ML20151X857

From kanterella
Jump to navigation Jump to search
Provides Rev 2 to Poge, Trojan NPP Permanently Defueled TS Bases. Changes Identified in Revised Text by Side Bars
ML20151X857
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 09/10/1998
From: Quennoz S
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20151X860 List:
References
VPN-050-98, VPN-50-98, NUDOCS 9809170277
Download: ML20151X857 (2)


Text

- --

L ,

Fortland General Electric Trojan Nuclear Plant 71760 Columbia Riwr Hwy Rainier OR 97048 (503)$56-3713 September 10,1998 VPN-050-98 l Trojan Nuclear Plant I Docket 50-344 License NPF-1 l l

U.S. Nuclear Regulatory Commission l ATTN: Document Control Desk l Washington, DC 20555 l I

l Troian Nuclear Plant Permanentiv Defueled Technical Specification (FDTS) Bases. Revision 2 In accordance with PDTS 5.6.4, the enclosure to this letter provides Revision 2 to Portland j General Electric Company's " Trojan Nuclear Plant PDTS Bases." The revision to the Bases  ;

changes the name of the cooling system to the Modular Spent Fuel Pool Cooling and Cleanup System and updates spent fuel pool heat up information to 31/2 years after plant shutdown. The changes do not involve a change to the Technical Specifications incorporated into the license or an unreviewed safety question as defined by 10 CFR 50.59 and, therefore, do not require prior Nuclear Regulatory Commission approval. Changes are identified in the revised text by side

- bars.

. If you have any questions concerning this document, please contact Mr. J. D. Westvold of my staff at (503) 556-6485.

Sincerely, J= <

9809170277 DR 980910 '

Trojan Site Executive ADOCK 05000344 I l

PDR a , 'a t Enclosure c: R. A. Scarano, NRC Region IV L. H. Thonus, NRC, NRR D. Stewart-Smith, OOE k>@o l 171054

l l'

JDW-004-98L l

l s TO: Distribution FROM: J. D. Westvold DATE: September 10,1998

SUBJECT:

Transmittal of Revision 2 to the Trojan Nuclear Plant Permanently Defueled Technical Specification (PDTS) Bases Enclosed is your controlled copy of Revision 2 to the PDTS Bases. To update your copy, replace pages B 3.1-7/B 3.1-8 (front /back) and B 3.1-9/B 3.1-10 (front /back) with the revised pages B 3.1-7/B 3.1-8 (front /back) and B 3.1-9/B 3.1-10 (front /back).

Please acknowledge receipt of this update by completing the lower portion of this transmittal and returning it to the location given below.

JDW/CKC Enclosure September 10,1998 ACKNOWLEDGMENT Revision 2 to the Trojan Nuclear Plant Permanently Defueled Technical Snecification (PDTS) Basg3 I hereby acknowledge receipt of Controlled Copy number the subject document. All changes have been made in accordance with the instructions, and superseded pages have been destroyed.

l_

Signature of Copy Holder Date L Return to: ' Trojan Nuclear Plant

f. ATTN: Pat Schaffran/TCB-3 l 71760 Columbia River Highway Rainier, Oregon 97048

_ ._ . _