Similar Documents at Byron |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P6171999-10-21021 October 1999 Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) ML20217M2871999-10-21021 October 1999 Refers to Rev 5 Submitted in May 1999 for Portions of Byron Nuclear Power Station Generating Stations Emergency Plan Site Annex.Informs That NRC Approval Not Required Based on Determination That Plan Effectiveness Not Decreased ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217F7891999-10-0808 October 1999 Forwards Insp Repts 50-454/99-12 & 50-455/99-12 on 990803- 0916.One Violation Occurred Being Treated as NCV ML20217B6351999-10-0505 October 1999 Forwards for Info,Final Accident Sequence Precursor Analysis of Operational Event at Byron Station,Unit 1,reported in LER 454/98-018 & NRC Responses to Util Specific Comments Provided in ML20212L1791999-10-0505 October 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Rvid & Is Releasing Rvid Version 2 ML20217B2991999-10-0101 October 1999 Forwards Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Water Chemisty Program Was Well Implemented,Resulted in Effective Control of Plant Water Chemistry ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20212J6751999-09-30030 September 1999 Forwards Replacement Pages Eight Through Eleven of Insp Repts 50-454/99-15 & 50-455/99-15.Several Inaccuracies with Docket Numbers & Tracking Numbers Occurred in Repts ML20217A5821999-09-29029 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20216F8051999-09-17017 September 1999 Forwards Insp Rept 50-454/99-14 & 50-455/99-14 on 990823-27. Security Program Was Effectively Implemented in Areas Inspected.No Violations Were Identified ML20211P1841999-09-0808 September 1999 Forwards Insp Repts 50-454/99-15 & 50-455/99-15 on 990824- 26.No Violations Noted.Objective of Insp to Determine Whether Byron Nuclear Generating Station Emergency Plan Adequate & If Emergency Plan Properly Implemented ML20211Q6821999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Byron Operator Licesne Applicants During Wks of 000619 & 26.Validation of Exam Will Occur at Station During Wk of 000529 ML20211N5151999-09-0303 September 1999 Ack Receipt of Re Safety Culture & Overtime Practices at Byron Nuclear Power Station.Copy of Recent Ltr from NRC to Commonwealth Edison Re Overtime Practices & Safety Culture Being Provided ML20211K1081999-09-0202 September 1999 Responds to Request for Addl Info to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Braidwood,Units 1 & 2 & Byron,Unit 2 ML20211M1371999-09-0202 September 1999 Discusses 990527 Meeting with Ceco & Byron Station Mgt Re Overtime Practices & Conduciveness of Work Environ to Raising Safety Concerns at Byron Station.Insp Rept Assigned for NRC Tracking Purposes.No Insp Rept Encl ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211G4021999-08-25025 August 1999 Forwards Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed 05000454/LER-1998-008, Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER1999-08-12012 August 1999 Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210K0771999-07-30030 July 1999 Submits 30-day Rept Re Discovery of ECCS Evaluation Model Error for Byron & Braidwood Stations,As Required by 10CFR50.46 ML20210J8951999-07-29029 July 1999 Submits Other Actions,As Described,To Be Taken for Valves to Resolve Potential Pressure Locking Concerns,In Light of Extended Period for Valve Bonnet Natural Depressurization,In Response to GL 95-07, Pressure Locking & Thermal.. ML20210E2151999-07-23023 July 1999 Forwards Byron Unit 1 B1R09 ISI Summary Rept Spring 1999 Outage,980309-990424, in Compliance with Requirements of Article IWA-6000, Records & Repts of Section XI of ASME & P&PV,1989 Edition ML20209H2991999-07-16016 July 1999 Withdraws 980529 LAR to Credit Automatic PORV Operation for Mitigation of Inadvertent Safety Injection at Power Accident.Response to NRC 990513 RAI Re LAR Encl ML20210A3151999-07-16016 July 1999 Forwards Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.Three Violations Being Treated as Noncited Violations ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20207H7501999-07-12012 July 1999 Forwards Revised Pressure Temp Limits Rept, for Byron Station,Units 1 & 2.Revised Pressurized Thermal Shock Evaluations,Surveillance Capsule Rept & Credibility Repts, Also Encl ML20209G1391999-07-0909 July 1999 Forwards Results of SG Tube Insps Performed During Byron Station,Unit 1,Cycle 9 Refueling Outage within 12 Months Following Completion of Insps ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20196K0161999-06-30030 June 1999 Discusses 990622 Meeting at Byron Nuclear Power Station in Byron,Il.Purpose of Visit Was to Meet with PRA Staff to Discuss Ceco Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA Staff ML20196G2161999-06-25025 June 1999 Forwards for NRC Region III Emergency Preparedness Inspector,Two Copies of Comed Emergency Preparedness Exercise Manual for 1999 Byron Station Annual Exercise. Exercise Is Scheduled for 990825.Without Encls ML20212H8241999-06-24024 June 1999 Informs That Effective 990531 NRC Project Mgt Responsibility for Byron & Braidwood Stations Was Transferred to Gf Dick ML20209D4861999-06-17017 June 1999 Informs That R Heinen,License OP-30953-1 & a Snow,License SOP-30212-3,no Longer Require License at Byron Station 05000454/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed1999-06-0808 June 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed ML20207G0601999-06-0707 June 1999 Provides Updated Info Re Number of Failures Associated with Initial Operator License Exam Administered from 980914-0918. NRC Will Review Progress Wrt Corrective Actions During Future Insps ML20207G0421999-06-0404 June 1999 Forwards Insp Repts 50-454/99-04 & 50-455/99-04 on 990330-0510.Violations Identified & Being Treated as non-cited Violations ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs ML20207E5451999-05-28028 May 1999 Forwards Insp Repts 50-454/99-07 & 50-455/99-07 on 990517-20.No Violations Noted.Fire Protection Program Was Effective ML20211M1611999-05-28028 May 1999 Discusses 990527 Meeting with Comed Re Safety Culture & Overtime Control at Byron Nuclear Plant from Videoconference Location at NRC Headquarters.Requests That Aggressive Actions Be Taken to Ensure That Comed Meets Expectations ML20207D5261999-05-26026 May 1999 Forwards Response to NRC 990318 RAI Concerning Alleged Chilling Effect at Byron Station.Attachment Contains Responses to NRC 12 Questions ML20207B6361999-05-25025 May 1999 Forwards SE Accepting Revised SG Tube Rupture (SGTR) Analysis for Bryon & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20211M1781999-05-25025 May 1999 Summarizes Concerns with Chilling Effect & Overtime Abuses at Commonwealth Edison,Byron Station.Request That Ltr Be Made Part of Permanent Record of 990527 Meeting ML20195C7911999-05-25025 May 1999 Forwards Revised COLR for Byron Unit 2,IAW 10CFR50.59.Rev Accounts for Planned Increase of Reactor Coolant Full Power Average Operating Temp from 581 F to 583 F 05000454/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed1999-05-21021 May 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed ML20206U3471999-05-20020 May 1999 Forwards Insp Rept 50-454/99-05 on 990401-22.No Violations Noted.Insp Reviewed Activities Associated with ISI Efforts Including Selective Exam of SG Maint & Exam Records, Calculations,Observation of Exam Performance & Interviews ML20207A2151999-05-19019 May 1999 Forwards Insp Repts 50-454/99-06 & 50-455/99-06 on 990419-23.No Violations Noted.Insp Consisted of Review of Liquid & Gaseous Effluent Program,Radiological Environmental Monitoring Program,Auditing Program & Outage Activities 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217P6171999-10-21021 October 1999 Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) 05000454/LER-1998-008, Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER1999-08-12012 August 1999 Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210K0771999-07-30030 July 1999 Submits 30-day Rept Re Discovery of ECCS Evaluation Model Error for Byron & Braidwood Stations,As Required by 10CFR50.46 ML20210J8951999-07-29029 July 1999 Submits Other Actions,As Described,To Be Taken for Valves to Resolve Potential Pressure Locking Concerns,In Light of Extended Period for Valve Bonnet Natural Depressurization,In Response to GL 95-07, Pressure Locking & Thermal.. ML20210E2151999-07-23023 July 1999 Forwards Byron Unit 1 B1R09 ISI Summary Rept Spring 1999 Outage,980309-990424, in Compliance with Requirements of Article IWA-6000, Records & Repts of Section XI of ASME & P&PV,1989 Edition ML20209H2991999-07-16016 July 1999 Withdraws 980529 LAR to Credit Automatic PORV Operation for Mitigation of Inadvertent Safety Injection at Power Accident.Response to NRC 990513 RAI Re LAR Encl ML20207H7501999-07-12012 July 1999 Forwards Revised Pressure Temp Limits Rept, for Byron Station,Units 1 & 2.Revised Pressurized Thermal Shock Evaluations,Surveillance Capsule Rept & Credibility Repts, Also Encl ML20209G1391999-07-0909 July 1999 Forwards Results of SG Tube Insps Performed During Byron Station,Unit 1,Cycle 9 Refueling Outage within 12 Months Following Completion of Insps ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20196G2161999-06-25025 June 1999 Forwards for NRC Region III Emergency Preparedness Inspector,Two Copies of Comed Emergency Preparedness Exercise Manual for 1999 Byron Station Annual Exercise. Exercise Is Scheduled for 990825.Without Encls ML20209D4861999-06-17017 June 1999 Informs That R Heinen,License OP-30953-1 & a Snow,License SOP-30212-3,no Longer Require License at Byron Station 05000454/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed1999-06-0808 June 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs ML20211M1611999-05-28028 May 1999 Discusses 990527 Meeting with Comed Re Safety Culture & Overtime Control at Byron Nuclear Plant from Videoconference Location at NRC Headquarters.Requests That Aggressive Actions Be Taken to Ensure That Comed Meets Expectations ML20207D5261999-05-26026 May 1999 Forwards Response to NRC 990318 RAI Concerning Alleged Chilling Effect at Byron Station.Attachment Contains Responses to NRC 12 Questions ML20211M1781999-05-25025 May 1999 Summarizes Concerns with Chilling Effect & Overtime Abuses at Commonwealth Edison,Byron Station.Request That Ltr Be Made Part of Permanent Record of 990527 Meeting ML20195C7911999-05-25025 May 1999 Forwards Revised COLR for Byron Unit 2,IAW 10CFR50.59.Rev Accounts for Planned Increase of Reactor Coolant Full Power Average Operating Temp from 581 F to 583 F 05000454/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed1999-05-21021 May 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed ML20195B2301999-05-19019 May 1999 Requests Approval of Proposed Changes to QA Topical Rept CE-1-A,rev 66a.Attachment a Describes Changes,Reason for Change & Basis for Concluding That Revised QAP Incorporating Proposed Changes Continues to Satisfy 10CFR50AppB ML20207E9831999-05-18018 May 1999 Forwards Copy of Commonwealth Edison Co EP Exercise Evaluation Objectives for 1999 Byron Station Annual EP Exercise,Which Will Be Conducted on 990825.Without Encl ML20206N8551999-05-11011 May 1999 Forwards 1998 Annual Radioactive Environ Operating Rept for Byron Station. Rept Includes Summary of Radiological Liquid & Gaseous Effluents & Solid Waste Released from Site ML20206U3351999-04-30030 April 1999 Forwards Evaluation of Matter Described in Re Byron Station.Concludes That Use of Overtime at Byron Station Was Controlled IAW Administrative Requirements & Mgt Expectations Established to Meet Overtime Requirement of TS ML20206F5381999-04-30030 April 1999 Forwards Magnetic Tape Containing Annual Dose Repts for 1998 for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR20.2206(c).Without Magnetic Tape ML20206C7901999-04-23023 April 1999 Provides Suppl Info Re Use of W Dynamic Rod Worth Measurement Technique,As Requested During 990413 Telcon.Rev Bars in right-hand Margin Identify Changes from Info Submitted by ML20206E7521999-04-22022 April 1999 Submits Rept on Number of Tubes Plugged or Repaired During Inservice Insp Activities Conducted at Plant During Cycle 9 Refueling Outage,Per TS 5.6.9 ML20206A7431999-04-22022 April 1999 Forwards Comments Generated Based on Review of NRC Ltr Re Preliminary Accident Sequence Precursor Analysis for Byron Station,Unit 1 ML20206B3941999-04-21021 April 1999 Forwards Annual & 30-Day Rept of ECCS Evaluation Model Changes & Errors, for Byron & Braidwood Stations.Updated Info Re PCT for Limiting Small Break & Large Break LOCA Analysis Evaluations & Detailed Description of Errors ML20206B2471999-04-20020 April 1999 Informs That SE Kuczynski Has Been Transferred to Position No Longer Requiring SRO License.Cancel License SOP-31030-1, Effective 990412 ML20205S9621999-04-20020 April 1999 Responds to 981203 RAI Telcon Re SG Tube Rupture Analysis for Byron Station,Unit 2 & Braidwood Station,Unit 2.Addl Info & Subsequent Resolution of Issues Discussed During 990211 Telcon Are Documented in Encl ML20206A8141999-04-20020 April 1999 Advises NRC of Review of Cycle 10 Reload Under Provisions of 10CFR50.59 & to Transmit COLR for Upcoming Cycle ML20205T3901999-04-13013 April 1999 Forwards Byron Station 1998 Occupational Radiation Exposure Rept, Which Is Tabulation of Station,Utility & Other Personnel Receiving Annual Deep Dose Equivalent of Less than 100 Mrem ML20196K6661999-03-31031 March 1999 Forwards Byron Nuclear Power Station 10CFR50.59 Summary Rept, Consisting of Descriptions & SE Summaries of Changes, Tests & Experiments.Rept Includes Changes Made to Features Fire Protection Program,Not Previously Presented to NRC ML20205K5841999-03-31031 March 1999 Submits Rept on Status of Decommissioning Funding for Reactors Owned by Comm Ed.Attachment 1 Contains Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML20205B4241999-03-23023 March 1999 Provides Results of drive-in Drill Conducted on 990208,as Well as Augmentation Phone Drills Conducted Since 981015,as Committed to in Util ML20207K0351999-03-0404 March 1999 Forwards Util Which Transmitted Corrected Pages to SG Replacement Outage Startup Rept.Subject Ltr Was Inadvertently Not Sent to NRC Dcd,As Required by 10CFR50.4 ML20205C6861999-03-0404 March 1999 Provides Notification That Byron Station Implemented ITS on 990205 & Braidwood Station Implemented ITS on 990219 ML20207D6831999-03-0101 March 1999 Forwards fitness-for-duty Program Performance Data for Each Comed Nuclear Power Station & Corporate Support Employees for Six Month Period Ending 981231,per 10CFR26.71(d) ML20207D4301999-02-26026 February 1999 Informs NRC That Supplemental Info for Byron & Braidwood Stations Will Be Delayed.All Mod Work Described in Ltr Is on Schedule,Per GL 96-06 ML20207B8971999-02-25025 February 1999 Expresses Concern That Low Staffing Levels & Excessive Staff Overtime May Present Serious Safety Hazard at Some Commercial Nuclear Plants in Us ML20203C7001999-02-0202 February 1999 Informs That Mhb Technical Associates No Longer Wishes to Receive Us Region III Docket Info Re Comed Nuclear Facilities.Please Remove Following Listing from Service List ML20202F5911999-01-29029 January 1999 Forwards Byron Unit 1 Cycle 9 COLR in ITS Format & W(Z) Function & Byron Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function. New COLR Format Has Addl Info Requirements ML20199E1611999-01-15015 January 1999 Forwards Response to 980902 RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. CE Endorses Industry Response to RAI as Submitted by NEI ML20199B7511999-01-0808 January 1999 Forwards Proprietary Versions of Epips,Including Rev 52 to Bzp 600-A1 & Rev 48 to Bzp 600-A4 & non-proprietary Version of Rev 52 to Bzp 600-A1 & Index.Proprietary Info Withheld 1999-09-30
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059K6741990-09-17017 September 1990 Suppls Responses to Violations Noted in Insp Repts 50-454/89-11,50-455/89-13,50-456/89-11 & 50-457/89-11. Corrective Actions:Procedures Changed & Valve Tagging Status Provided ML20059L6611990-09-10010 September 1990 Forwards Byron Station Units 1 & 2 Inservice Insp Program ML20064A3681990-08-24024 August 1990 Forwards Response to 900517 Request for Addl Info Re Design of Containment Hydrogen Monitoring Sys.Util Proposes Alternative Design That Ensures Both Containment Isolation & Hydrogen Monitoring Sys Operability in Event of LOCA ML20064A0181990-08-16016 August 1990 Submits Supplemental Response to NRC Bulletin 88-008,Suppls 1 & 2.Surveillance Testing Revealed No Leakage,Therefore Charging Pump to Cold Leg Outage Injection Lines Would Not Be Subjected to Excessive Thermal Stresses ML20063Q1051990-08-10010 August 1990 Forwards Monthly Operating Repts for Jul 1990 for Byron Units 1 & 2 & Corrected Monthly Operating Rept for June 1990 for Unit 2 ML20055J1221990-07-25025 July 1990 Notifies That Plants Current Outage Plannings Will Not Include Removal of Snubbers.Removal of Snubbers Scheduled for Future Outages.Completion of Review by NRC by 900801 No Longer Necessary ML20055H7631990-07-25025 July 1990 Forwards Financial Info Re Decommissioning of Plants ML20055J1261990-07-25025 July 1990 Notifies That Replacement of 13 Snubbers w/8 Seismic Stops on Reactor Coolant Bypass Line Being Deferred Until Later Outage,Per Rl Cloud Assoc Nonlinear Piping Analyses ML20055G3251990-07-16016 July 1990 Responds to SALP Board Repts 50-454/90-01 & 50-455/90-01 for Reporting Period Nov 1988 - Mar 1990.Effort Will Be Made to Continue High Level of Performance in Areas of Radiological Controls,Plant Operations,Emergency Preparedness & Security ML20044A9621990-07-13013 July 1990 Forwards Rev 0 to Topical Rept NFSR-0081, Comm Ed Topical Rept on Benchmark of PWR Nuclear Design Methods Using PHOENIX-P & Advanced Nodal Code (Anc) Computer Codes, in Support of Implementation of PHOENIX-P & Anc ML20044B1411990-07-12012 July 1990 Forwards Addl B&W Rept 77-1159832-00 to Facilitate Completion of Reviews & Closeout of Pressurized Thermal Shock Issue,Per NRC Request ML20044B2081990-07-11011 July 1990 Responds to Generic Ltr 90-04 Re Status of GSI Resolved W/ Imposition of Requirements or Corrective Actions.Status of GSI Implementation Encl ML20044B2141990-07-11011 July 1990 Withdraws 891003 Amend Request to Allow Sufficient Time to Reevaluate Technical Position & Develop Addl Technical Justification ML20044A9521990-07-10010 July 1990 Provides Supplemental Response to NRC Bulletin 88-001. Remaining 48 Breakers Inspected During Facility Spring Refueling Outage ML20044A7991990-06-29029 June 1990 Forwards Description of Change Re Design of Containment Hydrogen Monitoring Sys,Per 900517 Request.Util Proposing Alternative Design Ensuring Containment & Hydrogen Monitoring Sys Operability in Event of Power Loss ML20055D4811990-06-29029 June 1990 Discusses Revised Schedule for Implementation of Generic Ltr 89-04 Re Frequently Identified Weaknesses of Inservice Testing Programs.All Procedure Revs Have Either Been Approved or Drafted & in Onsite Review & Approval Process ML20055D2951990-06-22022 June 1990 Discusses Results of 900529-0607 Requalification Exam.Based on Results of Exam,Station Removed/Prohibited Both Shift & Staff Teams & JPM Failure from License Duties.Shift Team Placed in Remediation Program from 900611-14 ML20058K3521990-06-22022 June 1990 Requests Withdrawal of 900315 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,changing Tech Specs 3.8.1.1 & 4.8.1.1.2 to Clarify How Gradual Loading of Diesel Generator Applied to Minimize Mechanical Stress on Diesel ML20043D3151990-06-0101 June 1990 Forwards Rev 30 to Security Plan.Rev Withheld (Ref 10CFR73.21) ML20043E3141990-05-31031 May 1990 Withdraws 880302 Application for Amend to Licenses NPF-37, NPF-66,NPF-72 & NPF-77,changing Tech Spec 4.6.1.6.1.d to Reduce Containment Tendon Design Stresses to Incorporate Addl Design Margin,Due to Insufficient Available Data ML20043F4731990-05-30030 May 1990 Forwards Suppl to 881130 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77.Changes Requested Per Generic Ltr 87-09,to Remove Unnecessary Restrictions on Operational Mode Changes & Prevent Plant Shutdowns ML20043C8641990-05-29029 May 1990 Forwards Rept of Local Leakage Rate Test Results for Third Refueling Outage.Leakage Rates of Six Valves Identified as Contributing to Failure of Max Pathway Limit ML20043B7691990-05-23023 May 1990 Forwards Endorsement 11 to Nelia & Maelu Certificates N-93 & M-93 & Endorsement 9 to Nelia & Maelu Certificates N-101 & M-101 ML20043A9161990-05-16016 May 1990 Provides Advanced Notification of Change That Will Be Made to Fire Protection Rept Pages 2.2-18 & 2.3-14 ML20043A6391990-05-11011 May 1990 Submits Revised Schedule for Implementation of Generic Ltr 89-04 Guidance.Rev to Procedures for Check Valve & Stroke Time Testing of power-operated Valves Will Be Completed by 900629 ML20043A2891990-05-10010 May 1990 Forwards Monthly Operating Rept for Apr 1990 & Corrected Rept for Mar 1990 for Byron Nuclear Power Station ML20042G7111990-05-0707 May 1990 Responds to NRC Questions Re leak-before-break Licensing Submittal for Stainless Steel Piping.Kerotest Valves in Rh Sys Will Be Replaced in Byron Unit 2 During Next Refueling Outage Scheduled to Begin on 900901 ML20042F6851990-05-0404 May 1990 Requests Resolution of Util 870429,880202 & 0921 & 890130 Submittals Re Containment Integrated Leak Rate Testing in Response to Insp Repts 50-454/86-35 & 50-455/86-22 by 900608 ML20042G3591990-04-30030 April 1990 Forwards Errata to Radioactive Effluent Rept for Jul-Dec 1989,including Info Re Sr-89,Sr-90 & Fe-55 Analysis for Liquid & Gaseous Effluents Completed by Offsite Vendor ML20055C5761990-04-30030 April 1990 Forwards Results of Investigation in Response to Allegation RIII-90-A-0011 Re Fitness for Duty.W/O Encl ML20042E9601990-04-30030 April 1990 Forwards Response to NRC 900327 Ltr Re Violations Noted in Insp Repts 50-454/90-09 & 50-455/90-08.Response Withheld (Ref 10CFR73.21) ML20042E9111990-04-25025 April 1990 Forwards Rev 1 to Nonproprietary & Proprietary, Steam Generator Tube Rupture Analysis for Byron & Braidwood Plants. ML20012E1081990-03-21021 March 1990 Forwards Calculations Verifying Operability of Facility Dc Battery 111 W/Only 57 of 58 Cells Functional & Onsite Review Notes,Per Request ML20012D8671990-03-21021 March 1990 Reissued 900216 Ltr,Re Changes to 891214 Rev 1 to Updated Fsar,Correcting Ltr Date ML20012C5471990-03-12012 March 1990 Provides Results of Completed Util Reviews & Addresses Addl Info Requested by NRC Re 890317 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77 to Change Tech Spec 4.5.2,supplemented on 890825 & 890925-27 Meetings ML20006E1441990-02-16016 February 1990 Forwards Suppl to Rev 1 to Updated FSAR for Braidwood Station,Units 1 & 2 & Byron Station,Units 1 & 2,per 881214 & 891214 Submittals ML20012A4491990-02-16016 February 1990 Advises That 16 Tubes in All Four Steam Generators Removed from Svc as Result of Eddy Current Insp During Cycle 3 Refueling Outage.Tube Plugging Distribution Between Steam Generators Listed ML20006E4201990-02-14014 February 1990 Requests NRC Approval for Use of Alloy 690 Steam Generator Tube Plugs for Facility,Prior to 900301,pending Final ASME Approval of Code Case for Alloy 690 ML20006E2611990-02-0909 February 1990 Responds to NRC Bulletin 88-009 Re Thimble Tube Thinning. Thimble Tube Insps Performed Using Eddy Current Testing Methodology & Performed at Every Refueling Outage Until Sufficient Data Accumulated to Generate Correlation ML20011F3661990-02-0707 February 1990 Forwards Errata to Radioactive Effluent Rept for Jan-June 1989 & Advises That Sr-89,Sr-90 & Fe-55 Analysis for Liquid & Gaseous Effluents Completed by Offsite Vendor ML20006D6911990-02-0202 February 1990 Provides Alternative Design Solution to Dcrdr Implementation at Facilities.Simpler Design Devised,Using Eyelet Screw Inserted in Switch Nameplate Which Is Identical to Providing Caution Cards in Close Proximity to Switch Handle ML20006E1521990-01-31031 January 1990 Discusses Applicability of Safety Evaluations Prior to Manipulation of ECCS Valves,In Response to Violations Noted in Insp Repts 50-454/89-16 & 50-455/89-18.Nuclear Operations Directive Re ECCS Valve Positions Will Be Sent by 900415 ML19354E4451990-01-22022 January 1990 Submits Update on Status of RHR Sys Iconic Display at Facilities,Per Generic Ltr 88-17 Re Loss of Dhr.Computer Graphics Display Data in Real Time & Reflect Status of Refueling Water Level & RHR Pump Parameters ML20005G7161990-01-20020 January 1990 Forwards Rev 1 to Updated FSAR for Braidwood & Byron Units 1 & 2.Changes in Rev 1 Include Facility & Procedures Which Were in Effect as of 890610.W/o Encl ML20005G3831990-01-10010 January 1990 Suppls 891117 Application for Amends to Licenses NPF-37 & NPF-66,incorporating Further Clarification of Curve Applicability in Tech Spec Figure 3.4-2a,per 891229 Telcon W/Nrc ML20005G6431990-01-10010 January 1990 Responds to Generic Ltr 89-21 Re Implementation of USI Requirements,Consisting of Revised Page to 891128 Response, Moving SER Ref from USI A-10 to A-12 for Braidwood ML20006B8821990-01-10010 January 1990 Reissued Ltr Correcting Date of Util Ltr to NRC Which Forwarded Updated FSAR for Byron/Braidwood Plants from 881214 to 891214.W/o Updated FSARs ML20005E1911989-12-26026 December 1989 Forwards Revised Page 2 Correcting Plant Implementation Date for USI A-24 Requirements in Response to Generic Ltr 89-21 ML20005E1751989-12-22022 December 1989 Forwards Rev 29 to Security Plan.Rev Withheld (Ref 10CFR73.21) ML19332F6621989-12-14014 December 1989 Forwards Amend 12 to, Byron/Braidwood Stations Fire Protection Rept. Amend Reflects Changes to Facility & Procedures Effective 890630 1990-09-17
[Table view] |
Text
-- -
. /^N Commonweilth Edison
) One First Nationit Plua. Chic 1go. Ilknois
T'
( } Address R: ply to: Post Othc3 Box 767
% j Chicago. Illinois 60690 .
October 4,1984 Mr. Harold R. Denton, . Director Office of Nuclear Reactor Regulations U.S. Nuclear Regulatory Coinrission Washington, D.C. 20005
SUBJECT:
Byron Generating Station Units 1 and 2 Technical Specifications NRC Docket Nos. 50-454 and 50-455
Dear Mr. Denton:
In accordance with our review of the September 24, 1984 deferral letter from L.0. Del George to Harold R. Denton, we have currently identified certain Tech Specs which require interim Tech Specs based
.on the granting of the deferral. Those currently identified are included as attachments to this letter.
Each interim Tech Spec is worded to be consistent with the MODES and time requirements as discussed in the deferral letter.
Very ruly yours, w
Dennis L. Farrar ;
Director, Nuclear Licensing '
l cc: NRC Senior Resident Inpsector - Byron Lenny 01shan 8410220051 PDR ADOCK e4100405000454 PDR A
8 001
'l*
i INTERIM TECHNICAL SPECIFICATION i1 SYSTEM: its Main Steam itSIV's DESCRIPTION: MSIV's (lMS001A-D) drift open STATUS: End of cycle position switches have been adjusted, retest remains.
TECH SPEC APPLICABILITY: ifode 3 ,.
COMPLETION REQUIRED PRIOR T0:
Initial Criticality (tiode 2)
BASIS: Fission product inventory and resultant effluent are within radiological release limits up to an equivalent of 10 full power days of operation not exceeding 25% power. Additional details are contained in October 27, 1983, letter from T. R. Tram to H. R. Denton.
i l
. - . _ _ _ _ _ _ _ ___ _ _ _ _ _ _. J..
Cd N l989 j
PLANT SYSTEMS MAIN STEAM LINE ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.7.1.IEachmainsteamlineisolationvalve(MSIV)shallbeOPERABLE. ,
APPLICABILITY: MODES 1, 2, and 3.
ACTION:
MODE 1:
With one MSIV inoperable but open, POWER OPERATION may continue provided the inoperable valve is restcred to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; otherwise be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
MODES 2 and 3:
With one MSIV inoperable, subsequent operation in MODE 2 or 3 may proceed provided the isolation valve is maintained closed. The provisions of Specification 3.0.4 are not applicable. Othenvise, be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.7.1.5 Each MSIV shall be den nstrated OPERABLE by verifying full closure within 5 seconds when tested pursuant to Specification 4.0.5. The provisions l
of Specification 4.0.4 are not applicable for entry into MODE 3. ,
l l
- Not reguired bs9ece- ini&l criticality on Cy cle. l .
l 4
I l
i 1
i BYRON - UNIT 1 3/4 7-9
_ _ __ . _ _ _ _ - - _ _ _ - _.L -
%* y h
^
INTERIM TECHNICAL SP' ECIFICATION i 2 m..
/, } l ^-
SYSTEM: VC Control Room Ventilation
. ,u
. DESCRIPTION: Control room boundary differential pressure of 1/8 in.
water gauge not achieved STATUS: 1/8 in, water gauge differential pressure with respect to
.< ambient has bean established during operation of redundant i '
" Train B. Train A balancing damper adjustments in process. A 1/8 in. water gauge differential relative to auxiliary building surrounding areas requires-the auxiliary building ventilation system (VA).
TECH SPEC APPLICABILITY: -
Mode 6 it
'#~" COMPLETION REQUIRED PRIOR TO:
For Train A, 1/8 in, water gauge differential with respect to ambient will te complete prior to initial criticality (Mode 2). For Train a and B, 1/8 in, water
,3 gauge differential with respect to surrounding areas will be obtained prior to accumulating 10 effective full power days at power levels not exceeding 25% power.
? -
BASIS: Fission product inventory is trivial in comparison to the inventories employed by FSAR Safety Analysis, and therefore.
- will not threaten Control Room habitability. See October 27, 1983 letter from T.R. Tramm to H. R. Denton.
e 4
.c
'AtlR ') o G 4 3/4.7.6 CONTROL ROOM VENTILATION SYSTEM '=I LIMITING CONDITION FOR OPERATION 3.7.[TwoindependentControlRoomVentilationSystemsshallbeOPERABLE.
APPLICABILITY: All MODES.
ACTION:
MODES 1, 2, 3 and 4:
With one Control Room Ventilation System inoperable, restore the inoperable system to OPERABLE status within 7 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
MODES 5 and 6:
- a. With one Control Room Ventilation System inoperable, restore the inoperable system to OPERABLE status within 7 days or initiate and maintain operation of the remaining OPERABLE Control Room Ventilation System in the make-up mode.
- b. With both Control Room Ventilation Systems inoperable, or with the OPERABLE Control Room Ventilation Jystem, required to be in the make-up mode by ACTION a. not capable of being powered by an OPERABLE emergency power source, suspend all operations involving CORE ALTERATIONS or positive reactivity changes.
SURVEILLANCE REQUIREMENTS 4.7.6 Each Control Room Ventilation System shall be demonstrated OPERABLE:
- a. At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the control room air temperature is less than or equal to 90'F;
- b. At least once per 31 days on a STAGGERED TEST BASIS by initiating,
- from the control room, flow through the HEPA filters and charcoal.
adsorbers and verifying that the system operates for at least 10 continuous hours with the duct heaters operating;
- c. At least once per 18 months or (1) after any structural maintenance i
on the HEPA filter or charcoal adsorber housings, or (2) following l painting, fire or chemical release in any ventilation zone l communicating with the make-up system filter plenum by:
ifd hak CriiE #8l[ M 9 g ay pg (p d b d efit.
i BYRON - UNIT 1 3/4 7-15
"MlR 0 0 @4 d I 3/4.7.6 CONTROL ROOM VENTILATION SYSTEM LIMITING CONDITION FOR OPERATION
+ o ne.
3.7.6 T.. in ;;;;d;r.t Control Room Ventilation System / shall be OPERABLE.
APPLICABILITY: ?.11 =25, 3% S 6 3 ACTION:
MODES p, T 3 and 4:
4 howes.
With one+h< Control Room Ventilation System 'noperable, restore the inoperable system to OPERABLE status within 7 .;- r be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
MODES 5 and 6:
l ~
l E. w i sii vn. Ow..t.ei "::: '.';;til:ti n Sy;t:: ' :;;r; tic, r;;;s.. on.
l inog. .wie sy n.em 69 vie MGLE .L.Lua - 6uin 7 asyi or inii e;. and a
j ;ioto... .ys eti;; c' 'ha 'a==ining noroan:e e- ;; g ,,, ,, ,;;,,,yn i Syst- '- th: r L. _; :::: . -
l the l qg With be4rh-Control Room Ventilation System / inoperableg. ..U. t.%
0"i"*f" E 0 :tr:1 "::: '!: tf 'sti r Sy;te..., . .y. ; ed sw L ir. tr.;
_=^=-"a -ad-by ^"T!CM ;. c.;t ;;;eLie f .;ny yw.. eu vy on 0"5"'?.: ;;;c;;n;3 r ... ... us, suspend all operations involving CORE ALTERATIONS or positive reactivity changes.
I
- SURVEILLANCE REQUIREMENTS T*bt.
4.7.6 ,Eeeh Control u,om Ventilation System shall be demonstrated OPERABLE:
- a. At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the control room air temperature is less than or equal to 90*F;
- b. At least once per 31 days on a STAGGERED TEST BASIS by initiating, from the control room, flow through the HEPA filters and charcoal.
adsorbers and verifying that the system operates for at least 10 continuous hours with the duct heaters operating;
- c. At least once per 18 months or (1) after any structural maintenance l on the HEPA filter or charcoal adsorber housings, or (2) following painting, fire or chemical release in any ventilation zone communicating with the make-up systes filter plenum by:
fl cable On! b f. k o f f., GriflC 4! OO
.;( f A[Yl Al C c,l e I
- 3- t BYRON - UNIT 1 3/4 7-15 A
r- _
- . - m - :-
. . , s.-
- .....~ . . i.
PL;.'G 5VSTEMS L'"~~
W 13 34 .~ _ I ~3 ~.4
, SJ..EIu.ANCE REQUIREMENTS (Continueo)'
- 3) Verifying that thd Make-up System maintains the control room at a positive nominal'pren ure or greater than or equal to 1/8 inch Water Gauge relative to ambient pressure in areas adjacent to this Control Room Area and
- 4) Verifying that the heaters dissipate 27.2 2.7 kW when tested in accordance with ANSI N510-1975.
- f. After each complete or partial replacement of a HEPA filter bank, by l verifying that the cleanup system satisfies the in place penetration '
and bypass leakage testing acceptance criteria of less than 0.05% in 1 accordance with. ANSI N510-1975 for a 00P test aerosol while operating '
thi cystem at a flow rate of 6000 cfm + 10% for the Make-up System; and ,
- g. After each complete or partial replacement of a charcoal adsorber bank, by verifying that the cleanup system satisfies the in place - -
penetration'and bypass leakage testing acceptance criteria of less than 0.05% in accordance with ANSI N510-1975 for a halogenated hydro-carbon refrigerant test gas while operating the system at a flow rate o'f 6000 cfm 10% for the Make up System.
.~
Pom e
- Prior to Ten E f f ective. F ull or 24 7a power'(Cycle 1), t his Da34 is s urvei llance reguir e merit-that the. make-up.
- 3) Verifging m ain te/ns, t h e C ontro l System R oom of a pos-i tiv e pressure to all adjacent with respe.ct ares
' ~ ~~ ~ ~'*
_ - . - . L.-__ . T -_ _ ::- ~l_ . - _ . ~ ~ .._ 11-_l , . - -
. INTERIM TECHNICAL SPECIFICATION # 3 a
SYSTEM: VA Auxiliary Building Ventilation DESCRIPTION: OPERABILITY of Exhaust Filter System not required at Fuel Load STATUS: Under Construction TECH SPEC APPLICABILITY: Modes 1, 2, 3, and 4 F
COMPLETION REQUIRED PRIOR TO: Ten full power days of operation, not exceeding 25% of full power i
l l
l l
l BASIS: Fission product inventory and resultant gaseous effluent are within radiological release limits up to an equivalent of ten full power days of operation, not exceeding 25% of r full power. Additional details contained in October 27, 1983, letter from T. R. Tramm to H. R. Denton.
I l
._._.o.. ., . . . ~ .. . . _ .. - -.. . . . . . . . .._ ... . . . - . . . _ . . . . .
.': l !.~ 3iSTE'S I. b & !. x i .. ,,
J..7 C,-ACCESSIELE AREA E.XHAUST FILTER PLEfG4 VENTILATION 5:57EM SEr 1 2 'fla LIMITING CONDITION FOR OPERATION I W6 Y
3.7.7 Three independent non-accessible area exhaust filter' plenums (50%
cacacity each) shall be OPERABLE.
-APPLICABILITY: MODES 1, 2, 3, and 4.
ACTION:
With one non-accessible area exhausti filter blenum inoperable, restore the inoperable plenum to OPERABLE status'wtInin 7 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 . hours. .
SURVEILLANCE REQUIREMENTS -
4'. 7. 7 Eachn'on-accessibleareaexhaust'. filter,plenump~hallbedemonstrated OPERABLE:
- a. At least once per 31 days on a STAGGERED TEST BASIS by initiating,'
from the control room, flow through the HEPA filters and charcoal adsorbers and verifying that operation occurs for at least 15 minutes;
- b. At least once per 18 months, or (1) after any structural maintenance on the HEPA filter or charcoal adsorber hoosi.ngs, or (2) following painting, fire, or chemical telease in any ventilation zone communi-cating with the exhaust filtar plenum by:
- 1) Yerifying that the exhausts. filter plenum satisfies the in place penetration and bypass leakage testing acceptance criteria of less than 1.0% when using the test procedure guidance in Regulatory Positions C.S.a, C.S.c and C.5 d of Regulatory Guide 1.52, Revi-sion 2, March 1978, and the flow rate is 65,900 cfm 10%;
- 2) Verifying, within 31 days after removal, that a lat: oratory analysis of a representative carbon sample from each filter obtained in accordance with Regulatory Position C.6.b of Regula-tory Guide 1.52, Revision 2, March 1978, meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978, when the average of the methyl iodide penetration for the three samples is less than 7.1%;
Evf ectNe Fu ll # M
- Noy h'enble, u nNI T*0 4PP p c- ( C3c l e l ",$)'
or exteetInf BYRON - UNIT 1 3/4 7-18
.--- ^-
g - A g:g44,g..y y-;g... _
7,. . g.;. g J'
TABLE NOTAT:CNS b k bfM(( um
- With new fuel or irradiated fuel in the fuel stort;e areas or fuel bu'ilcing.
"" Trip Setpoint is to be established sucn that tne uctual suomersion dose rate would not exceed 10 mR/hr in the containment building. For containment purge or vent the Setpoint value may be increased up to twice the maximum concentra-tion activity in the containment determined by the sample analysis performec prior to each release in accordance with Table 4.11-2 provided the value does not exceed 10% of the equivalent limits of Specification 3.11.2.1.a in accord-ance with the method:':gy and parameters in the 00CM.
- ACTION STATEMENTS ACTION 26 - With less than the Minimum Channels OPERASLE requirement, or eration may continue provided the containment purge valves aru maint.ained closed.
ACTION 27 -
With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirer,ent, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> isolate th2 Control Room Ventilation System snd initiate operation of the. Control Room Make-up System.
ACTION 28 - Must 54tisfy the ACTION requirement for Specification 3.4.6.1.
-A f ter ren E F E ective Full Powec Da3s oe a,s % Pour (.C3 cle i only ACTION 29 - Jith the number of OPERABLE channels one less than the Minimum i Channels OPERABLE requirement, ACTION a. of Specification 3.9.12 must be satisfied. With both enannels inoperable, provide an appropriate portable continuous monitor with the same Alarm Set-
! point in the fuel pool area cr.c m isfy ACTION t. f 3aci'ic:. "-
^ '" ' ^ " with one Fuel Handling Building Exhaust filter plenum l
4 in operation. CHweconse_ saHs69 AcncM b. of- Spe64ccHm
- 3. 9.12..
e i
~P/tbn i T.un E p F 4 Pou>en Dgs 25"7o pmm ( C yc le. / ent ) w & f cAn h w btn of o BER A B LE chonvyulo om #s ui ivn Ik h '
brvruh o P E 2 A B L E. gmaM, an-x rA4vwegud>4 l' c d & n e d f.o oPER A 6L E h ux'tA4A 7J Aetouv3 e
l W b4 K triunk O am CLffax &Q(&NNff**
- W W M h%+wg _ p W Muum %% a 4
@Y"*""** "t"" %W, m & &r f4 =% du % p<
ae *1 b 5 juv-/ .
, ik e,9" BYRON - UNIT 1 3/4 3-41 1
.-~--,.-~dow-*:~*m*-***- " ' ' * * ' ' * * ~ ~ * ~ ~ ~ ~ ' ~ '~"Y~~~" ~
- w. _a__m....--
O REFUELING OPERATIONS 3/4.9.4 CONTAINMENT BUILDING PENETRATIONS g gg g LIMITING CONDITION FOR OPERATION 3.9.4 The containment building penetrations shall be in the following status:
- a. The personnel hatch should have a minimum of one door closed at any one time and the equipment hatch shall be in place and held by a minimum of four bolts or 4he. e Surveillance. Reguirern,ent 4.9.4gPrned hatA remod por sucxd b
- b. A minimum of one door in the personnel emergency exit hatch is closed, and
- c. Each penetration providing direct access from the containment atmosphere to the outside atmospnere shall be either:
- 1) Closed by an isolation valve, blind flange, or manual valve, or
- 2) Capable of being closed by an OPERABLE automatic containment purge isolation valve. .
APPLICABILITY: During CORE ALTERATIONS or movement of irradiated fuel within
(' the containment.
ACTION:
With the requirements of the above specification not satisfied, immediately
- suspend all operations involving CORE ALTERATIONS or movement of irradiated fuel in the containment building.
SURVE7LLANCE REQUIREMEN'3 4.9.4.1 Each of the above required containment building penetrations shall be
- determined to ba either in its closed / isolated condition or capable of being closed by an OPERABLE automatic containment purge isolation valve within 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> prior to the start of and at least once per 7 days during CCRE ALTERATIONS or movement of irradiated fuel in the containment building by
l a. Verifying the penetrations are in their closed / isolated condition, or l
l b. Testing the containment purge isolation valves per the applicable portions of Specification 4.6.3.2.
. 4. 9. 4. 2. See Ins d l
l l BYRON _ UNIT 1 _ __
3/4 9-4 _ _ _ _ _ _ _. . ___ _ _ _ _ _ _ _ _ _ _ _ . _ _ .
- cp senr-
- 4. 9. 4. 2f~ Ver;4 9 % f +he Fuel Handliny Building Exhaush Filler Plenorns maintain 4he Fuel BuiIdiny of a neyah*te. preauce of-greakr hw or ylwHk fo V4 inch Lonkr gav3t. reloHA lo iht ovFJid* atmosphge, ihe qu',pmenf hatch removal i
- 0. Prior ib CocE ALTFEAT/oN5 or (noremen E of rracliafed Gel and b.
A4-thcVement ch area leash once. yw d,afeil fueI'l days durin} COGE Verificah'an cf ne Ah've- pressure will be- perforrned uiR Sykms in -4he. normal sruse#9cs move.
u ntl / Te n E -P -T CC Y N C'
-)( - /Vot a g lic a ble f U pull 90 u) < I D#M c gg pou) er (Cy Cle / on lg ).
i l
l
- . - , .,_-.._r_ ,..m-.,.-._.,_-..,_,_-.__.-__--.._.._.....,m. . . . , _ _ . _ _ _ - , .
, . , - - _ _ _ _ - - , - .