ML20151W538

From kanterella
Jump to navigation Jump to search
Forwards Rev 22 to PGE-8010, Poge Nuclear QA Program for Trojan Nuclear Plant. Rev Reflects Administrative Changes That Continue to Meet Requirements of 10CFR50,App B
ML20151W538
Person / Time
Site: Trojan  File:Portland General Electric icon.png
Issue date: 08/25/1998
From: Quennoz S
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20151W542 List:
References
VPN-041-98, VPN-41-98, NUDOCS 9809160021
Download: ML20151W538 (6)


Text

_ . _ . ~ _ _ . _ _ _ _ _ . _ _ _ . . _ . _ _ . _ _ _ _ _ . _ -

Portland General Electric

,' Trojan Nuclear Plant 71760 Columbia River Huy Rainier OR 97048 (503)$563713 August 25,1998 VPN-041-98 Trojan Nuclear Plant Docket 50-344 License NPF-1 Docket 72-0017 U.S. Nuclear Regulatory Commission

. Attn: Document Control Desk Washington, DC 20555 Director, Spent Fuel Projects Of0ce Office of Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555 Portland General Electric (PGE) Nuclear Quality Assurance Program for Troian Nuclear Plant (PGE-8010. Revision 22)

In accordance with 10 CFR 50.54(a)(3), enclosed with this letter is Revision 22 to PGE-8010, I

" Portland General Electric Nuclear Quality Assurance (QA) Program for Trojan Nuclear Plant."

This revision reflects administrative changes that continue to meet the requirements of 10 CFR 50, Appendix B. g The attachment to this letter provides a description of, and justification for, changes. The enclosure provides the revised pages for insertion into your controlled copy of PGE-8010.

Changes are identified by a revision bar in the margin of the new text pages. PGE certifies that PGE-8010, Revision 22, accurately presents changes made since the previous submittal (PGE-8010, Revision 21, under Dockets 50-344 and 72-0017).

In a previous letter (VPN-054-95, dated October 9,1995), PGE notified the NRC of its intent to apply its 10 CFR 50, Appendix B, QA Program to the Trojan Independent Spent Fuel Storage L Installation (ISFSI) activities and subsequently submitted the QA Program (then Revision 19) as part ofits 10 CFR 72 license application under Docket 72-0017.

, 9009160021 980825

.; s i i 9 -

a l

. . . . - - . . . _ . - ~.. . - . . - - . - - - - - . - - , .

L 1 VPN-041-98 (continued)

L August 25,1998 l Pane 2 of 2 '

Revision 21 was previously submitted under Dockets 50-344 and Docket 72-0017 because the l

! changes included in Revision 21 impacted Trojan's 10 CFR 72 license application. Revision 22, i

!- - which also includes ISFSI-related changes, is being submitted under Docket 72-0017 to support i NRC's ongoing review of the QA Program for compliance with 10 CFR 72, Subpart G.

If you'should have any questions, please contact Mr. Ray Pate, of my staff, at (503) 556-7480.

Sincerely, E s_ -nsO =

' I 0' .

1 1

Stephen M. Quennoz Trojan Site Executive i Enclosure  !

l.

{

l - Attachment I c: D. Stewart-Smith, OOE (w/o enclosure)

. R. A. Scarano, NRC Region IV (w/o enclosure)

- L. H. Thonus, NRC, NRR (w/o enclosure) l l'

l l

I' t

t

(.

v.

l

l

( l 1

l HRP-129-98 l l

TO: Distribution l l l l FROM: H. R. Pate i 1

- DATE: August 25,1998 l

SUBJECT:

Transmittal of Revision 22 to the Trojan Nuclear Plant Nuclear Ouality Assurance Program. PGE-8010 I l

Enclosed are replacement pages for your Controlled Copy of the Trojan Nuclear Plant Nuclear Quality Assurance Program, PGE-8010. The pages are to be inserted in accordance with the accompanying instruction sheet.

l.

. Please acknowledge receipt of your copy by completing the lower portion of this transmittal and returning it to the location given below.

HRP/CKC Enclosure ACKNOWLEDGMENT PGE-8010, Trojan Nuclear Plant Nuclear Quality Assurance Program Revision 22 I hereby acknowledge receipt of Controlled Copy number N of the subject document. All changes have been made in accordance with the instructions, and superseded pages have been destroyed.

Signature of Copy Holder Date L Return to: Pat Schaffran/TCB-3 l Trojan Nuclear Plant 71760 Columbia River Highway

( Rainier, Oregon 97048 a

r l

Attachment to VPN-041-98 August 25,1998 l

Pace 1 of1 l

l The following Licensing Document Change Request (LDCR) is incorporated into Revision 22.

A brief description of the LDCR and basis for the changes is included below.98-032

1. ' These administrative changes update the Quality Assurance Program for consistency with the

' August 1998 re-write of the Trojan Independent Spent Fuel Storage Installation (ISFSI) proposed  ;

Technical Specifications.

J

, The proposed ISFSI Technical Specifications presently contain Section 5.5.2, which covers the ISFSI Safety Review Committee (ISRC) review functions. Also, Section 1.2.2 presently states that these ISRC review functions are required by the ISFSI Technical Specifications. During August 1998 the ISFSI Technical Specifications were re-written to relocate the ISRC review functions to the ISFSI Safety Analysis Report. As a result, the Quality Assurance Program, Section 1.2.2, is changed to reflect the new location (ISFSI SAR) of these ISRC review functions.

1 I

l r

L L

L

. . . . - - .- .. _ - . - . . = . . .- . .- _-

STATE OF OREGON, )

)

-)

COUNTY OF COLUMBIA )

l I, Stephen M. Quennoz, being duly sworn subscribe to and say that I am the Trojan Site Executive for Portland General Electric Company, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.

Date: Aunust 24.1998 l

1 fr%> Mm= y Stephe'n M. Quennoz U l Trojan Site Executive Portland General Electric Company On this day personally appeared before me Stephen M. Quennoz, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act.

1 GIVEN under my hand and seal this 24th day of August,1998.

s &c&

9 clNefbCNise NOTW PUBUC-OREGON COMMISSION NO.045727 Wh EMES Juur 27.1915 NotarfMiie in and for the State of Oregon Residing a e/uelu flou O '

My commission expires 7/A7 /CH l

f i

l .

g TROJAN NUCLEAR PLANT PGE-8010," Trojan Nuclear Plant Nuclear Quality Assurance Program"

i Revision 22 l

The following information is provided as a guide for the insertion of new sheets for Revision 22 into PGE-8010," Trojan Nuclear Plant Nuclear Quality Assurance Program."

New sheets should be inserted as listed below:

Remove Page Insert Pane Program:

Title Page Title Page i ii ii List of Effective Pages:

y y

Section 1: l l-2 1-2 l l

jI p

e i

i 4

_ _ _