Forwards Estimates of Facility Operator Licensing, Requalification & Generic Fundamentals Exam Requirements for FY91-94,per Generic Ltr 90-07
ML20059J969
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 09/14/1990
From: Cross J
PORTLAND GENERAL ELECTRIC CO.
To: Perkins K
Office of Nuclear Reactor Regulation
References
GL-90-07, GL-90-7, NUDOCS 9009210087
Download: ML20059J969 (4)


Text

.-

i O'

?

J M

M l

Ptsreend General Electric Cortyminy James E. Cross Vice President, Nuclear September 14, 1990 i

Trojan Nuclear Plant l'

Docket 50-344 License NPF-1 i

Nr. Kenneth E. Perkins, Jr.

l, Chief Operator Licensing Branch OWFN-10D-18 U.S. Nuclear Regulatory Commission i

Washington DC 20555

Dear Mr. Perkins:

Response to Generic Letter 90-07:

l Operator Licensinit National Examination Schedule l

As requested by the subject generic letter, enclosed are estimates of Portland General Electric Company's operator licensing, requalification, and generic fundamentals examination requirements for Fiscal Years 1991 l

through 1994.

The information, which is provided in Enclosures 1, 2, and 3, is consistent with the fvna.i. pavyveed in Generic Letter 90-07.

Sincerely, I

l

- [ C-Enclosures c: / Document Control Desk U.S. Nuclear Regulatory Convaission

)

Washington DC

_J Mr. John B. Martin R*sional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. David Stewart-Smith

. State of Oregon Department of Energy i

Mr..R. C. Barr NRC Resident Inspector Trojan Nuclear Plant 002CG

= 121 SW Salmon St Portland, OR 97204 g'o7 9009210087 900914 503/464-8 5 7 f/

PDR ADOCK 05000344

_y PDC

l' Trojan Nucloar Plent Mr. Kannsth E. Perkins. Jr.

Dockst 50-3a4 Ssptenb3r 14.1990 1.icense NPP-1 1

..f PROPOSG OPFRATOR LICENSING EXAMINATION SCHEDULE FORMAT FACILITY Trojan Nuclear Plant NRC REGI(pl V

~

i FY 1991

.FY 1992.

FY 1993 FY 1994 l

(10/1/90 -

(10/1/91-(10/1/92-(10/1/93 -

9/30/91) 9/30/92)'

9/30/93) 9/30/94) 1.

Assigned Data (GL 89-03) 12/90 12/91 12/92 12/93

  1. RO o

o o

o

- #SRO Instant o

o o

o

  1. $RO Upgrada o

o o

o i

r

  1. SRG Limited 0

0 0

0 Z

Assigned l

Data l

(GL 89-03) 06/91 06/92

___06/93 06/9a l

. #RO' s

s 5

3 I

  1. $RC Instant i

1 0

o

  1. SRO Upgrade 4

3 3

3

  1. SRO Limited o

o o

o i

PTease indicata initial cold license examinations by placing an asterisk (*) by the data Please indicata examinations intended to extend an operator's licanse ta a. second or subsequent unit witir taso asterisks (**).

(For example, if. Unit 1 it it operation and Unit 2. ir approaching fusi load,. and three RQ candidatar with ner prwicur license are-to. be-examined on botfr Units L and 2. and five RO candidater licensed or Unit 1. are to be examined to extend their licenser to

, Unit 2, then indicata "RQ 3,5**.?)

l l

l 9

a

____m__._-__m-,__._mm m

____._.u_-,.,_.m_,.

.y,,,,_,,,, _.

.,,.,.m.m

,,o,.

.,m_,,y.

_..m..,_,

r-

.s 4,

Troj:n N:cloor Plcnt Mr. Kenneth E. Perkins. Jr.

j'.,

Dock;t 50-344 Septe:ber 14, 1990 l'

License NPF.

1-PROPOSE 3 REQUALIFICATION EXAMINATION SCHEDULE FORMAT FACILITY Trojan Nuclear Plant NRC REGION V

FY 1991 FY 1992 FY 1993 FY 1994 (10/1/90-(10/1/91-(10/1/92-(10/1/93-9/30/91) 9/30/92) 9/30/93) 9/30/94) 1.

Date 01/28-03/08/91 12/91 12/92 12/93 2.

Date 3.

Date 4

Date 5.

Date 1

1 1

i D

k 1

8 f

-Tr'ojen Nuc1ccr Plant Mr. Kannsth E. Porkins. Jr.

j

,' Dockot 50-344 S3ptosbst 14 1990

,Licenso NPP-1 Enclosuro 3 PROPOSED GENERIC FUNDAMENTAL EXAMINATION SCHEDULE FORP.AT FACILITY.

Trojan Nuclear Plant NRC REGION V

OCTOBER 1990 FEBRUARY 1991 JUNE 1991 Estimated Humber of Candidates 6

None None The Generic Fundamental Examination Schedule (GFES) is administered three times a year, on the Wednesday following the first Sunday in February, June, and October.

4 1