ML20217F789

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-454/99-12 & 50-455/99-12 on 990803- 0916.One Violation Occurred Being Treated as NCV
ML20217F789
Person / Time
Site: Byron  Constellation icon.png
Issue date: 10/08/1999
From: Jordan M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20217F794 List:
References
50-454-99-12, 50-455-99-12, NUDOCS 9910210079
Download: ML20217F789 (2)


See also: IR 05000454/1999012

Text

.

n

UNITED STATES

  1. pm Es:vg'o,,

NUCLEAR RE2ULATORY COMMISSION

[

REGloN ll!

g

801 WARRENvlLLE ROAD

U

g

lisle, ILLINols 60532-4351

"

October 8,1999

]

Mr. Oliver D. Kingsley

President, Nuclear Generation Group

Commonwealth Edison Company

ATTN: Regulatory Services

Executive Towers West lil

1400 Opus Place, Suite 500

Downers Grove,IL 60515

SUBJECT:

BYRON INSPECTION REPORT 50-454/99012(DRP); 50-455/99012(DRP)

Dear Mr. Kingsley:

On September 16,1999, the NRC completed an inspection at the Byron 1 and 2 reactor

facilities. The enclosed report presents the results of that inspection.

During this inspection period, control room operations were conducted in a safe, professional,

and controlled manner. Throughout this inspection period, we observed that operators

responded appropriately to alarms, closely monitored main control room panels, were

knowledgeable of plant conditions, and generally used three-way communications. We also

observed that your staff's response to a minor earthquake, which occurred approximately

30 miles from Byron Station, was appropriate. Operators walked down all accessible plant

areas, checked plant structures and equipment, and identified no equipment damage.

Based on the results of this inspection, the NRC has determined that one violation of NRC

requirements occurred with two examples, for failure to implement procedural instruction. This

violation is being treated as a Non-Cited Violation (NCV), consistent with Appendix C of the

Enforcement Policy. The NCV is described in the subject inspection report. If you contest the

violation or severity level of the NCV, you should provide a response within 30 days of the date

of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission,

ATTN: Document Control Desk, Washington DC 20555-0001, with copies to the Regional

Administrator, Region lil; and the Director, Office of Enforcement, United States Nuclear

Regulatory Commission, Washington, DC 20555-0001.

j

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure, and your response, if you choose to provide one, will be placed in the NRC Public

Document Room.

9910210079 991008

PDR

ADOCK 05000454

G

PDR

L

,

!

4

.

I

O. Kingsley

-2-

i

We will gladly discuss any questions you have conceming this inspection.

Sincerely,

/s/ M. J. Jordan

Michael J. Jordan, Chief

Reactor Projects Branch 3

Docket Nos. 50-454; 50-455

License Nos. NPF-37; NPF-66

Enclosure:

Inspection Report 50-454/99012(DRP); 50-455/99012(DRP)

cc w/ encl:

D. Helwig, Senior Vice President, Nuclear Services

C. Crane, Senior Vice President, Nuclear Operations

H. Stanley, Vice President, Nuclear Operations

R. Krich, Vice President, Regulatory Services

DCD - Licensing

W. Levis, Site Vice President

R. Lopriore, Station Manager

B. Adams, Regulatory Assurance Manager

M. Aguilar, Assistant Attomey General

State Liaison Officer

State Liaison Officer, State of Wisconsin

Chairman, Illinois Commerce Commission

i

Distribution:

RPC (E-Mail)

GFD (Project Mgr.) (E-Mail)

J. Caldwell, Rlli w/ encl

B. Clayton, Rlli w/ encl

SRI Byron w/enct

DRP w/ encl

I

DRS w/enci

Rlli PRR w/enct

PUBLIC lE-01 w/enci

Docket File w/enci

!

GREENS

IEO (E-Mail)

i

DOCDESK (E-Mail)

{ggQ[U

(

DOCUMENT NAME: G:\\BYRO\\BYR99012.DRP.WPD

To receive 8 topy of tids document, Indicate in the bar: "C' e by wthout attachmenbencfonure "F* e Copy eth attachrnent/ enclosure 'N' = No copy

OFFICE

Rlli

,l C Rlli

ylb

l

l

NAME

TTongue:JpcM

MJordarf)ML

DATE

10/*1/99

10/F/99

/'

,

OFFICIAL RECORD COPY