ML20205T547

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted
ML20205T547
Person / Time
Site: Trojan  File:Portland General Electric icon.png
Issue date: 04/20/1999
From: Chamberlain D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Quennoz S
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20205T550 List:
References
50-344-99-03, 50-344-99-3, 72-0017-99-03, 72-17-99-3, NUDOCS 9904270283
Download: ML20205T547 (4)


See also: IR 05000344/1999003

Text

r

e

UNITED STATES

e

/g "%,'o'. NUCLEAR REGULATORY COMMISSION

'  ; v  ;

g ll REGloN IV

'

l

[ 8 611 RYAN PLAZA DRIVE. sulTE 400

.,,,, ARLINGTON TEXAS 76011-8064

W 20, 1999

Stephen M. Quennoz. Trojan Site

Executive and Plant General Manager

Portland General Electric Company

Trojan Nuclear Plant

71760 Columbia River Highway

Rainier, Oregon 97048

SUBJECT: NRC INSPEC'TION REPORT 50-344/99-03; 72-17/99-03

Dear Mr. Quennoz:

On March 25,1999, the NRC completed an inspection at the Trojan facility. The primary

purposes of the inspection were to perform reviews of your reactor pressure vessel lift in

preparation for shipment to Hanford, Washington, for disposal, and your readiness for

preoperational testing of the independent Spent Fuel Storage Installation (ISFSI) and support

equipment. The enclosed report presents the scope and results of this inspection.

Overall, the NRC concluded that your preparations for transfer of fuel to your ISFSI are ,

progressing in a controlled manner, although a number of activities need to be completed prior

to actual fuel movement. For example, staffing and training had not been completed, a number

of implementing procedures still had not been formally approved, and a large number of items

were still listed on your open items lists (commitment tracking list, problem reports, and

corrective action reports). To help ensure the safe and orderly transfer of fuel, these

outstanding issues should be adequately resolved prior to fuel movement.

With respect to the reactor pressure vessellift, the NRC inspectors concluded that the lift was

being performed in a safe and orderly manner.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its ,

'

enclosure will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

-

Sincerely,

e

(

Dwig t D. Chamberlain, Director

Division of Nuclear Material Safety

Docket Nos. 50-344;72-17

License Nos. NPF-1; SNM-2509

9904270283 990420 '

PDR ADOCK 05000344

G POR

- _ . . _ .

v:- .

]

.E

.

-.

Portland General Electric Co. -2- i

Trojan Nuclear Plant

Enclosure:

NRC Inspection Report

50-344/99-03;72-17/99-03

cc w/ enclosure:

Lansing G. Dusek, Manager

Nuclear Regulatory Affairs

Portland General Electric Company

Trojan Nuclear Plant

71760 Columbia River Highway  ;

'

Rainier, Oregon 97048

l

Chairman i

Board of County Commissioners .

Columbia County j

St. Helens, Oregon 97501

Mr. David Stewart-Smith

Oregon Office of Energy

625 Marion Street NE

Salem, Oregon 97310

Mr. Lloyd K. Marbet j

19142 S.E. Bakers Ferry Road

'

Boring, Oregon 97009

Mr. Jerry Wilson i

Do it Yourself Committee

570 N.E. 53rd ,

Hillsboro, Oregon 97124  !

l

Mr. Eugene Roselie _

Northwest Environment Advocates

133 S.W. 2nd Avenue -

Portland, Oregon 97204

, .

I

E

-

1

I

!

)

.

Portland General Electric Co. -3-

Trojan Nuclear Plant

E Mail report to Document Control Desk (DOCDESK)

. bec w/ enclosure to DCD (IE01 and 1E08)

bec w/ enclosure distrib. by RIV:

EWMerschoff, RA

LHThonas, NRR/PDND (O 11 D19)

TJKobetz, NMSS/SFPO (O 6 G22)

DDChamberlain

LLHowell  !

DBSpitzberg -

MRShaffer

EECollins ,

RJEvans

JEWhittemore

DRS:E&MB

,

FCDB File

MIS System

RIV Files-4th floor file room (Part 50 Docket)

RIV Fik s-Sth floor file room (Part 72 Docket) J

,

1

.

DOCUMENT NAME: Draft: S:\dnms\fedb\rje\TN9903rp.rje Final: R:\_dnms\TN9903rp.RJE

To receive copy of document, indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" =_No copy

RIV:DNMS:NMIB DRS:E&MB NRR/DRPM C:FC&DB 0:DNMS)//F l

RJEvans:wsw JEWhittemore LThonus Mt. Or DBSpitzbergM DDCharh6erlain

04/19/99 Cd'2' 04 @ /99' M/ 04/Jc/99 vW (41 04/ts/99 04/2d/99

0 OFFICIAL RECORD COPY

l

[

. ..

>

l

Portland General Electric Co. -3-

Trojan Nuclear Plant

E-Mail report to Document Control Desk (DOCDESK)

'

bec w/ enclosure to DCD ( and 1E08) {

l

bec w/ enclosure distrib. by RIV: l

EWMerschoff, RA

LHThonas, NRR/PDND (O 11 D19)

TJKobetz, NMSS/SFPO (O 6 G22)

DDChamberlain

LLHowell

DBSpitzberg

MRShaffer

EECollins

RJEvans

JEWhittemore

DRS:E&MB

FCDB File

MIS System

RIV Files 4th floor file room (Part 50 Docket)

RIV Files-Sth floor file room (Part 72 Docket) .

/

!

,

I

DOCUMENT NAME: Draft: S:\dnms\fedb\rje\TN9903rp.rje Final: R:\_.dnms\TN9903rp.RJE

To receive copy of document, Indicate in box: *C" = Copy without enclosures "E" = Copy with enclosures "N* =_No copy  ;

RIV:DNMS:NMIB DRS:E&MB NRR/DRPM C:FC&DB D:DNMSM

RJEvans:wsw JEWhittem_ ore LThonus Mi W DBSpitzbergM DDCharhidrlain

'

04/19/99 C62* 04Q0/99 %/ 04/Jc/99 m t~t 04As/99 04/2d/99

V

OFFICIAL RECORD COPY

l

t