS. 50-254 AND 50-265 LICENSE NOS. DPR-29 AND DPR-30 uc 9909210009 990911 PDR ADOCK O 24 R

, TirHOP3\\NRC\\SFFIDS. DOC

_... _. - -,~.-. - -

4 TABLE OF CONTENTS I.

Introduction

' II.

Summary of Operatirig Experience A.

Unit One B.

Unit Two III.

Operating Data Statistics

' A.

Revised Operating Data Report for July - Quad Cities Unit Oae B.

Revised Operating Data Report for July - Quad Cities Unit Two C.

Operatir g Data Report for August - Quad Cities Unit One D.

Operatirg Data Report for August - Quad Cities Unit Two IV Unit Shutdowns A.

Unit One Shutcowns B.

Unit Two Shutfowns i

V.

Amendments to Facility License or Technical Specifications VI.

Unique Reporting Requirements A.

Main Steam Relief Valve Operations i

1

'k

\\.

4 1ECH0P3\\NRNFFfSt. DOC i.

.n, 4

9 I. INTRODUCTION Quad Cities Nuclear Power Station is composed of two Boiling Water Reactors and Steam Turbine / Generators, each with a Maximum Dependable Capacity of 769 MWe Net, located in Cordova, Illinois. The Station is jointly owned by Commonwealth Edison Company and MidAmerican Energy Company. The Nuclear Steam Supply Systems are General Electric Company Boiling Water Reactors. The Architect / Engineer was Sargent & Lundy, Incorporated, and the primary construction contractor was United Engineers & Constructors. The Mississippi River is the condenser cooling water source. The plant is subject to license numbers DPR-29 and DPR-30, issued October 1,1971, and March 21,1972, respectively; pursuant to Docket Numbers 50-254 and 50-265. The date ofinitial Reactor criticalities for Units One and Two, respectively were October 18,1971, and April 26,1972. Commercial generation of power began on

. February 18,1973 for Unit One and March 10,1973 for Unit Two.

This report was compiled by Lynne Hamilton and Debra Kelley, telephone number 309-654-2241, extensions 3114 and 2240, respectively.

i l TECHOP3\\NIKMEl' IDS. DOC

M II.

SUMMARY

OF OPERATING EXPERIENCE A.

Unit One Quad Cities Unit One operated throughout the month of August at full power with minor down power operations for routine maintenance and surveillance testing.

B.

Unit Two Quad Cities Unit Two operated throughout the month of August at full power with minor down power operations for routine maintenance and surveillance testing.

l i:

').

~

0 4

- s 11rHOMWRCWITM. DOC L...

...~ --

i Ill. OPERATING DATA STATISTICS C.

Unit One Operating Data Report for August 1998 DOCKET NO.:

50-254 DATE:

September 9,1998 COMPLETED BY: Lynne Hamilton TELEPHONE:

_(309) 654-2241 OPERATING STATUS 0000 080198

1. REPORTING PEPJOD: 2400 083198 GROSS HOURS IN REPORTING PERIOD: '144
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2511 MAX > DEPEND > CAPACITY: 769 DESIGN ELECTidCAL RATING (MWe-NET): 789 TIIIS MONTil YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.00 2182.40 174557.80
4. REACTOR RESERVE SHUTDOWN HOURS 0.00 0.C0 3421.90
5. HOURS GENERATOR ON LINE 744.00 2098.50 169393.80
6. UNIT RESERVE SHUTDOWN HOURS 0.00 0.00 909.20
7. GROSS THERMAL ENERGY GENERATED (MWH) 1863062.40 4977223.20 370414465.80
8. GROSS ELECTRICAL ENERGY GENERATED (MWH) 596663.00 1567972.00 119821341.00
9. NET ELECTRICAL ENERGY GENERATED (MWH) 569076.00 1491821.00 107646790.00
10. REACTOR SERVICE FACTOR 100.00 37.43 75.47
11. REACTOR AVAILABILITY FACTOR 100.00 37.43 76.94
12. UNIT SERVICE FACTOR 100.00 35.99 73.23
13. UNIT AVAILABILITY FACTOR 100.00 35.99 73.63
14. UNIT CAPACIT Y FACTOR (Using MDC) 99.47 33.27 60.52
15. UNIT CAPACITY FACTOR (Using Design Mwe) 96.94 32.43 58.98
16. UNIT FORCED OUTAGE RATE 0.00 0.02 7.15 nrHOmNRC\\Srfi98. DOC

l III. OPERATING DATA STATISTICS 1

D.

Unit Two Operating Data Report for August 1998 DOCKET NO.:

50-265 l

DATE:

September 9,1998 1

COMPLETED BY:. Lynne Hamilton TELEPHONE:

(309) 654-2241 OPERATING STATUS 0000 080198

1. REPORTING PERIOD: 2400 083198 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2511 MAX > DEPEND > CAPACITY: 769 DESIGN ELECTRICAL RATING {MWe-NET): 789 TIIIS MONTil YEAR TO DATE CUMULATIVE j
3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.00 2363.25 166730.30
4. REACTOR RESERVE SHUTDOWN HOURS 0.00 0.00 2985.80
5. HOURS GENERATOR ON LINE 744.00 2245.60 162215.45
6. UNIT RESERVE SHUTDOWN HOURS 0.00 0.00 702.90
7. GROSS THERMAL ENERGY GENERATED (MWH) 1859968.80 5373847.20 353730103.52
8. GROSS ELECTRICAL ENERGY GENERATED (MWH) 593490.00 1677477.00 113440021.00
9. NET ELECTRICAL ENERGY GENERATED (MWil) 569025.00 1601069.00 107548527.00
10. REACTOR SERVICE FACTOR 100.00 40.53 72.57
11. REACTOR AVAILABILITY FACTOR 100.00 40.53 73.87
12. UNIT SERVICE FACTOR 100.00 38.51 70.61
13. UNIT AVAILABILITY FACTOR 100.00 38.51 70.91
14. UNIT CAPACITY FACTOR (Using MDC) 99.46 35.71 60.87
15. UNIT CAPACITY FACTOR (Using Design Mwe) 96.94 34.80 59.33
16. UNIT FORCED OUTAGE RATE 0.00 4.41 11.10 I

.g.

TFI' HOP 3\\NRC\\SEP198. DOC

_ ~....

- =..

IV. UNIT SHUTDOWNS A. Unit One Shutdowns for August 1998 DOCKET NO,:

50-254 DATE:

September 9,1998 COMPLETED BY: Lynne Hamilton TELEPHONE:

(309) 654-2241 J

F OR S l DURATION TYPE REASON METIIOD OF CORRECTIVE j

No.

DATE (HOURS)

SilUITING ACTIONS / COMMENTS i

DOWN REACTOR None None for the Month of August

)

l l

l Legend-(1) Reason A - Equipment FailuA (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training / License Examination F-Administrative 0 - Operatioral Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip / Scram 3 - Automatic Trip / Scram

' 4 - Coct.iwatson 5 - Other (Explain) 1TCHOP3WRCMEFIDS. DOC

..~ _.

O

-.ca.

IV. UNIT SHUTDOWNS B. Unit Two Shutdowns for August 1998 -

DOCKET NO.:

50-265 DATE:

September 9,1998 COMPLETED BY: Lynne Hamilton TELEPHONE:

(309) 654-2241 No.

DATE TYPE DURATION REASON METHOD OF CORRECTIVE.

F OR S (HOURS)

SIIUTTING ACTIONS / COMMENTS DOWN RFACTOR None None for the Month of Augut Legend:

(1) Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training / License Examination F-Administrative G - Operational Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip / Scram 3 - Automatic Trip / Scram 4 - Continuation 5 - Other (Explain) 10-UCHOPENHC\\SEPIM. DOC

4 -

V. Amendments to Facility License or Technical Soccificatiqn_j There were no Amendments to the Facility License or Technical Specifications for the reporting period.

L 1

l e

d ECHOPhMRCWEm8. DOC i

. ~ _.

.,l.b t

VI. UNIOUE REPORTING REOUIREMENTS 4

- The following items are included in this report based on the requirements set forth in Technical Specification 6.9.A.S.

4

'A~

Main Steam Relief Valve Operations -

There were no Relief Valve Operations during the reporting period.

5 TECHOP3\\NRC\\SEm8. DOC

+

e

.