ML20063Q105

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Jul 1990 for Byron Units 1 & 2 & Corrected Monthly Operating Rept for June 1990 for Unit 2
ML20063Q105
Person / Time
Site: Byron  Constellation icon.png
Issue date: 08/10/1990
From: Pleniewicz R
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20063Q106 List:
References
BYRON-90-0787, BYRON-90-787, NUDOCS 9008170266
Download: ML20063Q105 (1)


Text

l

)

/

~s} Commonwealth Edison

.{

4450 North German Church Road Byron Nuclear Station i

1

\\.

Byron, Illinois 61010 August 10, 1990 LTRt BYROH 90-0787 l

FILE:

2.7.200 t

Director, Office of Management Information and Program Control United States Nuclear Regulatory Commission Washington, D.C.

20555 f

ATTH:

Document Control Desk i

Gentlement I

Enclosed for your information is the Monthly Performance Report covering Byron Nuclear Power Station for the period July 1 through July 31, 1990.

Also enclosed is a corrected copy of the June 1990 Operating Status for Unit i

2.

Current month Unit Capacity Factor, items 17 and 18 were left off of the original report.

t w

Sincerely, 1

/'{R.Plenlewics f4fLvr Station Manager Byron Nuclear Power Station RP/KO/jr (0625M/0062M) cci A.D. Davis, NRC, Region III NRC Resident Inspector Byron Ill. Dept. of Nuclear Safety M. J. Wallace/K.L. Graesser L

Nuclear Licensing Manager Nuclear Fuel Services, PWR Plant Support D. R. Eggett, Station Nuclear Engineering h

INPO Records Center T. Boyce - USNRC 9006170266 900610

\\\\

' 'PDR ADOCK 00000454 R

PDC

-