ML20043A639

From kanterella
Jump to navigation Jump to search
Submits Revised Schedule for Implementation of Generic Ltr 89-04 Guidance.Rev to Procedures for Check Valve & Stroke Time Testing of power-operated Valves Will Be Completed by 900629
ML20043A639
Person / Time
Site: Byron  Constellation icon.png
Issue date: 05/11/1990
From: Richter M
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-04, GL-89-4, NUDOCS 9005220342
Download: ML20043A639 (2)


Text

,

fylt

'a

' ' ( /i,

~

' f'N '.

d 1/

) 1400 Opua P:p%.

C:mmtnwnttb Euls:n '

g \\ _

r.

~'

Downers Grose, Illinois 60515 r

s

.May 11, 1990 U.S. Nuclear Regulatory Commission Attas. Document Control Desk Washington, D.C..-20555-

i

Subject:

. Byron Station Units 1 and 2-'

N Revised Schedule for Impicmentation-of Generic Letter 89-04 Guidance NRO Docket Nos. 50-454 anc' _50-455

~

References:

. (a) Generic' Letter 89-04, dated April 3, 1989

]

<(b) M.- Richter (CECO) letter' to U.S. NRC, dated

(

~

~

October 2, 1989.

(c): R.' Chrzanowski MCEco) letter to T.E., Murley (NRC),

-t dated December 21, 1988.-

i'

'(d) Minutes of:the Public Meetings on Generic Letter 89-04, dated October 25, 1989.

Dear Sir:

i, Generic Letter 89-04 (Generic Letter) was iesued to provide guidance i

to licensees on frequently identifiedLweaknesses of-Inservice Testing-(IST).

Programs. 4As reported in ReferenceL(b), all offCommonwealth Edison Company's

'(CECO) nuclear stations required IST Program and implementation' procedure revisions to conform with the' guidance / positions provided in the. Generic Letter. Additionally, Reference (b).provided a'schedulejfor.the completion of these actions for each station. This letter presents a revised schedule for h

Byron Station.-

l-L.

Reference (b) indicated for Byron Stationithat'.the;IST Program and

[

implementation procedure revisions necessary to conform with the-guidance / positions. in 'the Generic Letter were expected to' bc completed by L

Apr11 30, 1990.

The majority of the implementation procedure revisions, as n-L result of the Generic Letter, are.acso'ciated with check valve testing and' L

stroke time'tescing;of the power operated valves. Currently, flow values for i:

fullustroke testing of check valves and. limiting values of atroke time for power operated valves have been established, and the implementation proceduro revisions are in progress.

It is now. expected that the remaining' procedure revisions will be. completed'by June 29, 1990. Regarding the IST Program revision, Byron Station, which was identified as a'" Table 2" plant.in the Generic Lottet, was issued a Safetv Evaluation Report (SER) in September 1988. Anomalies identified in the SER were addressed-and a revised IST Program (Revision.7 for pumps and Revision 8 for valves) was submitted on December 21, 1988 (Reference (c)).

It is CECO s understanding that a i

Supplemental SER will be issued in the near future in response to Reference (c). Based on recent discussions with the NRC, and CECO's understanding of the guidance in Reference (d), an IST Program revision necessitated by the guidance / positions in.the Generic Letter may be submitted after receipt'ofLthe-

^

Supplemental SER. Therefore, the Byron Station IST Program revision will be submitted within.90 days of receipt of the Srpplemental SER..

9005220342 900511 PDR-ADOCK 05000454 P

PDC.

.;p 4

// 0

gi/ 'O,

.. 3 p-

p

!. :- c(

c. -

r n

b j,, e4 -

+: ; 1.1/Si: 'acleariRegulatory Comunission'- -

.May 11, 1990

~

4 W,

a i

Please direct any questions-that you have'on'this letter;to.this.

=j

- of fice.'.

t Respectfully, g..

1

)M.H. Richterf I

- Generic Issues' Administrator'..

1 1

i 9

^

- cc:. ' A.B. Davis - Regional Administrator,ERegion;III /

Byron Resident Inspector P. Shemanski - NRR Project Manager