r
e
/g "%,'o'.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
e
'
v
g
ll
l
REGloN IV
[
8
611 RYAN PLAZA DRIVE. sulTE 400
'
ARLINGTON TEXAS 76011-8064
.,,,,
W 20, 1999
Stephen M. Quennoz. Trojan Site
Executive and Plant General Manager
Portland General Electric Company
Trojan Nuclear Plant
71760 Columbia River Highway
Rainier, Oregon 97048
NRC INSPEC' ION REPORT 50-344/99-03; 72-17/99-03
SUBJECT:
T
Dear Mr. Quennoz:
On March 25,1999, the NRC completed an inspection at the Trojan facility. The primary
purposes of the inspection were to perform reviews of your reactor pressure vessel lift in
preparation for shipment to Hanford, Washington, for disposal, and your readiness for
preoperational testing of the independent Spent Fuel Storage Installation (ISFSI) and support
equipment. The enclosed report presents the scope and results of this inspection.
Overall, the NRC concluded that your preparations for transfer of fuel to your ISFSI are
,
progressing in a controlled manner, although a number of activities need to be completed prior
to actual fuel movement. For example, staffing and training had not been completed, a number
of implementing procedures still had not been formally approved, and a large number of items
were still listed on your open items lists (commitment tracking list, problem reports, and
corrective action reports). To help ensure the safe and orderly transfer of fuel, these
outstanding issues should be adequately resolved prior to fuel movement.
With respect to the reactor pressure vessellift, the NRC inspectors concluded that the lift was
being performed in a safe and orderly manner.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
,
'
enclosure will be placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
-
e
(
Dwig t D. Chamberlain, Director
Division of Nuclear Material Safety
Docket Nos. 50-344;72-17
9904270283 990420
'
ADOCK 05000344
G
POR
-
. .
.
]
v:- .
.E
.
-.
Portland General Electric Co.
-2-
i
Trojan Nuclear Plant
Enclosure:
NRC Inspection Report
50-344/99-03;72-17/99-03
cc w/ enclosure:
Lansing G. Dusek, Manager
Nuclear Regulatory Affairs
Portland General Electric Company
Trojan Nuclear Plant
71760 Columbia River Highway
Rainier, Oregon 97048
'
Chairman
i
Board of County Commissioners .
Columbia County
j
St. Helens, Oregon 97501
Mr. David Stewart-Smith
Oregon Office of Energy
625 Marion Street NE
Salem, Oregon 97310
Mr. Lloyd K. Marbet
j
19142 S.E. Bakers Ferry Road
'
Boring, Oregon 97009
Mr. Jerry Wilson
i
Do it Yourself Committee
570 N.E. 53rd
,
Hillsboro, Oregon 97124
l
Mr. Eugene Roselie
_
Northwest Environment Advocates
133 S.W. 2nd Avenue -
Portland, Oregon 97204
,
.
I
E
-
1
)
.
Portland General Electric Co.
-3-
Trojan Nuclear Plant
E Mail report to Document Control Desk (DOCDESK)
. bec w/ enclosure to DCD (IE01 and 1E08)
bec w/ enclosure distrib. by RIV:
EWMerschoff, RA
LHThonas, NRR/PDND (O 11 D19)
TJKobetz, NMSS/SFPO (O 6 G22)
DDChamberlain
LLHowell
DBSpitzberg -
MRShaffer
EECollins
,
RJEvans
JEWhittemore
DRS:E&MB
FCDB File
,
MIS System
RIV Files-4th floor file room (Part 50 Docket)
RIV Fik s-Sth floor file room (Part 72 Docket)
J
,
1
.
DOCUMENT NAME: Draft: S:\\dnms\\fedb\\rje\\TN9903rp.rje Final: R:\\_dnms\\TN9903rp.RJE
To receive copy of document, indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" =_No copy
RIV:DNMS:NMIB
DRS:E&MB
NRR/DRPM
C:FC&DB
0:DNMS)//F
l
RJEvans:wsw
JEWhittemore
LThonus Mt. Or DBSpitzbergM DDCharh6erlain
04/19/99 Cd'2'
04 @ /99' M/
04/Jc/99 vW (41 04/ts/99
04/ d/99
2
0
OFFICIAL RECORD COPY
l
[
. ..
>
l
Portland General Electric Co.
-3-
Trojan Nuclear Plant
E-Mail report to Document Control Desk (DOCDESK)
'
bec w/ enclosure to DCD (
and 1E08)
{
l
bec w/ enclosure distrib. by RIV:
EWMerschoff, RA
LHThonas, NRR/PDND (O 11 D19)
TJKobetz, NMSS/SFPO (O 6 G22)
DDChamberlain
LLHowell
DBSpitzberg
MRShaffer
EECollins
RJEvans
JEWhittemore
DRS:E&MB
FCDB File
MIS System
RIV Files 4th floor file room (Part 50 Docket)
RIV Files-Sth floor file room (Part 72 Docket)
.
/
,
I
DOCUMENT NAME: Draft: S:\\dnms\\fedb\\rje\\TN9903rp.rje Final: R:\\_.dnms\\TN9903rp.RJE
To receive copy of document, Indicate in box: *C" = Copy without enclosures "E" = Copy with enclosures "N* =_No copy
RIV:DNMS:NMIB
DRS:E&MB
NRR/DRPM
C:FC&DB
D:DNMSM
RJEvans:wsw
JEWhittem_ ore
LThonus Mi W DBSpitzbergM DDCharhidrlain
04/19/99 C62*
04Q0/99 %/
04/Jc/99 m t~t 04As/99
04/ d/99
2
'
V
OFFICIAL RECORD COPY