ML20206N941

From kanterella
Jump to navigation Jump to search
Forwards Revised Epips,Including Rev 7 to EPIP 3, Response Organization Checklists & Rev 9 to EPIP 5, Emergency Preparedness Test Propgram. Changes to EPIPs 3 & 5 Ref New Owners of on-site Railroad Line,Portland & Western Railroad
ML20206N941
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 05/11/1999
From: Quennoz S
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20206N945 List:
References
VPN-049-99, VPN-49-99, NUDOCS 9905180109
Download: ML20206N941 (2)


Text

F l

t e O

PGE - a-m-* --v Trojan Nudear Plant 71760 Columbia River Huy Rainier oR 97048 (503) 556-3713 May 11,1999 1

VPN-049-99 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission ATrN: Document Control Desk Washington, DC 20555 Transmittal of Emergency Plan Implementing Procedures In accordance with 10 CFR 50, Appendix E.V this letter transmits a revised copy of Trojan Nuclear Plant Emergency Plan Implementing Procedure (EPIP) 3, Revision 7; and EPIP 5, i Revision 9. The changes to EPIPs 3 and 5 reference the new owners of the on-site railroad line, Portland and Western Railroad.

Sincerely, 1

p}ArWg Stephen M. Quennoz Vice President, Nuclear j and Thermal Operations 1 l

Enclosure /

l c: Director, NRC, NMS, Region IV (w/ 2 Enclosures to Region IV) h)O b ,

L. H. Thonus, NRC, NRR (w/o Enclosure) l D. Stewart-Smith,00E (w/o Enclosure) l l

9905180109 990511 ,,

I PDR ADOCK 05000344 .L 7 ,

F PDR l Connecting People, Power and Possibilities /-

1

SET: 427 USNRC UPDATED May 5,1999 Document Control Desk '

clo Cindy Casciato TRANSMITTAL NO.99-085 Emergency Procedures PROCEDURE CHANGES Instructions for Filino Please insert the attached changes in your manual as directed below:

REMOVE BEE INSERT HEE EPIP 3 7 EPIP 3 7 Pages 1 thru 8 Pages 1 thru 8 (correction pgs)

EPIP S 9 EPIP 5 9 Page 1 Page 1 Pages 21 and 22 Pages 21 and 22 (correction pgs) i1

, _