Submits Following Info That Will Be Needed for NRC Staff to Complete Review & Issue Trojan ISFSI License,As Result of 990121 Meeting with NRC Following Insp & Observation of ISFSI Preoperational Testing During Wk of 990118
ML20202G093
Person / Time
Site: Trojan  File:Portland General Electric icon.png
Issue date: 01/26/1999
From: Quennoz S
PORTLAND GENERAL ELECTRIC CO.
To: Kobetz T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
VPN-015-99, VPN-15-99, NUDOCS 9902040297
Download: ML20202G093 (2)


Text

. . . . , . _ . . . _. __ . _ __ _ _ _ _ _

. . . .m .

Pn 1"' GE =i a a Trojan Nuclear Plant i i *ric c - r 71760 Columbia RiverHwy Rainier OR 97048 (so3>5563ns January 26, '1999 VPN-015-99 TrojanISFSI Docket 72-017

~ U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attention: T. J. Kobetz, Project Manager NMSS,SFPO

Dear Sir:

Schedule for Submittal of Additional Information for the Troian ISFSI In' the January 21,1999, NRC exit meeting following inspections and observations ofISFSI Preoperational Testing during the week of January 18, it was identified that additional

. information, including changes to the application, would be needed to complete the ISFSI licensing process. Specifically, the following information will be needed for the NRC Staff to complete their review and issue the Trojan ISFSI License (dates for submittal of the additional info'rmation are provided for each item):

/g

1. An update to the ISFSI Emergency Plan, PGE-1070 2/12/99
2. Results of the load test of the PWR Basket structural lid hoist rings (testing completed by 2/25/99) 3/4/99
3. Proposed Technical Specification (LCO, SR, and Bases) for the length of time the Air Pads can be installed and inflated 2/12/99

- 4. An update to the ISFSI SAR and a revised calculation to correct a minor discrepancy in the Concrete Cask tipover analysis 2/12/99

5. An update to the ISFSI SAR to clarify that the Overpack is to be used for Interim Storage until an analysis conforming to the SRP criteria is performed, submitted, and approved 2/12/99 9902040297 990126 T ,

PDR ADOCK 05000344 ,

y PDR- g Connecting People, Power and Possibilities @

-VPN-015-99 ~

~

January 26,1999

  • Pdg$ 2 of 2 "

3

. 6. A request for an exemption from 10 CFR 72.70 that requires

. the final SAR submittal at least 90 days prior to fuel loading 2/12/99

)

If you have any questions regarding this information, please contact Lanny Dusek of my staff at (503) 556-7409.-

Sincerely,

,M e:J~Mc=h p ==

Stephen M. Quennoz Vice President Nuclear and Thermal Operations cc: L. H. Thonus, NRC, NRR R. A. Scarano, NRC Region IV David Stewart-Smith, OOE i