E, e, s.

E a *iada Trojan Nuclear Plant i'i *ricc - r 71760 Columbia Riwr Huy Rainier. OR 97048 (503) SS6-3713 August 16,1999 VPN-074-99 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Fitness For Duty Program Performance Data Renort Please find enclosed Portland General Electric (PGE) Company's Fitness For Duty Program Performance Data Report for the period beginning January 1,1999, and ending June 30,1999. This report is submitted in accordance with 10 CFR 26.71(d).

Sincerely, fphN - .

Stephen M. Quennoz Vice President, Nuclear and Thermal Operations Attachment

Enclosures:

1) Fitness for Duty Performance Data j ,
2) Breakdown of Confirmed Positive Tests for Specific Substance _

c: D. Stewart-Smith, 00E I Director, NMS, NRC, Region IV  !

L. H. Thonus, NRC, NRR nA00 9900250054 990816 .hO PDR ADOCK 05000344 .

l R PDR i

Connecting People, Power and Possibilities 0 1

Attachment to VPN-074-99 August 16,1999 Eage1of1 Fitness For Duty Program Performance Data Report ,

i During the reporting period, January 1,1999, through June 30,1999, the Trojan Nuclear Plant Security Department continued to operate under the Trojan Nuclear Plant Security Plan '

(Defueled Condition). The Security Plan contains a commitment to 10 CFR 26 for unescorted access to the Trojan Protected Area.

Effectiveness Summary During this reporting period there were two positive pre-access drug tests. Both positive tests involved contract personnel. No appeals of the positive drug tests were submitted. No individual's unescorted access was temporarily suspended under the provisions of 10 CFR 26.24(d).

Events Reported No reportable events occurred during this reporting period.

l Statistical Summarv i The average population granted unescorted access to the Trojan Protected Area during this ,

reporting period was 438, of which 29 percent were randomly screened. During this reporting period, the Fitness For Duty Program conducted 105 pre-access drug and alcohol tests, 129 random drug and alcohol tests,16 follow-up drug and alcohol tests,2 return to work drug i and alcohol tests,2 post-accident dmg and alcohol tests, and 2 reasonable suspicion drug and alcohol tests. PGE's overall positive rate for pre-access testing was 2 percent (0 percent for PGE employees and 2 percent for contract personnel.) PGE's overall positive rate for the random l screening program was 0 percent (0 percent for PGE employees and 0 percent for contract personnel). The positive rate for all testing during the period January through June 1999 was 1 percent.

r- 1

.. ~

P.nclonuro 1 to VPN-074-99 )

. l l

FITNESS FOR DUTY

j. PERFORMANCE DATA j PERSONNEL SUBJECT TO 10 CFR 26 Portland General Electric Company June 30, 1999 Company 6 Months Ending Trojan Nuclear Plant, 71760 Columbia River Hwy., Rainier, OR 97048 Location Manuel D. Gatlin, Manager, Nuclear Security (503) 556-6429 Contact Name Phone (include area code)

Cutoffs: Screen / Confirmation (ng/ml) O Appendix A to 10 CFR 26 Marijuana 20/15 Amphetamines 1000/500 Barbiturates 300/200 Cocaine 300/150 Phencyclidine 25/25 senzadiazepenes 300/200 Opiates 300/300 Alcohol (%BAC) 0.04%

Testing Results Licensee Employees Long-Term Short-Term Contractor Contractor Personnel Personnel Average Number With Unescorted Access 269 7 162 i Categories Tested Positive' Tested Positive

  • Tested Positive l Pre-Access 34 o 9 9 9 9 71 2 2 For C Post-Accident 2 9 9 9 9 9 9 9 9 a

u a

Observed Behavior 2 9 9 9 9 9 9 9 9 Random 82 9 9 1 9 9 46 9 9 Follow-up 16 9 9 9 9 9 9 9 9 other Return to Work 2 9 9 9 9 9 9 9 9 Total 138 9 9 1 9 9 117 2 2 NRC PGE NRC PGE NRC PGE

' Separate columns for reporting positive tests using NRC and PGE confirmation levels.

Attachment 3 Page 1 of 2

{

]

TPP 23-3 i Revision 4 q Page 31 of 42 I

a 1 . .

[ ou@ ,O $^ e*

E d .

N A

T S 5 B

U 4 S

3 C

I n z

F e 2 0 0 0 0 I B C b r

a 1 0 0 E B 0 0 P l at s S s e fTu 0 0 0 0 R e Rt o O

F l o

S h o 0 0 T c 0 0 S

l A

E T y-E c e n ni 0 0 0 0 V

I ed hi P c l

T I -

S e s hpi ne O mma 0 0 0 0 P At D s E t e

a M i O

p 0 0 0 0 R

I F e n 0 0 N i a

c 0 0 O C o

C 0 0 F a 0 0 2 E

O n a

u 2

G P

N j i

r a C R

W M 0 0 2 2 N O

D K

A s e mr s r o ms r

E ee ey et c

r o et R s o nl T- a r

Tc- a tr tr B ep cm gt n n oo on l

t a

i h o o LE LC SC T