ML20206E752

From kanterella
Jump to navigation Jump to search
Submits Rept on Number of Tubes Plugged or Repaired During Inservice Insp Activities Conducted at Plant During Cycle 9 Refueling Outage,Per TS 5.6.9
ML20206E752
Person / Time
Site: Byron Constellation icon.png
Issue date: 04/22/1999
From: Levis W
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BYRON-99-0058, BYRON-99-58, NUDOCS 9905050232
Download: ML20206E752 (2)


Text

s .4 Commonwcalth Edium Company 11)run Grncrating Station 11% Nonh German Church Road Ily ron. 11.61010 9791 TclHi8 lii4 ill

, s April 22,1999 LTR: BYRON 99-0058 FILE: 3,11.0530 United States Nuclear Regu!atory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Byron Station Unit 1 Facility Operating License No. NPF-37 NRC Docket No STN 50-454

Subject:

Steam Generator Tube Repairs Resulting from Byron Unit 1 Cycle 9 Refueling Outage Inservice insoactions In accordance with Technical Specification 5.6.9, " Steam Generator (SG) Tube inspection l Report," we are reporting the number of tubes plugged or repaired dunng the inservice inspection activities conducted during the Byron Station Unit 1 Cycle 9 Refueling Outage.

These inspections were completed on April 9,1999.

A 100% fulllength eddy current inspection was performed on SGs B, C, and D. No inspections were performed on SG A. This was the first inservice inspection of these SGs following SG replacement during the previous refueling outage.

Based upon the results of the inspections, SG B, C, and D were classified as inspection l

category C-1 in accordance with Technical Specification 5.5.9.c. No tubes were repaired or i plugged during the current Unit 1 Cycle 9 Refueling Outage. The tube plugging distribution for the SGs is summarized in the below table:

Steam Tubes Plugged Tubes Plugged Total Tubes Generator This Outage during Pre-Service Plugged

  • l (01R09) 1A 0 0 0 g  !

o 1B 0 0 , 0 -

I

. , .1 C ' O J '1

- -1 l 1D 0 4 '0- '

u 0' .,

cu Totals 0 1 1

(.s Oh ;

30

' *6633 Tubes per SG.

9905050232 990422 s PDR ADOCK 05000454 G PDR .L 4 i rnicom Company

E , ,

April 22,1999 LTR: BYRON 99-0058 Page 2 l

If there are any additional questions regarding this matter, please contact Mr. Bradley J. Adams, l Regulatory Assurance Manager at (815) 234-5441, extension 2280. .

fI l William Levis Site Vice President Byron Station W11JLicib cc: Regional Administrator - NRC Rlli Senior Resident inspector- Byron Station j l

I r

I I

I s

p:@\990058. doc