MONTHYEARML20217M2871999-10-21021 October 1999 Refers to Rev 5 Submitted in May 1999 for Portions of Byron Nuclear Power Station Generating Stations Emergency Plan Site Annex.Informs That NRC Approval Not Required Based on Determination That Plan Effectiveness Not Decreased ML20217P6171999-10-21021 October 1999 Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) ML20217M4361999-10-19019 October 1999 Forwards Rev 46 to Braidwood Station Security Plan, IAW 10CFR50.4(b)(4).Description of Changes,Listed.Encl Withheld Per 10CFR73.21 ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217G9791999-10-14014 October 1999 Forwards SE Accepting Relief Requests to Rev 5 of First 10-year Interval Inservice Insp Program for Plant,Units 1 & 2 ML20217F7891999-10-0808 October 1999 Forwards Insp Repts 50-454/99-12 & 50-455/99-12 on 990803- 0916.One Violation Occurred Being Treated as NCV ML20217B6351999-10-0505 October 1999 Forwards for Info,Final Accident Sequence Precursor Analysis of Operational Event at Byron Station,Unit 1,reported in LER 454/98-018 & NRC Responses to Util Specific Comments Provided in ML20212L1791999-10-0505 October 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Rvid & Is Releasing Rvid Version 2 ML20217B2991999-10-0101 October 1999 Forwards Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Water Chemisty Program Was Well Implemented,Resulted in Effective Control of Plant Water Chemistry ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20212J6751999-09-30030 September 1999 Forwards Replacement Pages Eight Through Eleven of Insp Repts 50-454/99-15 & 50-455/99-15.Several Inaccuracies with Docket Numbers & Tracking Numbers Occurred in Repts ML20217A5821999-09-29029 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20217A9311999-09-29029 September 1999 Informs That NRC 6-month Review of Braidwood Identified That Performance in Maint Area Warranted Increased NRC Attention. Addl Insps Beyond Core Insp Program Will Be Conducted Over Next 6 Months to Better Understand Causes of Problem ML20216H4301999-09-23023 September 1999 Informs That Arrangements Made for Administration of Licensing re-take Exams at Braidwood Generating Station for Week of 991108 ML20216F7441999-09-17017 September 1999 Forwards Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824.Three Violations Noted & Being Treated as Ncvs. Insp Focused on C/As & Activities Addressing Technical Concerns Identified During Design Insp Completed on 980424 ML20216F8051999-09-17017 September 1999 Forwards Insp Rept 50-454/99-14 & 50-455/99-14 on 990823-27. Security Program Was Effectively Implemented in Areas Inspected.No Violations Were Identified ML20212A6991999-09-10010 September 1999 Forwards SE Accepting Licensee Second 10-year Interval ISI Program Request for Relief 12R-07 for Plant,Units 1 & 2 ML20211Q9011999-09-0808 September 1999 Advises That Us Postal Service Mailing Address Has Changed for Braidwood Station.New Address Listed ML20211P1841999-09-0808 September 1999 Forwards Insp Repts 50-454/99-15 & 50-455/99-15 on 990824- 26.No Violations Noted.Objective of Insp to Determine Whether Byron Nuclear Generating Station Emergency Plan Adequate & If Emergency Plan Properly Implemented ML20211Q6821999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Byron Operator Licesne Applicants During Wks of 000619 & 26.Validation of Exam Will Occur at Station During Wk of 000529 ML20211Q6611999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Braidwood Operator License Applicants During Wk of 010115 & 22.Validation of Exam Will Occur at Station During Wk of 001218 ML20211P1901999-09-0303 September 1999 Forwards Insp Repts 50-456/99-12 & 50-457/99-12 on 990707-0816.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20211N5151999-09-0303 September 1999 Ack Receipt of Re Safety Culture & Overtime Practices at Byron Nuclear Power Station.Copy of Recent Ltr from NRC to Commonwealth Edison Re Overtime Practices & Safety Culture Being Provided ML20211M1371999-09-0202 September 1999 Discusses 990527 Meeting with Ceco & Byron Station Mgt Re Overtime Practices & Conduciveness of Work Environ to Raising Safety Concerns at Byron Station.Insp Rept Assigned for NRC Tracking Purposes.No Insp Rept Encl ML20211K1081999-09-0202 September 1999 Responds to Request for Addl Info to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Braidwood,Units 1 & 2 & Byron,Unit 2 ML20211P1761999-09-0202 September 1999 Discusses Licensee Aug 1998 Rev 3K to Portions of Braidwood Nuclear Power Station Generating Stations Emergency Plan Site Annex Submitted Under Provisions of 10CFR50.54(q). NRC Approval Not Required ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211G4021999-08-25025 August 1999 Forwards Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed BW990053, Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 21999-08-13013 August 1999 Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 2 BW990052, Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station1999-08-12012 August 1999 Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station 05000454/LER-1998-008, Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER1999-08-12012 August 1999 Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes BW990049, Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle1999-08-0404 August 1999 Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle ML20210U8031999-08-0404 August 1999 Forwards SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval for Second 10-year Inservice Testing Program ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210K0771999-07-30030 July 1999 Submits 30-day Rept Re Discovery of ECCS Evaluation Model Error for Byron & Braidwood Stations,As Required by 10CFR50.46 ML20210K9761999-07-30030 July 1999 Forwards SE Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs, for Plant ML20210G6291999-07-29029 July 1999 Forwards Insp Repts 50-456/99-11 & 50-457/99-11 on 990525-0706.Two Violations Noted & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20210J8951999-07-29029 July 1999 Submits Other Actions,As Described,To Be Taken for Valves to Resolve Potential Pressure Locking Concerns,In Light of Extended Period for Valve Bonnet Natural Depressurization,In Response to GL 95-07, Pressure Locking & Thermal.. BW990045, Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr1999-07-28028 July 1999 Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr ML20210E2151999-07-23023 July 1999 Forwards Byron Unit 1 B1R09 ISI Summary Rept Spring 1999 Outage,980309-990424, in Compliance with Requirements of Article IWA-6000, Records & Repts of Section XI of ASME & P&PV,1989 Edition ML20216D3781999-07-21021 July 1999 Forwards Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR on ITS Format & W(Z) Function, to Account for Error That W Discovered in Computer Code Used to Calculate PCT During LBLOCA ML20210C3961999-07-20020 July 1999 Forwards Insp Repts 50-456/99-09 & 50-457/99-09 on 990517-0623.No Violations Noted.Weakness Identified on 990523,when Station Supervisors Identified Individual Sleeping in Cable Tray in RCA ML20216D7061999-07-19019 July 1999 Forwards Rev 45 to Braidwood Station Security Plan,Iaw 10CFR50.4(b)(4).Plan Includes Listed Changes.Rev Withheld, Per 10CFR73.21 BW990042, Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.71999-07-16016 July 1999 Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.7 ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20210A3151999-07-16016 July 1999 Forwards Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.Three Violations Being Treated as Noncited Violations ML20209H2991999-07-16016 July 1999 Withdraws 980529 LAR to Credit Automatic PORV Operation for Mitigation of Inadvertent Safety Injection at Power Accident.Response to NRC 990513 RAI Re LAR Encl BW990040, Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted1999-07-15015 July 1999 Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217P6171999-10-21021 October 1999 Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) ML20217M4361999-10-19019 October 1999 Forwards Rev 46 to Braidwood Station Security Plan, IAW 10CFR50.4(b)(4).Description of Changes,Listed.Encl Withheld Per 10CFR73.21 ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20211Q9011999-09-0808 September 1999 Advises That Us Postal Service Mailing Address Has Changed for Braidwood Station.New Address Listed ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) BW990053, Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 21999-08-13013 August 1999 Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 2 BW990052, Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station1999-08-12012 August 1999 Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station 05000454/LER-1998-008, Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER1999-08-12012 August 1999 Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes BW990049, Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle1999-08-0404 August 1999 Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210K0771999-07-30030 July 1999 Submits 30-day Rept Re Discovery of ECCS Evaluation Model Error for Byron & Braidwood Stations,As Required by 10CFR50.46 ML20210J8951999-07-29029 July 1999 Submits Other Actions,As Described,To Be Taken for Valves to Resolve Potential Pressure Locking Concerns,In Light of Extended Period for Valve Bonnet Natural Depressurization,In Response to GL 95-07, Pressure Locking & Thermal.. BW990045, Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr1999-07-28028 July 1999 Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr ML20210E2151999-07-23023 July 1999 Forwards Byron Unit 1 B1R09 ISI Summary Rept Spring 1999 Outage,980309-990424, in Compliance with Requirements of Article IWA-6000, Records & Repts of Section XI of ASME & P&PV,1989 Edition ML20216D3781999-07-21021 July 1999 Forwards Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR on ITS Format & W(Z) Function, to Account for Error That W Discovered in Computer Code Used to Calculate PCT During LBLOCA ML20216D7061999-07-19019 July 1999 Forwards Rev 45 to Braidwood Station Security Plan,Iaw 10CFR50.4(b)(4).Plan Includes Listed Changes.Rev Withheld, Per 10CFR73.21 ML20209H2991999-07-16016 July 1999 Withdraws 980529 LAR to Credit Automatic PORV Operation for Mitigation of Inadvertent Safety Injection at Power Accident.Response to NRC 990513 RAI Re LAR Encl BW990042, Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.71999-07-16016 July 1999 Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.7 BW990040, Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted1999-07-15015 July 1999 Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted ML20207H7501999-07-12012 July 1999 Forwards Revised Pressure Temp Limits Rept, for Byron Station,Units 1 & 2.Revised Pressurized Thermal Shock Evaluations,Surveillance Capsule Rept & Credibility Repts, Also Encl ML20209G1391999-07-0909 July 1999 Forwards Results of SG Tube Insps Performed During Byron Station,Unit 1,Cycle 9 Refueling Outage within 12 Months Following Completion of Insps ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20196G2161999-06-25025 June 1999 Forwards for NRC Region III Emergency Preparedness Inspector,Two Copies of Comed Emergency Preparedness Exercise Manual for 1999 Byron Station Annual Exercise. Exercise Is Scheduled for 990825.Without Encls ML20209D4861999-06-17017 June 1999 Informs That R Heinen,License OP-30953-1 & a Snow,License SOP-30212-3,no Longer Require License at Byron Station 05000456/LER-1998-004, Forwards LER 98-004-01,IAW 10CFR50.73(a)(2)(i)(B). LER 98-004 Included Commitment to Transmit Supplemental Rept by 990628,due to on-going Evaluations1999-06-16016 June 1999 Forwards LER 98-004-01,IAW 10CFR50.73(a)(2)(i)(B). LER 98-004 Included Commitment to Transmit Supplemental Rept by 990628,due to on-going Evaluations 05000457/LER-1998-003, Forwards LER 98-003-00 Re Unit 2 Reactor Trip.Actions & Associated Action Tracking Number That Braidwood Station Is Committed to Implement in Response to LER Described Below1999-06-16016 June 1999 Forwards LER 98-003-00 Re Unit 2 Reactor Trip.Actions & Associated Action Tracking Number That Braidwood Station Is Committed to Implement in Response to LER Described Below 05000456/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed1999-06-15015 June 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed BW990028, Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.51999-06-10010 June 1999 Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.5 05000454/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed1999-06-0808 June 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed ML20195E3451999-06-0707 June 1999 Forwards 3.5 Inch Computer Diskette Containing Revised File Format for Annual Dose Rept for 1998,per 990520 Telcon Request from Nrc.Each Station Data Is Preceded by Header Record,Which Provides Info Necessary to Identify Data ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs ML20211M1611999-05-28028 May 1999 Discusses 990527 Meeting with Comed Re Safety Culture & Overtime Control at Byron Nuclear Plant from Videoconference Location at NRC Headquarters.Requests That Aggressive Actions Be Taken to Ensure That Comed Meets Expectations ML20207D5261999-05-26026 May 1999 Forwards Response to NRC 990318 RAI Concerning Alleged Chilling Effect at Byron Station.Attachment Contains Responses to NRC 12 Questions ML20195C7911999-05-25025 May 1999 Forwards Revised COLR for Byron Unit 2,IAW 10CFR50.59.Rev Accounts for Planned Increase of Reactor Coolant Full Power Average Operating Temp from 581 F to 583 F ML20211M1781999-05-25025 May 1999 Summarizes Concerns with Chilling Effect & Overtime Abuses at Commonwealth Edison,Byron Station.Request That Ltr Be Made Part of Permanent Record of 990527 Meeting 05000457/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Listed1999-05-21021 May 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Listed 05000454/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed1999-05-21021 May 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed ML20195B2301999-05-19019 May 1999 Requests Approval of Proposed Changes to QA Topical Rept CE-1-A,rev 66a.Attachment a Describes Changes,Reason for Change & Basis for Concluding That Revised QAP Incorporating Proposed Changes Continues to Satisfy 10CFR50AppB ML20207E9831999-05-18018 May 1999 Forwards Copy of Commonwealth Edison Co EP Exercise Evaluation Objectives for 1999 Byron Station Annual EP Exercise,Which Will Be Conducted on 990825.Without Encl ML20206T3351999-05-17017 May 1999 Provides Written follow-up of Request for NOED Re Extension of Shutdown Requirement of TS Limiting Condition for Operation 3.0.3.Page 9 of 9 of Incoming Submittal Not Included ML20206N7861999-05-14014 May 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Braidwood Station. Rept Contains Info Associated with Stations Radiological Environ & Meteorological Monitoring Programs ML20206Q8521999-05-13013 May 1999 Submits Rept on Numbers of Tubes Plugged or Repaired During SG Inservice Insp Activities Conducted During Plant Seventh Refueling outage,A2R07,per TS 5.6.9 ML20206N8551999-05-11011 May 1999 Forwards 1998 Annual Radioactive Environ Operating Rept for Byron Station. Rept Includes Summary of Radiological Liquid & Gaseous Effluents & Solid Waste Released from Site ML20210C7221999-05-0303 May 1999 Forwards Initial License Exam Matls for Review & Approval. Exam Scheduled for Wk of 990607 ML20206F5381999-04-30030 April 1999 Forwards Magnetic Tape Containing Annual Dose Repts for 1998 for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR20.2206(c).Without Magnetic Tape ML20206U3351999-04-30030 April 1999 Forwards Evaluation of Matter Described in Re Byron Station.Concludes That Use of Overtime at Byron Station Was Controlled IAW Administrative Requirements & Mgt Expectations Established to Meet Overtime Requirement of TS 1999-09-08
[Table view] |
Text
I~ l commanum w.c company p_ w 1400 Opm Place Downers Grm c. IL 60515 5'O1 I
r
! I April 20,1999 l
l United States Nuclear Regulatory Commission ATTN: Document Control Desk l Washington, D.C. 20555-0001 Braidwood Station, Units 1 and 2 l Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 i
Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF 66 NRC Docket Nos. STN 50-454 and STN 50-455 ;
Subject:
Response to Request for Additional Information Steam Generator Tube Rupture Analysis for Byron Station, Unit 2, and l
Braidwood Station, Unit 2
References:
(1) NRC letter, " Revised Steam Generator Tube Rupture Analysis -
Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, dated January 28,1998.
(2) NRC letter, " Revised Steam Generator Tube Rupture Analysis -
Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, dated March 11,1998.
(3) Letter from D. R. Helwig (Comed) to U.S. NRC, " Revised Steam GeneratorTube Rupture Analysis Dose Evaluations for Byron and Braidwood Stations Unit 2," dated April 13,1998.
The safety evaluation for the revised Steam Generator Tube Rupture (SGTR) analysis for Byron Station, Unit 1, and Braidwood Station, Unit 1, was issued by the NRC in a letter dated J&nuary 28,1998 (Reference 1), as supplemented by a letter dated March 11,1998 (Reference 2). Reference 3 provided information to the NRC in order to complete the SGTR dose evaluations for Byron Station, Unit 2, and Braidwood Station, l Unit 2. /
l In a telephone conference held between representatives of Commonwealth Edison (Comed) Company and the NRC on December 3,1998, additional information was requested regarding the " Revised Steam Generator Tube Rupture Analysis" for Byron jj Station, Unit 2 and Braidwood Station, Unit 2. In a follow-up telephone conference held -
between representatives of ComF.d and the NRC on February 11,1999, the additional information was discussed and the issues ref;ected in the NRC requests were resolved.
The additionalinformation and subsequent resolution of the issues discussed during the February 11,1999, telephone conference are documented in the attachment.
~
9904270099 DR 990420 p ADOCK 05000454 PDR A Unicom company
April 20,1999 U. S. Nuclear Regulatory Commission Page 2 u 5 Should you have any questions concerning this letter, please contact Mr. J. A. Bauer at (630) 663-7287.
Respectfully, .
r R.' M. K Vice President - Regulatory Services Attachment cc: Regional Administrator- NRC Region lil NRC Senior Resident inspector- Braidwood Station NRC Senior Resident inspector- Byron Station l
'l L
a .
, , Attachment Response to Request for Additional Information l Revised Steam Generator Tube Rupture (SGTR) Analysis l Byron Station, Unit 2, and Braidwood Station, Unit 2
]
I i
Reauest 1 Section 4 of Nuclear Fuel Services Report, NFSR-0114, Revision 0, " Revised Steam - i Generator Tube Rupture Analysis for Byron /Braidwood," dated November 1996, states i that the methodology used in Commonwealth Edison (Comed) Company Report,
" Steam Generator Tube Rupture Analysis for Byron and Braidwood Plants, Revision 1,"
dated February 1990, to calculate offsite dose, is consistent with the methodology used in WCAP-10698-P-A, Supplement 1," Evaluation of Offsite Radiation Doses for a Steam Generator Tube Rupture Accident," dated March 1986. A review of the two methodologies identified that the WCAP offsite dose analysis considers steam release through the ruptured steam generator (SG) power operated relief valve (PORV) for the 2 to 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period after the SGTR event for the purpose of depressurizing the reactor coolant system (RCS) to enable use of the Residual Heat Removal (RHR) system.
These releases are substantialin quantity. The 1990 Comed analysis does not consider this release. Explain this inconsistency.
Response
We acknowledge this difference in the two methodologies. When we previously stated that the Comed methodology was " consistent" with the Westinghouse methodology, it was not meant to imply that the two methods were identical. During plant cooldown, the Byron Station and Braidwood Station Emergency Operating Procedures caution the operators not to release steam from the ruptured SG if there is a concem with SG overfill or with meeting 10 CFR 20 limits. Byron Station and Braidwood Station Emergency Procedure ES-3.3, " Post-SGTR Cooldown Using Steam Dump," has CAUTION statements that specifically state, " Steam should NQT be released from any ruptured SG if water may exist in its steamline," and "An offsite dose evaluation should be' completed prior to using this procedure to ensure 10 CFR 20 limits are NOT exceeded." Since the ruptured SG will not be used to depressurize the plant, the Comed methodology does not consider steam release from the ruptured SG, after the associated PORV has been isolated, in the offsite dose calculation.
In addition, the Comed offsite dose calculation methodology does not consider the steam release from the intact SGs during the two to eight hour RCS cooldown period, because of the small contribution to the offsite dose. However, to be consistent with the methodology in WCAP 10698-P-A Supplement 1, Comed will incorporate the steam release from the intact SG, during the two to eight hour RCS cooldown period, into the SGTR offsite dose calculation the next time the analysis is performed.
1
e 4
- Reauest 2 Provide the values for steam release from the ruptured and intact SGs during an SGTR event, including the two to eight hour period during RCS cooldown.
Response
The amount of steam release following a SGTR event is provided in Table 1. It should be noted that the ruptured SG PORV is isolated at 1715 seconds after event initiation.
Therefore, although RCS depressurization termination and the associated break flow occur at a later time (i.e., 3763 seconds), there is no steam release from the ruptured !
l SG after 1715 seconds. Table 1 also gives the steam release values from the intact SGs from the point of RCS depressurization termination to two hours into the event '
(i.e., from 3763 seconds to 7200 seconds), and during the two to eight hour cooldown period.
! Reauest 3 i l
1 l- Table 7, " Sequence of Events," of report NFSR-0114 indicates that ruptured SG tube I
flow continues until 3763 seconds following the tube rupture event, at which point the RCS depressurization is terminated. However, Figure 15 of the same report appears to indicate that ruptured SG tube flow continues until approximately 4200 seconds into the event. Explain this apparent inconsistency. !
Response
. Table 7 of NFSR-0114 shows that RCS depressurization termination occurs 3763 l seconds into the evert at which time the differential pressure (i.e., primary side to secondary side) across the ruptured SG tube is equalized and break flow is terminated. ;
l Figure 15 of NFSR-0114 indicates that ruptured tube break flow initially goes to "O lbm/sec" at 3763 seconds. However, due to RCS pressure perturbations while equalizing charging and letdown flow, ruptured tube break flow is momenta,ity re- ;
initiated twice more before ending the scenario at 4200 seconds.
Reauest 4 i
It appears that the Comed April 13,1998, submittal contains incorrect primary coolant activity levels for the SGTR accident-initiated spike case. The Comed primary coolant activity values appear to be approximately 4 times too large. The correct values should be provided.
Response
it is recognized that the initial primary coolant activity levels used for the SGTR accident-
- initiated spike case are higher (i.e., more conservative) than the steady state primary coolant activity levels allowed by Technical Specifications for continued operation, (i.e.,' 1 pCi/gm dose equivalent iodine-131 concentration). The values used for the
. SGTR accident-initiated spike case in the Comed April 13,1993, submittal, were taken from the Updated Final Safety Analysis Report (UFSAR) Table 12.2-2, " Reactor Coolant 2
e
F )
l
.) -
l i
i
, Sotapes for Shielding Design." The SGTR accident-initiated spike case should assur"^
equilibrium iodine concentration for continued full power operation in combination with l an assumed accident-initiated iodine spike. The activity levels in UFSAR Table 12.2-2 are conservative with respect to equilibrium iodine concentration values for continued full power operation. The activity levels for the individual iodine isotopes, corresponding to the Technical Specification primary coolant activity limit of 1 Ci/gm dose equivalent j l '
lodine-131 concentration, will be used the next time the analysis is performed and l
associated UFSAR changes will be made.
Table 1 Steam Release Following a Steam Generator Tube Rupture Event intact SG Ruptured SG Event Steam Release Steam Release (Ibm) (Ibm)
Event Initiation to Ruptured SG Power Operated Relief Valve l ! solation and Break Flow Termination (0 - 1715 seconds; PORV isolated) --
9.19E4 1 (0 - 3763 seconds; Break Flow 1.51 E5 --
Terminated)
Break Flow Termination to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> (3763 - 7200 seconds) 3.64E5 --
Plant Depressurization - Time to put l
the RHR System in Service >
I (2 - 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />) 1.18E6 --
l l
3