ML20202G429

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to PGE-1076, Trojan Reactor Vessel Package Sar. Approval,With Certain Conditions,For one-time Shipment of Trojan Reactor Vessel Package Granted by Commission Via Ltr
ML20202G429
Person / Time
Site: 07109271, Trojan  File:Portland General Electric icon.png
Issue date: 02/02/1999
From: Quennoz S
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20202G436 List:
References
VPN-012-99, VPN-12-99, NUDOCS 9902050175
Download: ML20202G429 (2)


Text

_

PGE ro ii. e a.a.,.i si.<*,ic co-e. v Trojan Nuclear Plant {

n760 Columbia Rner Huy Rainier ox 97o4s February 2,1999 csonzssna VPN-012-99 Trojan Nuclear Plant Dockets 50-344,71-9271 License NPF-1 Director Office of Nuclear Materials Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Trojan Nuclear Plant Reactor Vessel and Internals Removal Project Safety Analysis Reoort (RVAIR SARL PGE-1076 The enclosure to this letter provides Revision 0 to Portland General Electric Company's

" Trojan Nuclear Plant RVAIR SAR," PGE-1076. Approval, with certain conditions, for the one-time shipment of the Trojan reactor vessel package was granted by the Commission via letter dated October 29,1998 (W. F. Kane to S. M. Quennoz). Similarly, approval from the State of Oregon Energy Facility Siting Council was documented via letter dated November 11,1998 (A. Bless to J. D. Westvold). The body of Revision 0 to PGE-1076 is unchanged from the version submitted as a fimal application update to the NRC via letter dated September 23,1998 (VPN-054-98, S. M. Quennoz to Director, NMSS).

Ifyou have any questions concerning this matter, please contact Mr. L. G. Dusek, of my staff, at (503) 556-7409.

Sincerely,

[

c =g Stephen M. Quennoz Vice President, Nuclear and Thermal Operations Enclosure O JO) c: R. A. Scarano, NRC Region IV 0 400N.'

l D. Stewart-Smith, OOE l L. H. Thonus, NRC, NRR l 9902050175 990202 PDR 7 N l

W ADOCK 05000344/

PDR ?i  %' s Connecting People, Power and Possibilities ,

Trojan Nuclear Plant Reactor Vessel and Internals Removal Project Safety Analysis Report (RVAIR SAR), PGE-1076, Revision 0 The following list is provided as guidance for updating your controlled copy of PGE-1076, Revision 0, Books 1,2, and 3.

Remove Psee(s) Insert Pagc(s)

Book 1. Safety Analysis Renort Title Page Title Page Table of Contents,i through vii Table ofContents,i through xiii List of Tables, Pages 1 and 2 --

List ofFigures, Pages 1 and 2 --

List of Appendices ---

List ofEffective Pages, Pages I through 3 --

Pages 1-1 through 1-20 Pages 1-1 through 1-20 Tables 1-1 and 1-2 Tables 1-1 and 1-2 Pages 2-1 through 2-62 Pages 2-1 through 2-62 Tables 2-1 through 2-18 Tables 2-1 through 2-18 Figures 2-1 and 2-2 Figures 2-1 and 2-2 Pages 3-1 through 3-11 Pages 3-1 through 3-11 Tables 3-1 through 3-4 Tables 3-1 through 3-4 Pages 4-1 through 4-6 Pages 4-1 through 4-6 Pages 5-1 through 5-11 Pages 5-1 through 5-11 Tables 5-1 thrrough 5-12 Tables 5-1 through 5-12 Figures 5-1 and 5-2 Figures 5-1 and 5-2 Page 6-1 Page 6-1 Pages 7-1 through 7-8 Pages 7-1 through 7-8 Pages 8-1 through 8-11 Pages 8-1 through 8-11 Table 8-1 Table 8-1 Book 3. Environmental Renort Title Page Title Page Table of Contents, Page i Table of Contents, Page i Pages E-1 through E-21 Pages E-1 through E-21 i

--