Forwards Proposed Ts,Update to ISFSI SAR & Revised Calculation,Per Application for Trojan ISFSI License
ML20207J070
Person / Time
Site: Trojan  File:Portland General Electric icon.png
Issue date: 02/11/1999
From: Quennoz S
PORTLAND GENERAL ELECTRIC CO.
To: Kobetz T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20207J073 List:
References
VPN-021-99, VPN-21-99, NUDOCS 9903160184
Download: ML20207J070 (5)


Text

I PGE - -a Trojan Nuclear Plant iu l 71760 Columbia RiverHuy

! Rainier OR 97048 (52553723 February 11,1999 VPN-021-99 Trojan ISFSI Docket 72-017 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attention: T. J. Kobetz, Project Manager NMSS, SFPO

Dear Sir:

Submittal of Additional Information Portland General Electric (PGE) letter VPN-015 99, dated January 26,1999, committed to provide l additional information supporting the application for the Trojan ISFSI license. These items of information are listed below. Each of the items was to be submitted by February 12,1999, with the exception ofitem 2, which was to be submitted by March 4,1999. As indicated, items 1 and 6 were

)

i submitted earlier and item 2 will be submitted by the original commitment date. This letter provides items 3,4, and 5.

1. An update to the ISFSI Emergency Plan, PGE-1075. Submitted via VPN-01E-99 dated 2/4/99.
2. Results of the load test of the PWR Basket structural lid Due 3/4/99. ,

hoist rings (testing completed by 2/25/99). '

3. Proposed Technical Specification (LCO, SR, and Bases) for the length of time the Air Pads can be installed and Enclosure 2 to this letter. fl

/

inflated. 5'

4. An update to the ISFSI SAR and a revised calculation to Enclosures 1 and 3 to this I correct a minor discrepancy in the Concrete Cask tipover letter.  !

analysis.

12000G 9903160104 990211 PDR ADOCK 05000344 .i Y PDR 3 Connecting People, Power and Possibilities 6 m _

2 VPN-021-99 February 11,"1999 Pane 2 of 2 r

5. An update to the ISFSI SAR to clarify that the Overpack Enclosure I to this letter.

is to be used for Interim Storage until an analysis conforming to the SRP criteria is performed, submitted, and approved.

6. - A request for an exemption from 10 CFR 72.70 that Submitted via VPN-016-99 requires the final SAR submittal at least 90 days prior to dated 2/9/99.

fuelloading.

Enclosure I contains the updated SAR pages that provide the information indicated above and other miscellaneous changes. A summary of the changes to the SAR is included as the first two pages of Enclosure 1.

Enclosure 2 contains the updated Technical Specification pages that provids the above information and 4 - other miscellaneous changes as discussed in recent telephone conversations. A summary of the changes to the Technical Specifications is included as the first page of Enclosure 2.

Enclosure 3 contains revised calculation PGE01-10.02.03-06, "TranStor Concrete Cask Tomado, Flood, Earthquake, and Explosion Analysis," which corrects a minor discrepancy in the Concrete Cask tipover analysis in suppon of the related changes to the SAR in Enclosure 1.

If you have any questions regarding this information, please contact Lanny Dusek of my staff at (503) 556-7409.

Sincerely, 10 LJ.&~- &

en M. Quennoz Vice President Nuclear and Thermal Operations Enclosures c: .

L. H. Thonus, NRC, NRR

. R. A. Scarano, NRC Region IV

' David Stewart-Smith,00E b

.' d

m v

t -

k r

.TO: Distribution- LGD-022-99

' FROM: Lt G. Duse

~

DATE:'  ; February Il,1999 -

SUBJECT:

Transmittal of February 1999 Undata to the Troian Nuclear Plant "Indenendent Snent Fuel Stornae In=tallatinn Safety Analysis Renort."

~ ~

~

PGE-1069. and "lSFSI Technical Snecificatinns." PGE-1071 Enclosed are changes as of February 11,1999, to your copy of the above mentioned documents. :i l

Please acknowledge receipt of these changes by completing the lower portion of this transmittal and returning it to the location given below, l 4

LGD/ pas - -

Enclosure '

2/11/99 i

l. ACKNOWI FDGMENT I "Indenendent Soer t Fuel Stornoe Inntallation Safety Analysis Renort." l' l

PG5-1069. and/or "lSFSI Technical Snecifications." PGE 1071~

- I hereby acknowledge receipt of Controlled Copy Number (s) of the above subject

- documents.

' Signature - Date Return to: Pat Schaffran

  • Trojan Nuclear Plant

.71760 Columbia River Hwy.

Rainier, OR 97048 ':

L'-

j

g STATE OF OREGON, )

)

.)

COUNTY OF COLUMBIA ~)

, D. L. Nordstrom, being duly sworn, subscribe to and say that I am the General Manager, Plant upport and Technical Functions, for Portland General Electric Company, the licensee herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the-best of my knowledge, information, and belief the statements made in it are true.

Date - 6*6% a

// ,1999 1

(D.Dordstrom >W General Manager, Plant Support and  ;

Technical Functions Portland General Electric Company On this day personally appeared before me, D. L. Nordstrom; to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act.  !

GIVEN under my hand and seal this dayf / 4113 1 o ,1999, p ,

gygg SAdD NotTarybiic in the State OfOr ,

@Ib COMM:SSON E4' IRES JtLY 27199 NouRY PUBUC4REGON l

COMMISS10N NO.045765 -

I Residing at/ _ _ _

My commission expires 7 .31 99 l

i I

i

k. ,

F UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of . .)  ;

) l PORTLAND GENERAL ELFOTRIC COMPANY ) Docket 72-017

- THE CITY OF EUGENE, orb.GON, AND )

PACIFIC POWER & LIGHT COMPANY ) I (TROJAN NUCLEAR PLANT) )

CERTIFICATE OF SERVICE i

l I hereby certify that copies of the Trojan Nuclear Plant, Independent Spent Fuel Storage l Installation Safety Analysis Report and Technical Specifications, dated February 11,1999, have been served on the following by hand delivery or by deposit in the United States Mail, first class, this 11th day of February 1999:

Director, Oregon Office of Energy State of Oregon 625 Marion Street NE, Suite 1 Salem, Oregon 97301-3742 Chairman of County Commissioners Columbia County Courthouse St. Helens, Oregon 97051

/

L. . usek Manager, Nuclear Regulatory Affairs l On this' day personally appeared before me L. G. Dusek, to me known to be the individual who I l executed the foregoing instrument, and acknowledged that he signed the same as his free act.

! l

--GIVEN under my hand and seal this Ilth day of February 199 .

1 N i 7

Ah & '

, OMCRLSEAL Notary Public in and fo ate of Oregon . <

PATSCHAFFRAN i NOTARY PUBUC4REGON

'* N NY$11999 Residing at 38 /N My commission expires 7'd 7- 99 i

i c j