Responds to Requesting License & Exemption Re Emergency Preparedness
ML20195J011
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 06/09/1999
From: Thonus L
NRC (Affiliation Not Assigned)
To: Quennoz S
PORTLAND GENERAL ELECTRIC CO.
References
MA3636, MA3637, TAC-MA3636, TAC-MA3637, NUDOCS 9906180058
Download: ML20195J011 (4)


Text

,. . .

s

  • C870

, 9 y i UNITED STATES g

2 j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20066 4001 o

          • / June 9, 1999 l

l Mr. Stephen M. Quennoz Vice President Nuclear and Thermal Operations l Trojan Nuclear Plant Portland General Electric Company

)

I 71760 Columbia River Highway l Rainier, Oregon 97048 i

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE CHANGE APPLICATION 244 AND ACCOMPANYING REQUEST FOR EXEMPTION (TAC NOS. MA3636 AND MA3637)

Dear Mr. Quennoz:

This is in response to your letter of August 27,1998, requesting a license change and exemption related to emergency preparedness. Please provide documentation to support the estimation of radioactive material that will remain onsite after the removal of the spent nuclear j fuel and the reactor vessel and intemals from the 10 CFR Part 50 licensed area. The exemption request states that the remaining radioactive material would be comprised of activated material contained within the concrete bioshield wall, sealed source material, and contaminated materials within plant systems. The exemption request provides the following .

values:

Activated material contained within the concrete bioshield wall: 423 Ci Stalad source material: 415 Ci (see below) l Comaminated materials within plant systems: 36.7 Cl The documentation should be given in radio-isotopic form to allow comparison with the inventory of radioactive materials specified in 10 CFR 30.72, " Schedule C - Quantities of ,

Radioactive Materials Requiring Consideration of the Need for an Emergency Plan for l Responding to a Release."

Radioactive materials in sealed form are excluded in the compilation of radioactive materials for i i comparison with the inventory in Schedule C by 10 CFR 30.32(i)(1). Therefore, provide a separate listing of sealed source materials,i.e., appropriate portion of the 415 Ciindicated in [)

the exemption request.  ;

f) l MRCIU ( H iinC8PV i

9906180058 990609 PDR ADOCK 05000344 F PDR

q.

Mr. Stephen M. Quennoz June 9, 1999 only fixed radioactive material is addressed in the exemption request. Indicate whether or not the quantity of radioactive material in the waste storage facility and from other operational sources (e.g., radioactive fluids, filter media, resins) has been accounted for in the inventory of remaining radioactive material.

This request was discussed with Lanny Dusek on May 5,1999, and the mutually agreed on target date of July 2,1999, for your response was established, if circumstances result in the need to revise the target date, please call me at the earliest opportunity.

Sincerely,

. ORIGINAL SIGNED BY:

. Lee H. Thonus, Project Manager Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docka No. 50-344 cc: See next page DISTRIBUTION-3 osahet pilea PUBLIC PDIV-D R/F JZwolinski/SBlack j SRichards MMasnik LThonus  ;

SNalluswami l EPeyton FKantor (0-12H13) ]

VEverett, RIV 4

'ACRS OGC DOCUMENT NAME:G:\PDIV-3\ TROJAN \TRJEPRAl.WPD To receive a copy of this document, indicate in the box: "C" = x l OFFICE PDIV-QEM , PDIV-D/PM PDIV/LA PDIV NSC

-lNAME SNalluiFuattik. LThonus(1U-t7 EP6y?vCF /ptMhtg Tk

.lDATE 06/ f/99 06/ 8 /99 06/R /99 U. 06/ 9 /99 OFFICIAL RECORD COPY

y

. . . - a Mr. Stephen M. Quennoz 1 Only fixed radioactive material is addressed in the exemption request. Indicate whether or not the quantity of radioactive material in the waste storage facility and from other operational sources (e.g., radioactive fluids, filter media, resins) has been accounted for in the inventory of remaining radioactive material.

This request was discussed with Lanny Dusek on May 5,1999, and the mutually agreed on j target date of July 2,1999, for your response was established. If circumstances result in the need to rer:se the target date, please call me at the earliest opportunity. .

Sincerely,

'/l- [ 1 l

Lee H. Thonus, Project Manager i l

Decommissioning Section Project Directorate IV & Decommissioning Division of Licensing Project Management l Office of Nuclear Reactor Regulation Docket No. 50-344 i i

cc: See next page 4

I f

i

F ;. . .

p. . ,

1' l

Portland General Electric Company l cc:

l Chairman of the Board of County Commissioners Columbia County St. Helens, OR 97501

Mr. David Stewart-Smith L Oregon Department of Energy l 625 Marion Street, N.E.

Salem, OR 97310 l

Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower and Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Mr. W. Lansing Dusek Manager Licensing, Compliance and Commitment Management Portland General Electric Company Trojan Nuclear Plant 71760 Columbia River Highway Rainier, OR 97048 Mr. Lloyd K. Marbet 19142 S.E. Bakers Ferry Road Boring, OR 97009 Mr. Jerry Wilson l Do it Yourself Committee 570 N.E. 53rd Hillsboro, OR 97124 l Mr. Eugene Rosolie l Northwest Environmental Advocates

302 Haseltine Building l 133 S.W. 2nd Avenue Portland, OR 97204 l

l l

June 1999 i

L _