Forwards Reactor Vessel Level Instrumentation Sys Implementation Ltr Rept,In Response to NRC 850202 Safety Evaluation
ML20135A778
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 09/03/1985
From: Withers B
PORTLAND GENERAL ELECTRIC CO.
To: Butcher E
Office of Nuclear Reactor Regulation
References
TAC-45175, NUDOCS 8509100269
Download: ML20135A778 (3)


Text

t t

Portland General ElectricConpay r -- E Eb.1 D. Wahers Vce Presdert September 3, 1985 Trojan Nuclear Plant Docket 50-344 License NPF-1 Director of Nuclear Reactor Regulation ATTN: Mr. E. J. Butcher, Jr., Acting Chief Operating Reactors Branch No. 3 Division of Licensing U.S. Nuclear Regulatory Commission Washington DC 20555

Dear Mr. Butcher:

Implementation Letter Report Reactor Vessel Level Instrumentation System Your letter of February 2,1985 containing the safety evaluation for the Reactor Vessel Level Instrumentation System (RVLIS) requested the submittal of an implementation letter report. This report is attached.

Sincerely, Bart D. Withers i Vice President l Nuclear 1

Attachment I c: Mr. Lynn Frank, Director State of Oregon j Department of Energy Mr. John B. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Conunission f

Qf

' I I 8509100269 850903 l PDR ADOCK 0b000344 {

PDR 121 S W SYrron Strat. Portml Ong;n (37204

4 Trojan Nuclear Plant Mr. E. J. Butcher Docket 50-344 September 3, 1985 License NPF-1 Attachment Page 1 of 2 RVLIS Implementation Letter Report The RVLIS installation, functional testing, and calibration are complete.

The test results are available for inspection and demonstrate the system's performance is in accordance with design expectations and error tolerances.

The final system description is unchanged from that provided in our previ-ous submittals; however, the following clarification should be noted:

1. Appendix B of NUREG-0737 requires redundant or diverse channels be electrically independent and physically separated in accordance with Regulatory Guide 1.75 up to and including any isolation device.

Regulatory Guide 1.75 is the NRC guidance for complying with the physical separation and electrical independence requirements of IEEE 279-1971 and General Design Criteria 3, 17, and 21. Trojan was designed prior to the issuance of Regulatory Guide 1.75. In general, the cable and raceway systems were designed and installed in accordance with IEEE Transactions Paper 17TP83, as stated in Updated FSAR Sec-tion 8.3.1.4. The protection systems were designed in accordance with IEEE 279-1971 in order to meet General Design Criterion 21, as stated in Updated FSAR Section 3.1.3. The methods by which Trojan meets General Design Criteria 3 and 17 are specified in Updated FSAR Sections 3.1.1 and 3.1.2, respectively. Since the RVLIS has redundant circuits which are routed in train-separated channelized raceways from sensors to displays, the intent of the NUREG-0737 design criteria to install reliable instrumentation is considered to have been met.

2. Appendix B of NUREG-0737 requires periodic testing of instrument channels be done in accordance with the applicable portions of Regula-tory Guide 1.118. Regulatory Guide 1.118 references IEEE 338-1977, which applies to protection systems, not indicating systema. The RVLIS complies with those Regulatory Guide criteria deemed applicable for indicating systems.

The testing of the RVLIS will le performed in accordance with the Trojan Technical Specification requirements when issued. The Technical Specification requirements address testing intervals and the types of tests to be performed and are considered adequate.

Regulatory Guide 1.118 criteria for procedure format and documentation (Section 6.6 of IEEE 338-1977) have not been implemented since the current procedure format and documentation requirements for instru-mentation and control testing are considered adequate.

3. Appendix B of NUREG-0737 also requires seismic qualification in accor-dance with Regulatory Guide 1.100. The RVLIS has been seismically qualified to IEEE 344-1975 in lieu of the requirements of Regulatory Guide 1.100. This qualification is considered adequate.

i t Trojan Nuclear Plant Mr. E. J. Butcher Docket 50-344 September 3, 1985 License NpF-1 Attachment Page 2 of 2 Our submittal of August 7,1985 (License Change Application 125) r1 guested changes to the Trojan Technical Specifications to incorporate the RVLIS and core exit thermocouples. The subcooling margin minitors are already contained in the Trojan Technical Specifications.

NRC approval of the Trojan RVLIS is hereby requested. It is our intent to declare the RVLIS operational coincident with the implementation of the. revised Emergency Cperating Procedures (EOPs). The revised EOPs conform to the NRC-approved EOP Guidelines and their implementation is expected to occur af ter November 1,1985, but no later than December 31, 1985. Operating training on the RVLIS is currently in progress and will be complete prior to November 1, 1985.

I SAB/3mc 1274G.885