a t
p jg?.
4
['
Commonwealth Edison -
lI
'/
J L Byron Nuc, liar St: tion ' -
6 CD 14450 North German Church Road
- (
4 i
s/>i Byron, Illinois 61010 June 22,,1990J
[
'LTR '
Byron 90-0592-
' FILES.
1.6.5110 TOs.
Geoffrey Wright-Chief operations Branch
.U.S. Nuclear Regulatory Commission Region III g '
799 Roosevelt Road W
Glen Ellyn,-IL 60137 i
Subject:
L Byron Station Requalification Exam
=
+
z
Dear Mr. Wright:
l7 The 1990. Byron Station-NRC Requalification Exam was conducted May 29th through June.7th.- - The NRC preliminary results were given'to the station at the exit meeting held.on June 8th..The NRC identified one shift team failure, one. staff
. team failure, and one JPM failure.. Byron Station identified one staff team failure and one JPM failure.
Based'on these results, the station immediately removed / prohibited both teams and the JPM failure from' license duties. The shift team was placed in a remedia-tion program which ran June lith through June 14th..This program consisted of
.four days of simulator training with primary emphasis placed on diagnostic and-
-communication skillsi on the fifth day,'all individuals and the team were re-examined and subsequently passed.
A11; individuals of the staff-team presently hold positions which.do not include-T
-norsrequire.any license duties. Therefore, the staff team will not be remediated-
..in the near' future. This team will be prohibited from performing license duties
-as substantially the same crew until they have successfully completed a remediation program.
ls
'The JPM failure will be placed in a remediation program during the week of l 1 1 July 9th'. 'This program will focus on JPM Exam Taking Techniques and practice j
JPM's and will' conclude with a JPM re-examination on July lith. This individual' will be. prohibited from performing license dut.ies until he successfully completes
~
.the remediation program.
w If.you'or your staff have any questions regarding this matter, please. contact lL. Bunner at (815) 234-5441, extencion 2752.
Sincerely b
i R. Pleniewicz i
jg Station Manager
,j.
U
- Byron' Nuclear. Power Sf6 tion P
.RP/LB/ab-g1 9007060123 900622 o
1 PDR-ADOCK 05000454 e
y PtJC
,