A main steam line (MSL) are the pipes which carry steam from the reactor to the main turbine. The isolation device is main steam isolation valves.
System |
---|
|
|
| Site | Start date | Title | Description |
---|
ML24303A116 | Palisades | 6 November 2024 | Summary of Meeting with Holtec Decommissioning International, LLC Regarding LAR Request to Approve the Biasi Critical Heat Flux Correlation for Use with the Main Steam Line Break Analysis to Support Potential | | IR 05000461/2024003 | Clinton | 5 November 2024 | Integrated Inspection Report 05000461/2024003 | | ML24309A303 | Palisades | 4 November 2024 | Applicants Answer Opposing Joint Petitioners Petition for Hearing | | ASLBP 24-986-01-LA-BD01, NRC Staff Answer to Intervention Petition from Beyond Nuclear, Dont Waste Michigan, Michigan Safe Energy Future, Three Mile Island Alert, and Nuclear Energy Information Service in Palisades Restart Amendments Proceeding | Palisades | 4 November 2024 | NRC Staff Answer to Intervention Petition from Beyond Nuclear, Dont Waste Michigan, Michigan Safe Energy Future, Three Mile Island Alert, and Nuclear Energy Information Service in Palisades Restart Amendments Proceeding | | ML24309A302 | Palisades | 4 November 2024 | Applicants Answer Opposing Beyond Nuclear Et Al.S Petition for Hearing | | ML24297A297 | | 31 October 2024 | NUREG/IA-0550, Modelling Guidelines for Ccfl Representation During Ibloca Scenarios of PWR Reactors | | ML24151A384 | Limerick | 31 October 2024 | – Issuance of Amendment Nos. 264 and 226 Support to Digital Modernization Project Installation (EPID L-2023-LLA-0025) and Exemption from the Requirements of 10 CFR 50.62 | | IR 05000269/2024003 | Oconee | 31 October 2024 | Integrated Inspection Report 05000269/2024003 and 05000270/2024003 and 05000287/2024003 (2) | | IR 05000321/2024003 | Hatch | 30 October 2024 | Edwin I Hatch, Units 1 and 2 - Integrated Inspection Report 05000321/2024003 and 05000366/2024003 | | ML23032A443 | | 30 October 2024 | Rulemaking - Proposed Rule - Draft NRC Form 361S, Part 53 Plant Event Notification Worksheet Risk-Informed, Technology-Inclusive Regulatory Framework for Advanced Reactors (Part 53) | |
|