ML20012D867
| ML20012D867 | |
| Person / Time | |
|---|---|
| Site: | Byron, Braidwood |
| Issue date: | 03/21/1990 |
| From: | Hunsader S COMMONWEALTH EDISON CO. |
| To: | Murley T NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 9003290014 | |
| Download: ML20012D867 (2) | |
Text
p y 7
-^
/
'N Commonwealth Edison i
I-
- s
/ 1400 Opus Pl;ce
,. e., -
%) Downers Crove,lHinois 60515 j
c 1
'(
i February 16, 1990 (Reissue dated March 21, 1990 to correct letter date) l Dr. Thomas E. Murley Office.of Nuclear Reactor Regulation j
US Nuclear Regulatory Conunission
- Washington, DC 20555
~
l>
Attnt Document Control Desk
Subject:
Byron Station Station Units 1 & 2
)
l Braldwood Station Units 1 & 2 l
Updated, Final Safety Analysis Report (UFSAR)
HRC Docket Nos. 50-454. 50-455. 50-456. and 50-45Z References (a) December 14, 1988, S.C. Hunsader letter to l
T.E. Murley (b) December 14, 1989, S.C. Hunsader letter to
.i T.E. Murley Dear Dr. Murley -
Reference (a) provided the Updated FSAR for the Byron and Braidwood j
stations. Reference (b) provided Revision 1 to the Updated FSAR, which was the first annual update to the updated FSAR submiited pursuant to 10 CFR 50.71(e)(4).
Enclosed with this letter is a supplement.to Reference (b).
-]
'I Conunonwealth Edison reviews that have been performed subsequent to the. submittal of referet.ce (b) have identified that changes intended to have been included in Revision 1 had not been incorporated. These changes provided
]
-in this supplement are of an administrative nature to correct Updated FSAR g
wording. Also drawings that had been intended to be included in-Revision 1 i
but, in some cases were not, are provided here, as well.
Attachment A to this letter provides the updated FSAR " Change Log",
which. identifies and explains new changes not included with Reference (b). As i
such, this version of the Change Log is a supplement to the Change Log included with Reference (b).
Attachment B provides a page list of the Updated FSAR which lists each page in the document and the corresponding revision number for the current page.
^
9003290014 900321 PDR ADOCK 05000454 K
PDC i
l A053
,,g t1""-*
=r P
- =
~
g.
Oso:
^.
.. Commonwealth Edison certifies that the information provided in this submittal accurately presents changes made since the previous submittals
[(References (a) and (b)] to reflect information and analyses submitted to the NRC or prepared pursuant to NRC requirements.
Similarly, references (a) and (b) had accurately preserted the changes made to the Byron and Braidwood facilities in effect at the time of the submittals consistent with the requirements of 10 CFR 50.71(e)(4).
Pursuant'to'10 CFR 50.4(b)(6), one signed original and ten-(10) copies are being provided to the Document Control Desk, plus two (2) copies are being provided to the NRC Region III office and one (1) copy each to the Byron and Braidwood Resident Inspectors' offices.
.Please address any questicas concerning this submittal to this office.
Very truly yours,
(~ '
S.C. Hunsador Nuclear Licensing Administrator
/wja0427T 2 cc L. 01shan-NRR S. Sands-NRR Wayne Shafer - RIII Resident Inspector-Byron Resident Inspector-Braidwood
..-