ML20059J969
| ML20059J969 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 09/14/1990 |
| From: | Cross J PORTLAND GENERAL ELECTRIC CO. |
| To: | Perkins K Office of Nuclear Reactor Regulation |
| References | |
| GL-90-07, GL-90-7, NUDOCS 9009210087 | |
| Download: ML20059J969 (4) | |
Text
.-
i O'
?
J M
M l
Ptsreend General Electric Cortyminy James E. Cross Vice President, Nuclear September 14, 1990 i
Trojan Nuclear Plant l'
Docket 50-344 License NPF-1 i
Nr. Kenneth E. Perkins, Jr.
l, Chief Operator Licensing Branch OWFN-10D-18 U.S. Nuclear Regulatory Commission i
Washington DC 20555
Dear Mr. Perkins:
Response to Generic Letter 90-07:
l Operator Licensinit National Examination Schedule l
As requested by the subject generic letter, enclosed are estimates of Portland General Electric Company's operator licensing, requalification, and generic fundamentals examination requirements for Fiscal Years 1991 l
through 1994.
The information, which is provided in Enclosures 1, 2, and 3, is consistent with the fvna.i. pavyveed in Generic Letter 90-07.
Sincerely, I
l
- [ C-Enclosures c: / Document Control Desk U.S. Nuclear Regulatory Convaission
)
_J Mr. John B. Martin R*sional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. David Stewart-Smith
. State of Oregon Department of Energy i
Mr..R. C. Barr NRC Resident Inspector Trojan Nuclear Plant 002CG
= 121 SW Salmon St Portland, OR 97204 g'o7 9009210087 900914 503/464-8 5 7 f/
PDR ADOCK 05000344
_y PDC
l' Trojan Nucloar Plent Mr. Kannsth E. Perkins. Jr.
Dockst 50-3a4 Ssptenb3r 14.1990 1.icense NPP-1 1
..f PROPOSG OPFRATOR LICENSING EXAMINATION SCHEDULE FORMAT FACILITY Trojan Nuclear Plant NRC REGI(pl V
~
i FY 1991
.FY 1992.
FY 1993 FY 1994 l
(10/1/90 -
(10/1/91-(10/1/92-(10/1/93 -
9/30/91) 9/30/92)'
9/30/93) 9/30/94) 1.
Assigned Data (GL 89-03) 12/90 12/91 12/92 12/93
- RO o
o o
o
- #SRO Instant o
o o
o
- $RO Upgrada o
o o
o i
r
- SRG Limited 0
0 0
0 Z
Assigned l
Data l
(GL 89-03) 06/91 06/92
___06/93 06/9a l
. #RO' s
s 5
3 I
- $RC Instant i
1 0
o
- SRO Upgrade 4
3 3
3
- SRO Limited o
o o
o i
PTease indicata initial cold license examinations by placing an asterisk (*) by the data Please indicata examinations intended to extend an operator's licanse ta a. second or subsequent unit witir taso asterisks (**).
(For example, if. Unit 1 it it operation and Unit 2. ir approaching fusi load,. and three RQ candidatar with ner prwicur license are-to. be-examined on botfr Units L and 2. and five RO candidater licensed or Unit 1. are to be examined to extend their licenser to
, Unit 2, then indicata "RQ 3,5**.?)
l l
l 9
a
____m__._-__m-,__._mm m
____._.u_-,.,_.m_,.
.y,,,,_,,,, _.
.,,.,.m.m
,,o,.
.,m_,,y.
_..m..,_,
r-
.s 4,
Troj:n N:cloor Plcnt Mr. Kenneth E. Perkins. Jr.
- j'.,
Dock;t 50-344 Septe:ber 14, 1990 l'
License NPF.
1-PROPOSE 3 REQUALIFICATION EXAMINATION SCHEDULE FORMAT FACILITY Trojan Nuclear Plant NRC REGION V
FY 1991 FY 1992 FY 1993 FY 1994 (10/1/90-(10/1/91-(10/1/92-(10/1/93-9/30/91) 9/30/92) 9/30/93) 9/30/94) 1.
Date 01/28-03/08/91 12/91 12/92 12/93 2.
Date 3.
Date 4
Date 5.
Date 1
1 1
i D
k 1
8 f
-Tr'ojen Nuc1ccr Plant Mr. Kannsth E. Porkins. Jr.
j
,' Dockot 50-344 S3ptosbst 14 1990
,Licenso NPP-1 Enclosuro 3 PROPOSED GENERIC FUNDAMENTAL EXAMINATION SCHEDULE FORP.AT FACILITY.
Trojan Nuclear Plant NRC REGION V
OCTOBER 1990 FEBRUARY 1991 JUNE 1991 Estimated Humber of Candidates 6
None None The Generic Fundamental Examination Schedule (GFES) is administered three times a year, on the Wednesday following the first Sunday in February, June, and October.
4 1