Forwards Updated ISFSI Emergency Plan,Per 981123 & Discussion in Meeting with NRC on 981119.Description of Changes Encl
ML20198E398
Person / Time
Site: Trojan  File:Portland General Electric icon.png
Issue date: 12/17/1998
From: Quennoz S
PORTLAND GENERAL ELECTRIC CO.
To: Kobetz T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20198E405 List:
References
VPN-080-98, VPN-80-98, NUDOCS 9812240046
Download: ML20198E398 (5)


Text

'

12-r/ ,

GE e i 4 Trojan Nudear Plant

.iai ,i co- ,.., .

71760 Columbia River Huy Rainier OR 97048  ;

i503)556-3713 December 17,1998 VPN-080-98 Trojan ISFSI Docket 72-017 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 '

Attention: T. J. Kobetz, Project Manager, NMSS, SFPO

Dear Sir:

1 Submittal of Updated Independent Spent Fuel Storage Installation (ISFSI)

Emergency Plan (PGE-1075)

Pursuant to our letter dated November 23,1998 (VPN-075-98), and discussions in our meeting with you on November 19,1998, enclosed is an updated ISFSI Emergency Plan. Although the entire document has been retyped and is being resubmitted (i.e., in lieu of revised pages), only those sections with a vertical line in the right-hand margin adjacent to them have been changed.

Much of the added material is identical to that in the ISFSI Safety Analysis Report. A description of the changes is provided in the Attachment.

If you have any questions regarding this information, please contact Mr. Lansing Dusek, of my staff, at (503) 556-7409.

Sincerely, T

$9 Stephen M. Quennoz 9812240046 981217 PDR F ADOCK 05000344 "f ,

and Thermal Operations \{

pop Attachment Enclosure p k

'O dW;w e z ~~(

cc: L. H. Thonus, NRC, NRR R. A. Scarano, NRC Region IV G3a W L i(4 i David Stewart-Smith, OOE

~

n *S Connecting People, Power and Possibilities i f

Attachment to VPN-080-98 December 17,1998 bge1ofI Summary of Changes to PGE-1075 (December 1998 Draft):

Section(s) Affected Summary of Change Reason for Change 1.0 Introduction Added descriptive information on the To make PGE-1075 a ISFSI, site and facility, use of adjacent " stand-alone" document lands and waters, and nearby industrial in accordance with an facilities and transportation routes, NRC request.

including three figures from the ISFSI SAR.

2.0 Types of Off- Added descriptive information on off-Normal and normal and postulated accident Postulated conditions, and off-normal / accident Accident detection from the ISFSI SAR.

Conditions 4.0 Organizational Added descriptive information on the Response normal facility organization, including an organizational chart from the ISFSI SAR.

Changed name of railroad from To reflect new railline Burlington Northern to Willamette and operator.

Pacific.

5.0 Emergency Added statement that dosimetry is issued To ensure proper Response to responders as warranted by conditions. radiological protection.

Measures l

l 6.0 Facilities and Added description of radios as back-up To ensure purpose of Equipment method to communicate with the System radio equipment is Control Center and Columbia County. understood.

Added requirement that radiation survey To ensure emergency l equipment be calibrated. radiological conditions l can be properly assered.

1.0, 3.0, 4.0, 5.0, Made minor editorial changes such as To improve readability.

6.0, and 7.0 changing " local offsite assistance" to

" local offsite agency assistance," and l

adding a reference to the appendix.

l l

LGD-012-98 TO: Distribution l I

FROM: L. G. Dusek l

DATE: December 17,1998

SUBJECT:

Transmittal of PGE-1075, Independent Spent Fuel Storage Installation Emergency Plan. December 17.1998 Draft Version Enclosed are replacement pages for your Controlled Copy of the December 17,1998, Draft Version of the Trojan Nuclear Plant Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan, PGE-1075. The report is to be replaced in its entirety.

Please acknowledge receipt of your copy by completing the lower portion of this transmittal and returning it to the location given below.

LGD/CKC Enclosure 12/17/98 ACKNOWLEDGMENT PGE-1075, Independent Spent Fuel Storage Installation Emergency Plan December 17,1998 Draft Version I hereby acknowledge receipt of Controlled Copy number the subject document. All l changes have been made in accordance with the instructions, and superseded pages have been destroyed.

( Signature of Copy Holder Date Return to: Pat Schaffran/TCB-3

[ Trojan Nuclear Plant 71760 Columbia River Highway Rainier, Oregon 97048 I

i

i l I

( STATE OF OREGON, )

l ) l l )

! COUNTY OF COLUMBIA )

I, S. M. Quennoz, being dely sworn, subscribe to and say that I am the Vice President Nuclear and l Thermal Operations for Portland General Electric Company, the licensee herein; that I have full j authority to execute this oath; that I have reviewed the forego ~ g; and that to the best of my i knowledge, information, and belief the statements made in it e true. i Y

Date M./ /77 ,1998 l

,Mr'= W

" S. M. Quennoz, U 1

Vice President Nuclear and Thermal Operations Portland General Electric Company On this day personally appeared before me, S. M. Quennoz; to me known to be the individual who executed the foregoing instrument, and acknowledged a he signed the same as his free act.

GIVEN under my hand and seal this / f day of [A8#n/' ('d ,1998.

OFFICIAL SEAL PAT SCHAFFRAN

/7 x 9,coutjpgggogyg5 u

bOTARY PUBUC-OREGON s

3999 NotarWy u h. <e m anf f , e State of Oregd . -

l Residing at .- ////2[

l My commiss[on expires PcJ 7 99 l l

I i

l

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

PORTLAND GENERAL ELECTRIC COMPANY ) Docket 72-017 THE CITY OF EUGENE, OREGON, AND )

PACIFIC POWER & LIGHT COMPANY )

(TROJAN NUCLEAR PLANT) )

. CERTIFICATE OF SERVICE I hereby certify that copies of the updated Independent Spent Fuel Storage Installation Emergency Plan, PGE-1075, have been served on the following by hand delivery or by deposit in the United States Mail, first class, this 17th day of December 1998:

State of Oregon Attn: David Stewart-Smith Oregon Office of Energy 625 Marion Street NE Salem, Oregon 97301 Chairman of County Commissioners Columbia County Courthouse St. Helens, Oregon 97051 9

'M e D. L.Mordstrom General Manager, Nuclear Oversight, Plant Suppon and Technical Functions On this day personally appeared before me D. L. Nordstrom, to me known to be the individual who executed the foregoing instrument, and acknowledged that M signed the same as his free act.

GIVEN under my hand and seal this 17th day of Decem /'/

e 1998.

F

  • k Z' lMh Notary PiibU *n and J

'e State of Oregon G NOTARYPUBUC-OREGON wc0ENEY71999 Residing, - 81 5' My commission expires 7 O 7%

. -~