r
.
.
fey 28, 1999
Mr. Oliver D. Kingsley
President Nuclear Generation Group
-
Commonwealth Edison Company
ATTN: Regulatory Services
Executive Towers West 111
1400 Opus Place, Suite 500
Downers Grove,IL 60515
SUBJECT:
NRC INSPECTION REPORT 50-454/99007(DRS); 50-455/99007(DRS)
Dear Mr. Kingsley:
On May 20,1999, the NRC completed an inspection of your fire protection program at the Byron
Nuclear Power Station, Units 1 and 2. The enclosed report presents the results of the
inspection.
Areas examined within your fire protection program are identified in the report. Within those
areas, the inspection consisted of a selective examination of procedures and representative
records, interviews with personnel, and observation of activities in progress. The objective of
the inspection effort was to determine whether activities authorized by the license were
conducted safely and in accordance with NRC requirements. Based on the results of this
inspection, no violations of NRC requirements were identified.
Our inspection concluded that your fire protection program was effective. Fire protection
equipment was well maintained and transient combustibles were well controlled, in addition, fire
protection and station personnel were pro-active in identifying problems with fire protection
surveillance procedures.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and the
enclosed report will be placed in the NRC Public Document Room.
\\
L
.
i
9906070073 990528
l
ADOCK 05000454
I
G
i
E
,
.
l
.
!
O. Kingsley
-2-
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
original /s/ John A. Grobe for
,
Ronald N. Gardner, Chief
Electrical Engineering Branch
Division of Reactor Safety
Docket Nos. 50-454; 50-455
Enclosure: Inspection Report 50-454/99007(DRS);-
50-455/99007(DRS)
cc w/ encl:
D. Helwig, Senior Vice President
H. Stanley, PWR Vice President
C. Crane, BWR Vice President
R. Krich, Vice President, Regulatory Services
DCD - Licensing
W. Levis, Site Vice President
R. Lopriore, Station Manager
B. Adams, Regulatory Assurance Manager
M. Aguilar, Assistant Attomey General
State Liaison Officer
i
State Liaison Officer, State of Wisconsin
Chairman, Illinois Commerce Commission
j
Distribution:
SAR (E-Mail)
RPC (E-Mail)
Project Mgr., NRR w/enci
J Caldwell, Rlli w/enci
B. Clayton, Rlli w/ encl
SRI Byron w/ encl
DRP w/ encl
DRS w/ encl
Rlll PRR w/ encl
PUBLIC IE-01 w/enci
Docket File w/enci
GREENS
W{}(j j fj
IEO (E-Mail)
DOCDESK (E-Mail)
DOCUMENT NAME: G:DRS\\BYR99007.wpd
>
v.
c.w.. m
ooe-au
e c
inoui.n.cw.av,ncio.u
5 . em
.Monu.ocio
ir .
3 14 Rill fe[
Rl!!
l
OFFICE
Rill
lC
Rlli
NAME
DChyu:sd tv0
MJordan I-A) // ;RG(d3F
DATE
05/X/99
05/11/99
i /
\\ 05/W95
05/ /99
OFFICIAL RECCRD COPY