MONTHYEARML20054F3831982-06-11011 June 1982 Forwards Addl Info Re Implementation Schedules for NUREG-0737 Items,In Response to Generic Ltr 82-10.Items Include I.A.1.3.1,I.A.1.3.2,I.C.1,II.D.1.2,II.D.1.3, II.K.3.30,II.K.3.31,III.A.1.2,III.A.2.2 & III.D.3.4 Project stage: Other ML20140E5501985-01-0404 January 1985 Forwards Schedule for Submitting Addl Info & Justification of Nonconformance of Core Exit Thermocouples & Subcooling Margin Monitors,Per 840202 SER on Util Response to Generic Ltr 82-28 & NUREG-0737,Item II.F.2 Project stage: Other IR 05000344/19850141985-06-12012 June 1985 Insp Rept 50-344/85-14 on 850513-17.Violation Noted:Failure to Perform Survey (Evaluation) of Extremity Exposure Due to Nonpenetrating Radiation Per 10CFR20.201 Project stage: Request ML20126M4801985-06-13013 June 1985 Forwards Request for Addl Info Re Core Exit Thermocouple Sys,Subcooling Margin Monitors & Reactor Vessel Level Instrumentation Sys,In Order to Complete Review of 840312 & 850104 Submittals for TMI Item II.F.2.3 Project stage: RAI ML20128B2021985-06-27027 June 1985 Advises That Response to 850612 Request for Addl Info Re NUREG-0737,Item II.D.1 Will Be Submitted by 851231 Project stage: Request ML20129K1171985-07-19019 July 1985 Responds to 850613 Request for Addl Info Re NUREG-0737,Item II.F.2, Inadequate Core Cooling Instrumentation. Class 1E Platinum Resistance Temp Detectors Will Be Used to Measure Ref Junction Temp for Backup Displays Project stage: Request ML20133K9731985-08-0707 August 1985 Proposed Tech Specs,Incorporating TMI-related Items Per NRC Model Tech Specs Project stage: Other ML20133K9571985-08-0707 August 1985 Application for Amend to License NPF-1,consisting of License Change Application 125,incorporating Tech Specs for TMI-related Items Per NRC Model Tech Specs,NUREG-0737 & Generic Ltr 83-37 Project stage: Request ML20133K9421985-08-0707 August 1985 Forwards Application for Amend to License NPF-1,consisting of License Change Application 125,incorporating Tech Specs for TMI-related Items Per NRC Model Tech Specs.Certificate of Svc Also Encl.Fee Paid Project stage: Request ML20135A3721985-09-0303 September 1985 Submits Cost Estimates for Installation of NRC Emergency Communication Circuits in Emergency Operations Facility.New Emergency Facility Scheduled for Completion by 861231. Facility Drawings Encl Project stage: Other ML20135A7781985-09-0303 September 1985 Forwards Reactor Vessel Level Instrumentation Sys Implementation Ltr Rept,In Response to NRC 850202 Safety Evaluation Project stage: Other ML20198C2571985-11-0505 November 1985 Forwards Addl Info Re Inadequate Core Cooling Instrumentation Installed or Proposed for Installation,In Response to NRC 850910 Onsite Evaluation.W/One Oversize Drawing Project stage: Other ML20137A9941985-11-21021 November 1985 Advises That Isolation Capability of Control Room Normal Ventilation Sys CB-2 Adequate.No Mods Required to Meet Intent of NUREG-0737,Action Item III.D.3.4, Control Room Habitability & GDC 19 Based on Listed Reasons Project stage: Other ML20136C6401985-12-20020 December 1985 Forwards Draft SER Re Tech Spec Changes & Draft Transmittal Ltr to Licensee.Proposed Amend to License NPF-1 Approved. SALP Input Also Encl Project stage: Draft Approval ML20136F2671985-12-31031 December 1985 Forwards Response to 850612 Request for Addl Info Re NUREG-0737,Item II.D.1 Re Performance Testing of Relief & Safety Valves.Conclusions Originally Presented in PGE-1039 Have Not Changed Project stage: Request ML20137N7701986-01-13013 January 1986 Rev 2 to Administrative Order AO-4-7, Procedure Generation Package for Emergency Operating Procedures Project stage: Other ML20137N7621986-01-31031 January 1986 Forwards item-by-item Response to Comments in Procedures Generation Package Draft SER & Rev 2 to Administrative Order AO-4-7, Procedure Generation Package for Emergency Operating Procedures Project stage: Draft Other ML20141P0581986-03-10010 March 1986 Forwards Amend 112 to License NPF-1 & Safety Evaluation. Amend Revises Tech Specs to Add Operability & Surveillance Requirements for Core Exit Thermocouples & Reactor Vessel Level Instrumentation Sys Project stage: Approval ML20154N8751986-03-12012 March 1986 Summary of Operating Reactor Events 860310 Meeting 86-07 W/Ornl Re Events Occurring Since 860303 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl Project stage: Request ML20155E7911986-04-0707 April 1986 Corrected Amends 112 & 114 to License NPF-1,re Thermal Power,Surveillance Requirements & Control & Dilution to Moderate Temp Coefficient Project stage: Other ML20155E7861986-04-0707 April 1986 Forwards Corrected Amends 112 & 114 to License NPF-1 Revising Pagination & Resolving Administrative Errors Project stage: Other ML20203H6851986-07-31031 July 1986 Informs That Util Will Ref WCAP-11145 in Order to Satisfy Requirements of TMI Action Item II.K.3.31 in Generic Fashion,In Accordance W/Generic Ltr 83-35.Plant-specific Analysis Unnecessary Project stage: Other ML20238A5951987-05-0606 May 1987 Intervenor Exhibit I-SC-59,consisting of Undated Summary of Objectives Project stage: Other ML20237F7161987-08-0707 August 1987 Advises That Util Will Be Unable to Meet Original Response Time for NRC 870617 Request for Addl Info Re Testing of Relief & Safety Valves.Response Will Be Issued by 871030 Project stage: Request ML20236L3901987-10-30030 October 1987 Provides Addl Info Re Performance Testing of Relief & Safety Valves,Per NUREG-0737,Item II.D.1 & 870617 Request. Evaluation of 83 Supports for Original Design Loads Performed.Mods Identified & Installed Project stage: Other ML20055E7851990-07-0909 July 1990 Forwards Safety Evaluation Re Procedures Generation Program for Plant,Per Util 831110 & s.Ltrs Should Be Reviewed to Address Programmatic Improvements Outlined in Section 2 of Rept Project stage: Approval 1985-08-07
[Table View] |
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20204B7691999-03-18018 March 1999 Proposed Tech Specs 5.6 Re High Radiation Area.Certificate of Svc,Encl ML20207J0831999-02-11011 February 1999 Proposed Tech Specs for Trojan Isfsi,Stating Length of Time Air Pads Can Be Installed & Inflated ML20151X8671998-09-10010 September 1998 Rev 2 to Proposed TS Bases,Changing Name of Cooling Sys to Modular Spent Fuel Pool Cooling & Cleanup Sys & Updates Spent Fuel Pool Heat Up Info to 3 1/2 Years After Plant Shutdown ML20238E8291998-08-27027 August 1998 Proposed Tech Specs,Deleting Number of License Conditions & TS Requirements as Prerequisite to Implementing Requested Amend to Transfer Nuclear Sf from Existing 10CFR50 Licensed Area to Proposed 10CFR72,ISFSI Area ML20199J5801998-01-29029 January 1998 Proposed Tech Specs Pages,Deleting Security Plan Requirements of 10CFR50.54(p) & Part 73 for Trojan Plant After Spent Nuclear Fuel Is Moved to Proposed ISFSI Area ML20134C9901997-01-28028 January 1997 Proposed Tech Specs 5.0 Re Administrative Controls ML20134A9571997-01-16016 January 1997 Proposed Tech Specs LCO 3.1.4 Re Spent Fuel Pool Load Restrictions ML20134B5881997-01-16016 January 1997 Proposed Tech Specs Deleting Paragraph 2.(C)(7) to Allow Loading & Handling of Spent Fuel Casks & Insertion of New License Condition Authorizing Loading of Spent Fuel & Other Matls in Fuel Building ML20134B8631997-01-16016 January 1997 Proposed Tech Specs Re Delete Paragraph 2.(C)(7) to Allow pre-operational Testing & Load Handling of Spent Fuel Transfer & Storage Casks in Trojan Fuel Building ML20135B5071996-11-27027 November 1996 Proposed Tech Specs Reflecting New Fuel Debris Storage Container Design & Storage of non-fuel Bearing Components & Fuel Rod Storage Container in Trojan ISFSI ML20129E7341996-10-23023 October 1996 Proposed Tech Specs Re Spent Fuel Pool Debris Processing ML20059A5601993-10-21021 October 1993 Proposed Tech Specs Modifying Security License Conditions for Clarity ML20127P2121993-01-27027 January 1993 Proposed TS 6.2.2.f Re Composition of Fire Brigade & TS Table 6.2-1 Re Min Shift Crew Composition for Shift Manager & Noncertified Operator ML20127M6391992-11-16016 November 1992 Proposed Tech Specs for Deferral of Unscheduled Steam Generator ISI ML20141M1901992-03-27027 March 1992 Proposed Tech Specs Re Surveillance Requirements for Lco. Response to Request for Addl Info on Subj Encl ML20059L6701990-09-21021 September 1990 Proposed Tech Spec Table 3.6-1, Containment Isolation Valves ML20247C8941989-07-19019 July 1989 Proposed Tech Spec Table 3.6-1, Containment Isolation Valves ML20245C8091989-06-12012 June 1989 Proposed Tech Specs,Changing Orifice Size of Steam Line Safety Valves Shown in Tech Spec Table 4.7-1, Steam Line Safety Valves Per Loop ML20235L9441989-02-10010 February 1989 Proposed Tech Specs,Allowing Mods to Control Auxiliary Fuel Bldg Complex Resulting in Increase in Lateral Shear Forces on Any Story ML20235Q9191989-02-10010 February 1989 Proposed Tech Specs Re Limiting Conditions for Operation & Surveillance Requirements for Containment Integrity for Equipment Hatches ML20154D1781988-09-0909 September 1988 Proposed Tech Specs Revising Pressurizer LPSI Setpoint ML20151T5951988-08-12012 August 1988 Proposed Tech Specs,Revising Surveillance Requirements for ECCS Check Valves ML20151A0381988-07-0808 July 1988 Proposed Tech Specs Re Radioactive Gaseous Effluents & Radioactive Liquid Waste Sampling & Analysis Program ML20151U7171988-04-14014 April 1988 Revised Proposed Tech Specs Re Plant Sys,As Part of Rev 1 to License Change Application 142 ML20148K5971988-03-23023 March 1988 Proposed Revised Tech Specs Re RCS ML20148C2101988-03-18018 March 1988 Proposed Tech Specs,Reflecting Revised Offsite & Facility Organization Charts ML20196J9031988-03-0101 March 1988 Proposed Tech Specs Modifying OL NPF-1,removing 3.5% U-235 Limit on Reactor Fuel Assemblies & Increase Enrichment Limit for New Fuel Storage Racks to 4.5%.Certificate of Svc Encl ML20147E7371988-03-0101 March 1988 Proposed Tech Specs Re Containment Isolation Valves ML20149K1901988-02-17017 February 1988 Proposed Tech Specs,Adding New Instruments for Monitoring Steam Generator Blowdown Sys Liquid Effluent Radioactivity ML20149L6981988-02-15015 February 1988 Proposed Tech Specs Re Offsite & Facility Organization Charts.Util Certificate of Svc Encl ML20149H1121988-02-0404 February 1988 Proposed Tech Specs Revising Operability & Surveillance Requirements for Component Cooling Water Sys ML20147D4561988-01-15015 January 1988 Proposed Tech Specs,Revising Offsite & Facility Organization Charts ML20195H8971987-12-24024 December 1987 Proposed Tech Specs Deleting Sections Re Fire Protection ML20237D6971987-12-18018 December 1987 Proposed Tech Specs,Requiring Measurement of Initial Discriminator Bias Curve for Each Detector & Subsequent Discrimination Bias Curves Obtained,Evaluated & Compared to Initial Curves ML20237D6551987-12-16016 December 1987 Proposed Tech Specs Deleting Provision for Continued Plant Operation in Section 3/4.4.6.2 & Requiring Prompt Unit Placement in Cold Shutdown After Pressure Boundary Leakage Occurrence ML20236W7611987-11-20020 November 1987 Proposed Tech Specs Including Effects of Nuclear Fuel Design Changes ML20236Q2271987-11-16016 November 1987 Proposed Tech Specs,Resolving Control Room Habitability Issues ML20236P4391987-11-13013 November 1987 Proposed Tech Specs,Extending Surveillance Time Period for Verifying Control Rod Insertability During Control Rod Worth & Shutdown Margin Tests to 7 Days.Certificate of Svc Encl ML20236N3861987-11-0909 November 1987 Proposed Tech Spec,Revising Tech Spec 3.9.9 to Resolve Inconsistencies within Tech Specs.W/Certificate of Svc ML20236N5881987-08-0606 August 1987 Proposed Tech Spec Section, Bases Correcting Section for Agreement W/Definition of Pressure Boundary Leakage ML20235W5571987-07-14014 July 1987 Proposed Tech Specs Re Solid Radwaste Sys ML20215K8381987-06-22022 June 1987 Proposed Tech Spec Table 3.3-1,revising Operability Requirements for Reactor Trip Breakers & 4.3-1,revising Surveillance Requirements for Manual Reactor Trip,Reactor Trip Breakers & Bypass Breakers ML20210B6241987-04-29029 April 1987 Proposed Tech Specs Revising Typos & Clarifying Appropriate Process to Be Used for Review & Approval of Temporary Changes to Procedures.Certificate of Svc Encl ML20209D0251987-04-20020 April 1987 Proposed Tech Specs Re RCS Surveillance Requirements ML20206D9261987-04-0303 April 1987 Revised Tech Spec Pages 3/4 8-6 & 3/4 8-7 Re Onsite Power Distribution Sys,Per License Change Application 128 ML20206A6221987-04-0303 April 1987 Revised Tech Spec Page 7,clarifying License Change Application 124 Re power-operated Valves ML20245A2631987-02-26026 February 1987 Proposed Tech Specs,Consisting of Revised Pages for License Change Application 124 & License Change Application 135, Adding Steamline Isolation Valves & Valve CV-8825 Back Onto Table 3.6-1 & Excluding Containment Airlocks from Criteria ML20211P0031987-02-20020 February 1987 Proposed Tech Specs Re Steam Generator Tube Plugging Criteria in Tube Sheet Region ML20211H4021987-02-11011 February 1987 Proposed Tech Specs Increasing Setpoint Tolerance for Pressurizer & Main Steam Safety Valves from 1% to 2% ML20207Q5371987-01-20020 January 1987 Proposed Tech Specs,Revising Surveillance Requirements for Safety Injection Sys Accumulator Isolation Valves 1999-03-18
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20210M7291999-08-0505 August 1999 Replacement Pages to PGE-1078, Trojan Nuclear Plant License Termination Plan. with D&D Modeling Runs for Determination of Screening Dcgls & Survey Area Maps Indicating Preliminary Survey Units ML20207D3951999-06-0101 June 1999 Rev 1 to Trojan Nuclear Plant Reactor Vessel & Internals Removal Project Transportation Safety Plan ML20204B7691999-03-18018 March 1999 Proposed Tech Specs 5.6 Re High Radiation Area.Certificate of Svc,Encl ML20207J3911999-03-10010 March 1999 Trojan Nuclear Plant License Termination Plan ML20207J0831999-02-11011 February 1999 Proposed Tech Specs for Trojan Isfsi,Stating Length of Time Air Pads Can Be Installed & Inflated ML20153D3081998-09-21021 September 1998 Rev 0 to PGE-1077, Tnp Reactor Vessel & Internals Removal Project Transportation Safety Plan ML20151X8671998-09-10010 September 1998 Rev 2 to Proposed TS Bases,Changing Name of Cooling Sys to Modular Spent Fuel Pool Cooling & Cleanup Sys & Updates Spent Fuel Pool Heat Up Info to 3 1/2 Years After Plant Shutdown ML20238E8291998-08-27027 August 1998 Proposed Tech Specs,Deleting Number of License Conditions & TS Requirements as Prerequisite to Implementing Requested Amend to Transfer Nuclear Sf from Existing 10CFR50 Licensed Area to Proposed 10CFR72,ISFSI Area ML20199J5801998-01-29029 January 1998 Proposed Tech Specs Pages,Deleting Security Plan Requirements of 10CFR50.54(p) & Part 73 for Trojan Plant After Spent Nuclear Fuel Is Moved to Proposed ISFSI Area ML20196J5131997-07-29029 July 1997 Rev 0 to Trojan Second Integrated Test Rept,Filter Media Processing Sys Trojan Nuclear Plant Spent Fuel Pool Debris Project ML20196J5241997-07-29029 July 1997 Rev 2 to In-Canal Equipment,Filter Media Processing Sys, Trojan Nuclear Plant Spent Fuel Pool Debris Project ML20137T9361997-04-0808 April 1997 Rev 1 to Trojan Proof of Principle Test Summary ML20137G1731997-03-20020 March 1997 Rev 6 to Trojan Plant Procedure,Tpp 20-2, Radiation Protection Program ML20137K5151997-03-0404 March 1997 Rev 0 to Trojan Proof of Principle Test Summary ML20138L1901997-01-30030 January 1997 Reactor Vessel & Internals Removal Plan ML20134C9901997-01-28028 January 1997 Proposed Tech Specs 5.0 Re Administrative Controls ML20134B8631997-01-16016 January 1997 Proposed Tech Specs Re Delete Paragraph 2.(C)(7) to Allow pre-operational Testing & Load Handling of Spent Fuel Transfer & Storage Casks in Trojan Fuel Building ML20134B5881997-01-16016 January 1997 Proposed Tech Specs Deleting Paragraph 2.(C)(7) to Allow Loading & Handling of Spent Fuel Casks & Insertion of New License Condition Authorizing Loading of Spent Fuel & Other Matls in Fuel Building ML20134A9571997-01-16016 January 1997 Proposed Tech Specs LCO 3.1.4 Re Spent Fuel Pool Load Restrictions ML20135B5071996-11-27027 November 1996 Proposed Tech Specs Reflecting New Fuel Debris Storage Container Design & Storage of non-fuel Bearing Components & Fuel Rod Storage Container in Trojan ISFSI ML20129E7341996-10-23023 October 1996 Proposed Tech Specs Re Spent Fuel Pool Debris Processing ML20059L1721993-11-30030 November 1993 Final Update to PGE-1043,Amend 3, Accident Monitoring Instrumentation Review, Identifying Rept as Historical by Placing Explanation in Preface to Be Inserted at Front of Document ML20059A5601993-10-21021 October 1993 Proposed Tech Specs Modifying Security License Conditions for Clarity ML20057D9131993-09-30030 September 1993 Amend 14 to PGE-1012, Trojan Nuclear Plant Fire Protection Plan. W/Four Oversize Drawings ML20057F1631993-09-30030 September 1993 Updated Trojan Nuclear Div Manual ML20056F9971993-08-26026 August 1993 Rev 9 to Odcm ML20127P2121993-01-27027 January 1993 Proposed TS 6.2.2.f Re Composition of Fire Brigade & TS Table 6.2-1 Re Min Shift Crew Composition for Shift Manager & Noncertified Operator ML20126B7231992-12-0303 December 1992 Rev 13 to Chemistry Manual Procedure CMP 1, Primary-to-Secondary Leak Rate ML20127M6391992-11-16016 November 1992 Proposed Tech Specs for Deferral of Unscheduled Steam Generator ISI ML20126B7601992-09-25025 September 1992 Rev 18 to Emergency Instruction EI-3, SG Tube Rupture ML20126B7451992-09-25025 September 1992 Rev 7 to Event-Specific Emergency Instruction ES-3.1, Post- SG Tube Rupture Cooldown Using Backfill ML20126B7491992-09-25025 September 1992 Rev 7 to Event-Specific Emergency Instruction ES-3.3, Post- SG Tube Rupture Cooldown Using Steam Dump ML20126B7411992-09-25025 September 1992 Rev 8 to Event-Specific Emergency Instruction ES-3.2, Post- Steam Generator Tube Rupture Cooldown Using SG Blowdown ML20126B7331992-09-25025 September 1992 Rev 7 to Emergency Contingency Action Procedure ECA-3.3, SG Tube Rupture W/O Pressurizer Pressure Control ML20126B7061992-09-25025 September 1992 Rev 7 to Emergency Contingency Action Procedure ECA-3.2, SG Tube Rupture W/Loss of Reactor Coolant - Saturated Recovery Desired ML20126B7181992-09-23023 September 1992 Rev 7 to Emergency Contingency Action Procedure ECA-3.1, SG Tube Rupture W/Loss of Reactor Coolant - Subcooled Recovery Desired ML20126B7141992-08-20020 August 1992 Rev 19 to Off-Normal Instruction ONI-12, High Activity Radiation Monitoring ML20210D5281992-06-0808 June 1992 Errata to Amend 6 to PGE-1025, Environ Qualification Program Manual ML20141M1901992-03-27027 March 1992 Proposed Tech Specs Re Surveillance Requirements for Lco. Response to Request for Addl Info on Subj Encl ML20126B7201992-01-24024 January 1992 Rev 2 to Off-Normal Instruction ONI-3-12, SG Tube Leak ML20062F7391990-11-15015 November 1990 Amend 4 to PGE-1049, Trojan Nuclear Plant Inservice Insp Program for Second 10-Yr Interval,Jan 1987 - Dec 1996 ML20059L6701990-09-21021 September 1990 Proposed Tech Spec Table 3.6-1, Containment Isolation Valves ML20247C8941989-07-19019 July 1989 Proposed Tech Spec Table 3.6-1, Containment Isolation Valves ML20245C8091989-06-12012 June 1989 Proposed Tech Specs,Changing Orifice Size of Steam Line Safety Valves Shown in Tech Spec Table 4.7-1, Steam Line Safety Valves Per Loop ML20247E5331989-03-29029 March 1989 Rev 0 to Procedure QTS-VT-100, Visual Exam Procedure ML20248D3271989-03-27027 March 1989 Rev 0 to QAP-VT-108, Visual Exam ML20247E5491989-03-0202 March 1989 Rev 0 to Procedure TNP-QAP-VT108, Visual Exam ML20235Q9191989-02-10010 February 1989 Proposed Tech Specs Re Limiting Conditions for Operation & Surveillance Requirements for Containment Integrity for Equipment Hatches ML20235L9441989-02-10010 February 1989 Proposed Tech Specs,Allowing Mods to Control Auxiliary Fuel Bldg Complex Resulting in Increase in Lateral Shear Forces on Any Story ML20154D1781988-09-0909 September 1988 Proposed Tech Specs Revising Pressurizer LPSI Setpoint 1999-08-05
[Table view] |
Text
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
,e ' .
LCA 125 j -
Attachment 1
, Page 1 of 2 TABLE 3.3-11 ACCIDENT MONITORING INSTRUMENTATION TOTAL NO. MINIMUM NUMBER INSTRUMENT OF CHANNELS OF CHANNELS
- 1. Reactor Coolant System Subcooling 2 1 Margin Monitor
- 2. PORV Position Indicator
- 3. PORV Block Valve Position 1/ valve 1/ valve Indicator **
- 4. Safety Valve Position Indicator 1/ valve 1/ valve (Acoustical Flow)
- 5. Auxiliary Feedwater Flow Rate 4 per pump 2 per pump
- 6. Pressurizer Water Level 3 2
- 7. Containment Atmospheric Pressure 2- 1
(-10 to 190 psig)
- 8. Containment Water Level (Wide 2 1 Range)
- 9. Containment Water Level (Narrow 1/ sump 1/ sump Range)
- 10. Core Exit Thermocouples 4/ core 2/ core quadrant # quadrant #
- 11. Reactor Vessel Level Instrumenta- 2 1 tion System ##
- Not applicable if the associated block valve is in the closed position.
- Not applicable if the block valve is verified in the closed position and power removed.
- The core exit thermocouples required to be OPERABLE shall be those which are displayed on the Subcooling Margin Monitors.
- Effective upon PGE's declaration of system operability and NRC approval to operate the system.
TROJAN-UNIT 1 3/4 3-52 Amendment No. 58, 93, 105 l
8508120445 850807 PDR ADOCK 05000344 P PDR I
/' *' LCA 125 Attachment 1
, Page 2 of 2 C .
4 TABLE 4.3-7 ACCIDENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL CHANNEL CHANNEL FUNCTIONAL INSTRUMENT CHECK CALIBRATION TEST
- 1. Reactor Coolant System M R Subcooling Margin Monitor ,
- 2. PORV Position Indicator M R
- 3. PORY Block Valve Position M R Indicator
- 4. Safety Valve Position M R Indicator ( Acoustical Flow)
- 5. Auxiliary Feedwater Flow Rate M* R
- 6. Pressurizer Water Level M R
- 7. Containment Atmospheric M R Pressure (-10 to 190 psig)
- 8. Containment Water Level (Wide M R Range)
- 9. Containment Water Level M R (Narrow Range)
- 10. Core Exit Thermocouples M R**
- 11. Reactor Vessel Level Instru- M R mentation System #
- Not applicable in Modes 1 and 2.
- Calibration shall consist of calibrating the thermocouple indicators.
- Effective upon PGE's declaration of system operability and NRC approval to operate the system.
TROJAN-UNIT 1 3/4 3-54 Amendment No. 58, 93,105
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )
)
PORTLAND GENERAL ELECTRIC COMPANY, ) Docket 50-344 THE CITY OF EUGENE, OREGON, AND ) Operating License NPF-1 PACIFIC POWER & LIGHT COMPANY )
)
(TROJAN NUCLEAR PLANT) )
CERTIFICATE OF SERVICE I hereby certify that copies of License Change Application 125 to the Operating License for Trojan Nuclear Plant, dated August 7, 1985, have been served on the following by hand delivery or by deposit in the United States mail, first class, this 7th day of August 1985:
Mr. Lynn Frank, Director State of Oregon Department of Energy Labor & Industries Bldg, Rm 102 Salem OR 97310 Mr. Robert L. King Chairman of County Commissioners Columbia County Courthouse St. Helens OR 97051 N
G. A pimmerman, Manager Nuc 9r Regulation Branch Nucl t Safety & Regulation Subscribed and sworn to before me this 7th day of August 1985.
Notary Public of 0;eg6n 9MyCommission r M '
/ [