Informs That NRC Staff Has Performed an Acceptance Review of Trojan Nuclear Plant License Termination Plan,Submitted by ,To Determine Whether LTP Provides Adequate Info to Allow Staff to Conduct Detailed Review
ML20206E173
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 04/29/1999
From: Thonus L
NRC (Affiliation Not Assigned)
To: Quennoz S
PORTLAND GENERAL ELECTRIC CO.
References
TAC-MA5016, NUDOCS 9905050041
Download: ML20206E173 (3)


Text

"

Mr. St: phen M. Quennoz April 29, 1999 Vice Pr:sident Nucle:r cnd Thermtl Operctions s

j y Troj:n Nucle:r PI:nt Portland General Electric Company 71760 Columbia River Highway Rainier, Oregon 97048

SUBJECT:

COMPLETENESS REVIEW OF TROJAN UCENSE TERMINATION PLAN

(TAC NO. MA5016) l i

Dear Mr. Quennoz:

L The NRC staff has performed an acceptance review of the Trojan Nuclear Plant License l

Termination Plan (LTP), submitted by letter dated March 10,1999, tr. wtermine whether the LTP provides adequate information to allow the staff to conduct a dea ~ ! review. We compared the submitted application with draft NUREG-1700, "The Star,sard Review Plan for Evaluating Nuclear Power Reactor License Termination Plans," and Regulatory Guide 1.179,

" Standard Format and Content of License Termination Plans for Nuclear Power Reactors." We have concluded that the LTP does not provide sufficient information to allow the staff to perform a detailed review.

4 Specifically, we have found that the Final Status Survey Plan (FSSP) portion of the LTP fails to address in sufficient detail the methods and assumptions used to demonstrate compliance with the radiological criteria for license termination. The FSSP provides a process for developing a survey plan; however, it does not provide the required survey protocol details or derived j

concentration guidelines. The following items need to be provided: detailed survey protocols; j

identification and characterization of each survey unit; derived concentration guideline levels; and the reference coordinate system established for the site areas.

The NRC staff would like to discuss the matter further with your staff so that you can submit an LTP that is complete and acceptable for staff review.

. Sincerely, ORIGINAL SIGNED BY:

Lee H. Thonus, Project Manager Decommissioninn Section Project Directorate IV and Recommissioning Division on Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-344 cc: See next page hf l

DISTRIBUTION:

Oseket Pile 90-344T; SBrown (T7-F27)

PUBLIC MMasnik PDIV r/f 9(Ok SRichards (013-D1) -

'JHickey (T7-F27)

LThonus Region IV EPeyton JZwolinski/SBlack (013-E4) VEverett, RIV '

SNalluswami TJohnson (T-7F27)

. AHodgdon (015-B18)-

- DOCUMENT NAME: A:\\TRJLTPRJ.WPD

  • See previous concurrence l-OFFICE PDiy,,D/PM,,

PDIV-D/PM PDIV/LA O

PDIV-D/SC OGC-NAME SN$liisi[mliac.

LThonus*

EPeyton h %

MMasnik /N AHodgdon*

4/2.8/99 4/23/99 4/ N /99 4/ 2f

/99 4/28/99 l

.OPf1CIAL RECORD COPY l

9905050041 990429 iJ PDR ADOCK 05000344 l

P PM g

ptg g

t UNITED STATES y

l}

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30606-0001 April 29, 1999 YDIephen M. Quennoz Vice President Nuclear and Thermal Operations Trojan Nuclear Plant Portland General Electric Company 71760 Columbia River Highway Rainier, Oregon 97048

SUBJECT:

COMPLETENESS REVIEW OF TROJAN LICENSE TERMINATION PLAN (TAC NO. MA5016)

Dear Mr. Quennoz:

The NRC staff has performed an acceptance review of the Trojan Nuclear Plant License Termination Pian (LTP), submitted by letter dated March 10,1999, to determine whether the LTP provides adequate information to allow the staff to conduct a detailed review. We compared the submitted application with draft NUREG-1700, "The Standard Review Plan for Evaluating Nuclear Power Reactor License Termination Plans," and Regulatory Guide 1.179,

" Standard Format and Content of License Terminaticn Plans for Nuclear Power Reactors." We have concluded that the LTP does not provide suffHent information to allow the staff to perform a detailed review.

Specifically, we have found that the Final Status Survey Plan (FSSP) portion of the LTP fails to address in sufficient detail the methods and assumptions used to demonstrate compliance with the radiological criteria for license termination. The FSSP provides a process for developing a i

survey plan; however, it does not provide the required survey protocol details or derived concentration guidelines. The following items need to be provided: detailed survey protocols; identification and characterization of each survey unit; derived concentration guideline levels; and the reference coordinate system established for the site areas.

The NRC staff would like to discuss the matter further with your staff so that you can submit an LTP that is complete and acceptable for staff review.

Sincerely, M

Lee H. Thonus, Project Manager Decommissioning Section Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-344 cc: See next page

p

- Mr. Stephen M. Quennoz Trojan Nuclear Plant Portland General Electric Company Docket No. 50-344 cc:

Chairman of the Board of County Commissioners Columbia County St. Helens, OR 97501 Mr. David Stewart-Smith Oregon Department of Energy 625 Marion Street, N.E..

Salem, OR 97310 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower and Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 8064 Mr. H. Ray Pete Manager Licensing, Compliance and Commitment Management Portland General Electric Companv Trojan Nuclear Plant 71760 Columbia River Highway Rainier, OR 97048 Mr. Lloyd K. Marbet 19142 S.E. Bakers Ferry Road Boring, OR 97009 Mr. Jerry Wilson Do it Yourself Committee 570 N.E. 53rd Hillsboro, OR 97124 Mr. Eugene Rosolie Northwest Environmental Advocates 302 Hasettine Building 133 S.W. 2nd Avenue Portland, OR 97204