Text
~
. y.'
Esif Comm IIh Edison l
Quad-Citts Gen:r* ting Station Post Office Box 216 Oxdova, Illinois Ei1242 f
Telephone 309/654 2241 NJK-75-396 Telecopy: Region lil, Attention:
Mr. C. Feierabend August 5, 1975 J. Keppler, Regional Director Directorate of Regulatory Operations u,
Region lli U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, lilinois 60137
Reference:
Quad-Cities Nuclear Power Station, Unit 1 iDocket No. 50-254, DPR-29 Appendix A, Sections 1.0.A.4, 3.1.a., 6.6.B.I.a
Dear Hr. Keppler:
The purpose of this letter is to provide you with notification of an Abnormal Occurrence as required by Technical Specification 6.6.B.I.a within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the occurrence.
At 1430 hrs on August 5, 1975, while performing monthly surveillance calibration of the Reactor High Pressure scram switches, it was discovered that PS-1-263-55A was stl11 valved out from the last month's surveillance.
The switch was calibrated and valved in service.
The other.three switches were tested and-found-to have trip points within limits.
This occurrence 'was discussed by telephone with Mr. Knop of your office on August 5, 1975.. Further information will be provided by Abnormal Occurrence Report A0 50-254/75-19 which will be submitted within 10 days of the date of this occurrence.
Very truly yours, COMMONWEALTH EDISON COMPANY QUAD-CITIES NUCLEAR POWER STATION
//b
/$5 0 ISl3 r
N.J. Kalivianakis
/[
Station Superintendent 433"
^ "( N.
NJK/RAR/vmb cc Dire.torate of Licensing e --.-,,,,..:
-nen, aa-B306160349 750005 l
PDR ADDCK 05000254 S
-