IR 05000424/1985047

From kanterella
Jump to navigation Jump to search
Insp Repts 50-424/85-47 & 50-425/85-34 on 850930-1004.No Violation or Deviation Noted.Major Areas Inspected:Steam Generator Feedwater Ring J-nozzle Mods & Const Ndes
ML20205F714
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/22/1985
From: Blake J, Newsome R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20205F712 List:
References
50-424-85-47, 50-425-85-34, NUDOCS 8511130003
Download: ML20205F714 (15)


Text

4

-

@ CEGO UNITED tTTATQS

  1. o

NUCLEAR REGULATORY OO.MMISSION

[ o REGION 11

f j 101 MARIETTA STREET, * ~t ATLANTA. GEORGI A 3o3%

s N

%, p#

  • ..+

Report Nos.: 50-424/85-47 and 50-425/85-34 Licensee: Georgia Power Company P. O. Box 4545 Atlanta, GA 30302 Docket Nos.: 50-424 and 50-425 Licer.se Nos . . CPPR-108 and CPPR-109 Facility Name: Vogtle 1 and 2 Inspection Co "" ~e tember 30 - October 4, 1935 Inspecto : ' some

/o!t 26 Date Signed Approve by: /0/ 2b &[ E a~ke, Section Chief Date Signed E i eering Branch D v sion of Reactor Safety SUMMARY Scope: This routine, unannounced inspection involved 37 inspector-hours on site in the areas of steam generator feedwater ring J-nozzle modifications and construction nondestructive examinations including review of procedures, observation of work, and data revie ,

Results: No violations or deviations were identified.

l

l

,

l

.

8511130003 PDR 851024ADOCK 05000424 PDR G

J .

I REPORT DETAILS

. Persons Contacted Licensee Employees

  • E. D. Groover, QA site Manager
  • C. R. Brewer, Assistant QC Manager
  • T. Weatherspoon, Assistant QC Manager
  • H. W. Swain, Mechanical QC Shift Supervisor
  • G. A. McCarley, Project Compliance Coordinator Other licensee employees contacted included construction craftsmen, engineers, technicians, operators, mechanics, security force members, and office personne Other Organizations J. Steel, Pullman Power Projects (PPP), QA Manaaer D. Wieland, Westinghouse Electric, Site Manager B. Reed, Westine; house Electric, Welding Supervisor NRC Resident Inspector J. F. Rogge, Senior Resident Inspector, Operations
  • Attended exit interview Exit Interview The inspection scope and findings were summarized on October 4,1985, with those persons indicated in paragraph 1 above. The inspector described the areas inspected and discussed in detail the inspection finding No dissenting comments were received from the licensee. The licensee did not iaentify as proprietary any of the materials provided to or reviewed by the inspector during this inspectio . Licensee Action on Previous Enforcement Matters This subject was not addressed in the inspectio . Unresolved Items Unresolved items were not identified during the inspection.

.

i

. , - . . .

. . . .. - _

.

-

-

. . .

. ~

l

2 l Independent Inspection

, Steam Generator Feedwater Ring J-Nozzles Modification - Units 1 and 2 (1) During this inspection, the inspector reviewed procedures, j

~

verified examinations, and reviewed records associated with the steam generator modification being accomplished by Westinghouse U Electric Corporation g) on the Unit 1 and 2 steam generator .The modification is .being accomplished as authorized by W Field Change Notice (FCN) GAEM1060 The FCN authorizes replacement of existing carbon steel J-nozzles i in the feedwater- distribution ring with Inconel J-nozzles for

, improved erosion-corrosion resistance. J-nozzle material conforms i

to ASME SB-167 NiCrFe alloy 600 seamless pip ~

There are 30 J-nozzles in each of the steam generators. The field modification

, is being accomplished per detailed installation' instructions i provided in Procedure SSS-2.7.2-GEN 33 Rev. 3, J-Nozzle Replace-men The feedwater distribution ring J nozzle assembly is classified Safety Class I The feedwater ring assembly is not part of the pressure vessel boundar (2) The inspector reviewed the below listed W procedures for technical

content and process control adequacy.

I Procedure N Title SSS-2.7.2-GEN-33 J-Nozzle Replacement SSS-2.7.2-GEN-40 Preparations and Prerequisites for

,

Secondary Side Internal Work

WEP310 (Rev. A)' Weld Filler Material Control for Product Applications

,

, NDE-110 Visual'Examiiation i

' Procedure NDE-110 was also reviewed to - determine . whether it contained sufficient -instructions to assure that the visual

examination ~ parameters' were specified- and ' controlled within the

.

limits permitted by the ' applicable- code or ' controlling F specifications.

.(3) The inspector entered ' steam generator. number. 2 in Unit I and examined the J nazzle ' weld preparation ~ area for nozzle- #9,- the

weld. tacks'for fitup of. nozzles'5, 10, and 15, and the completed, but-.as yet cleaned, final welds of. several1 0ther nozzles. This

' entry was made in. order.to assess-the quality.of the welding ~being accomplished and also to determine'if the adjacent component items

, in:the work area were-being properly-protected from damage.

i- ,

_ , - - . , , , - . . . , ,

.. . _ _ . -. . . - _ _ . _ - .-

-

. .

,

-

(4) The inspector entered steam generator number 4 in Unit I after all

, modifications and cleanup was completed in order to evaluate the i

quality of the completed and visually accepted J-nozzle welding and to assess the adequacy of the post modification component cleanliness.

'

-(5) The inspector reviewed the following: replacement J-nozzle

' material certification records identified as #727-729 heat #NX3618 and 733/734 heat #NX3646; material certification records for welding rod identified as batch #4720 type SFA 5.11: welding process sheet (WPS) .1910 Rev. D and Process Qualification Record (PQR) 120; certification records for six of the welders involved with the replacements; and certification records for the Quality Control inspector.who was conducting the visual examination of the welds.

, (6) At 'the completion of this inspection period all of the Unit 1

,

steam generator J-nozzle modifications had been completed, however

,

modifications to the Unit 2 steam generators had not yet starte Within the areas examined, no violations or deviations were identifie . Construction Nondestructive Examination (NDE)

The inspector reviewed procedures, conducted examinations, observed examinations, and reviewed records for various NDE methods, as indicated in the follow ~ing sub paragraphs, to determine whether NDE activities were being accomplished in accordance with the- applicable code and regulatory

'

requirements. The applicable code is the American Society of Mechanical Engineers Boiler and Pressure Vessel (ASME B&PV) Code,Section III,1977

Edition, Winter 1977 Addenda. The nondestructive examinations were being

conducted by Pullman Power Products (PPP), Nuclear Installation Services Company (NISCO), and Pullman /Kenith-Fortson (P/K-F) for the licensee, ,

Georgia Power Company (GPC), who also conducts NDE as a contractor l surveillance ite Visual Examination Procedure Review / Work Observation / Record Review (57050)

.(1) Procedure Review (Units 1 and 2)

. ' The inspector .reviewad -the below listed procedures to ascertain whether they were issued and qualified in eccordance with the '

licensee's ' quality assurance program. The procedures were also reviewed to determine' whether they contained sufficient

'

instructions .to assure that the following parameters were specified and controlled within' the limits permitted by the applicable code, standard, or any additional specification .j 1  !

4

. - . . _ . - , _

,. . , . . . - - -~ .., c..., .~ , . , , _ _ , . , . .m, %,-...,,,.m.,

_- . . . . . ~ . . . . - - . . . - .

-

. .

i

requirement: method - direct visual, remote visual or translucent visual; application - hydrostatic testing, fabrication procedure, visual examination of welds, leak testing, etc.; how visual

-

examination i s to be performed; type of surface condition i

available; method or tool for surface preparation, if any; whether F direct or remote viewing is used; special illumination,

,- instruments, or equipment to be used, if any; sequence of performing examination, when applicable; data to be tabulated, if any; acceptance criteria is specified and consistent with the applicable code section or controlling specification; and report form completio Procedure Title Revision (PPP) X-11 Visual Examination - General 5-31-82

'

(PPP) X-18 Field Welding Inspection 3-18-85 (NISCO) ES-100-5 Visual Inspection of Welds 3-9-83 (Rev. c)

, (P/K-F) 'JP-1 Welding Inspection 6-18-85 (R11c)

(2) Work Observation (Unit 1)

The inspector observed visual examinations being performed on the g welds' listed below. These observations were made to: determine

_

whether the applicable' drawing, instructions or travelers clearly

'

,

'

specify the test procedure to be used and that a copy of the procedure is available in the area where the work is being i performed; identify for record review the personnel performing the examination .and ascertain whether they are qualified 'to perform s the assigned task; determine whether the required tools and

) examination aids (as specified in -the examination procedure) are available at the work location; determine'.whether the specific areas, locations and extent of examination .are clearly defined; i determine whether the test attributes . are as' specified in the applicable ' test procedure; ascertain whether. the defects are

'

evaluated in accordance with 'the procedure requirements, correct acceptance criteria' is used and the inspection results are reported in a. prescribed manner.

,

i Examiner- Drawing N Weld'I.D.

t PPP 1K4-1204-078-02 244-W-104'

PPP 1K4-1301-128-05 128-W-42C-

'

PPP IK4-1301-128-0 W-42D PPP 1K4-1301-128-05 128-W-41 i P/K-F: -1-1553-N7-001,002,003 1 thru 18,~on 4- -item DS-A081103-45-GPC V2-12.15-351-H004 4 welds, pipe' support assembly

.

< , +. , , ..w,.,,, ..-,m.,- , , - . . . ~ w n .. . - - . , , . , - . , . , - - . ..

-

. .

,

(3) Records Review (Unit 1)

(a) The inspector reviewed the below listed visual examination personnel qualification records to ascertain whether these records properly reflect the employer's name, person certified, activity qualified to perform, effective period of certification, signature of employer's designated representative, basis used for certification, and annual visual acuity, color vision examination and periodic recertificatio Visual Examiners PPP NISCO P/K-F GPC CWD GRG TAB CJB TMW TJP LHC WKB KWL KJR JCE RTC T0A JGA HWH RLH BFB DJS GWJ KBM BBC EIN IMP KLH JWP TBS RWS JWV RAW (b) The inspector reviewed tl.e examination reports for the below listed Unit I welds to determine compliance with procedure requirements for examination record PPP Drawing N Weld N K3-1208-023-01 023-W-185 023-W-178 023-W-122 023-W-172 023-W-199 023-W-01A 023-W-188 1K4-1204-039-02 125-W-07 043-W-01 043-W-05A 043-W-05 125-W-08 043-W-03 L

-

.

IK4-1204-024-03 024-W-113 1K3-1205-003-02 003-W-19B 1K3-1205-007-02 007-W-12E 1K3-1205-008-01 008-W-02C 1K3-1208-145-01 145-W-028

- 1K4-1208-015-02 015-W-101A NISCO Bottom Mounted Instrumentation Tubing Line Weld A-9 3&4 B-3 3&4 L-11 1 M-7 1, 3 & 4 A-11 1&2 P/K-F Support N Drawing N Weld A112119-80 AX2011W-159 (R4) IC-1&2 2C - 1 & 2 3C - 1 & 2 4C - 1 & 2 5J - 1, 2, 3, & 4 6P - 1, 2, 3, & 4 A112104-176 AX2D11W127 (RIO) 36L - 1, 2, & 3 37L - 1, 2, & 3 38L - 1, 2, & 3 52E - 1 & 2 535 - 1, 2, & 3 54S - 1, 2, & 3 11J - 1, 2, & 3 A113109-128 AX2011W131 (R10) 1E - 1 3E - 1 5C-1&2 6C - 1 & 2 7C - 1 & ?.

8C - 1 & 2 9P - 1 GPC Hanger No. V2-1215-351-H004 4 welds

.- . . . . = -.. . ..

_ ;

.- . .

,

L (c) The inspector performed verification visual examinations on the below listed randomly selected completed Unit I welds using ' measuring devices provided oy the Nuclear Regulatory Commission's Region II office. -The examinations were performea to~ ascertain whether the correct acceptance criteria was used and that the inspection results were 1- reported in a prescribed manner consistent with controlling specifications and procedure Weld Identification Drawing N W-101 1K5-1301-002-01 106-W-101 1K5-1301-002-01

. 106-W-102 1K5-1301-002-01 035-W-07A 1V4-1501-035

!~

128-W-42 1K4-1301-128-05

, 021-W-08 1K4-1204-021 While conducting the examination of weld 106-W-102 drawing

'

number 1K5-1301-002-01, theLinspector discovered a small weld spatter beid and a minor arc strike at the six o' clock ~

position on valve number BT738 adjacent to the weld. Final visual-examination of the weld had been conducted by PPP and

the arc strike and weld spatter appeared to. have occurred j

after the final acceptance of the weld. The inspector noted that this appeared to be an isolated incident as none of the '

other welds examined had indications. The inspector informed PPP of the condition and deviation report No. PP-11924 was issuad by PPP to disposition the indications. The inspector has no further questions regarding ~ this matter since the condition appears to have occurred.after final acceptance of

the weid, t.1d was an isolated case, and disposition of the condition was being addressed.

!

. Magnetic Particle Examinatien Procedure Review / Record Review (57070)

(1) Procedure Review Units 1 and 2 The below listed PPP magnetic particle NDE procedures were

,

reviewed by~ the- inspector to ascertain whether essential examination variables are defined and whether these variables are l controlled within the limits specified by the applicable code. and

>

' other' specification requirements, s

. Latest Procedure N Title Rev. Date

! IX-MT-3-W77 -Magnetic Particle Examination 1-2-85 Procedure Dry Powder Continuous-

, Method Yoke Technique l

.

f

. . . _ . _ . . . .-- -

- _ . . . . - _ - . . -_ _ _. . ,_ _ _ , _ _ . . _ ,

-l

'1

. . l

'

!

8

IX-MT-1-W77 Magnetic Particle Examination 1-2-85 Procedure ' Dry Powder Continuous Prod Method Winter 1977 Addenda ,

.In addition to the above review, the procedures were analyzed in

. the area ' of . technical content relative to magnetizing method, surface preparation, magnetic particle contrast, surface temperature, light intensity, coverage, prod spacing, magnetizing current, yoke pole spacing and acceptance criteri (2) Re' cord Review Units 1 and 2 A review'of qualification records, as listed below, for magnetic particle examination- personnel was accomplished to determine-whether the qualification records properly reflect the employer's name, person 1 certified, activity qualified to perform, level of qualification,- effective period of ' certification, signature of employer's designated representative, basis used for certifi-cation, annual visual acuity, color vision examination, and periodic recertificatio Magnetic Particle Examiners PPP GPC GLS CJB JCC WKB JEH -RTC IMP Ultrasor.ic Examination Procedure-Review / Record Review (57080)

I

_(1) Procedure Rev'iew1 Units'1 and 2

,

The below . listed ultrasonic examination procedures were reviewed

.

to ascertain whether'the procedure contains sufficient information to assure that all essential parameters are specified and controlled within the limits permitted by the applicable code or specification requirement Latest Procedure N Title Rev. Date PPP X-20- Ultrasonic Thickness Measure- 1-9-85 ment of Materials

'

GPC QC-T-09- Ultrasonic Inspection 10-11-84 (R4)

GPC QC-T-13 Thickness Measurement 4-9-85 (R2)

,

'

' %e g -

r- ==-e-s -

t 4 - e y- -w e w r m- v'-e e- c- P y- au, ww sy

-

. .

NISCO Procedure for Ultrasonic Rev. C 100-4-1 Examination 2-1-85 In addition to the review above, the procedures were analyzed in the areas of technical content relative to type of apparatus to be used including frequency range as well as linearity and signal attenuation accuracy requirements; extent of coverage (beam angles, scanning surface, scanning rate and directions) as well as the scanning technique; calibration requirements, methods and frequency including the type, size, geometry, and material of calibration block; as well as location and size of calibration reflectors within t.e block; the sizes and frequencies of search units specified and tht.t they are consistent with applicable requirements;-beam angle or angles are specified and that they are consistent with the applicable requirements; methods of compensation for the distance traversed by the ultrasonic beam as it passes through the material including distance - amplitude correction and transfer mechanism; reference reflectors for accomplishing transfer and the frequency of use of transfer mechanisms; examination reference level for monitoring discontinuities and the scanning gain setting is specified and that these values are in accordance with applicable requirements; the methods of demonstrating penetration and coverage are established; the levels or limits for evaluation and recording of indications are specified and are in accordance with applicable requirements; the method of recording significant indications and that the reporting requirements are in accordance with applicable requirements; and the acceptance limits are in accordance with the applicable requirement (2) Records Review Units 1 and 2 A review of qualification records, as listed below, for ultrasonic examination personnel was accomplished to determine whether the qualification records properly reflect the employer's na. , person certified, activity qualified to perform, level of qualification, effective period of certification, signature of enployer's designated representative, basis used for certification, annual visual acuity, color vision examination, and periodic recertificatio Ultrasonic Examiners PPP GPC JCC (Thickness Only) JWV NW (Thickness Only)

L .

_ . - . . . - . , .. - . . _ ,

. ~ - ..

I

-

. .

_

< .

.

Liquid Penetrant Examination Procedure Review / Records Review (57060)

~

.d.

!-

_(1) Procedure Review Units 1 and 2

_

The below listed PPP liquid penetrant NDE procedure was reviewed

_ by the inspector to ascertain whether essential examination-l variables are defined and whether these variables are controlled j"- within ' the limits : specified by the applicable Code and other specification requirements.

'

Latest Procedure N Title Rev. Date i PPP IX-PT-1-W77 Penetrant Examination 12-3-84 Procedure to ASME Section III (

Winter'1977 Addenda

}

4 In addition to the review above, the procedure was reviewed in the

area of technical content relative to specified test method

'

requirements; brand names and specific types -(number or letter

'

designation, if available) of penetrant, penetrant remover, emulsifier and developer; penetrant materials used are . analyzed for -sulfur and total halogens; methods for acceptable pre-examination of surface preparation and surface area to be examined is consistent with applicable Code requirements;

~

i

'

establishing a minimum drying . time .following surface cleaning, .

- method of penetrant application and the penetration (dwell) time

are specified; examination surface temperature -is specified; methods for removal of solvent removable penetrant are specified;

), method and time of . surface dying prior to developing are

'

L specified; type of developer is specified; method of developer application and the time : interval between penetrant removal and

.

developer application are . specified; final interpretation is

!

'

- performed -within the ' range of 7-30 minutes after developer application; minimum light intensity at the inspection site is prescribed; technique for evaluation of indications it specified, .

'

acceptance standards are included and these are consistent with applicable Code and specification requirements;" reporting
~ requirements are specified; and procedJre requalification 'is
required when critical element changes are necessary.

!

(2) Records Review 1 Units 1 and 2 j (a) A revie'w of -qualification -records for the liquid penetrant i- examination ~ personnel listed below was accomplished to ,

3 determine whether . the qualification' records reflect. ~ the i

, employee's name, person certified, -activity qualified to-

-

, ' perform, level- of qualification, effective period -of-

.  : cer_ti fi cati on , signature of - employee's designated

,

represen'ative, basis used for certification, annual visual l

s

'

-

. .

.

acuity, color vision examination, and periodic recertifi-catio Liquid Penetrant Examiners PPP NISCO GPC DES GRG CJB CKN TJP WKB GLS KJR IMP JCC JGA NW DJS JEH MLA (Terminated 3-12-85)

JMT (Terminated 2-20-85)

JLR (Terminated 8-10-84)

MLN (Terminated 5-12-84)

KMW (Terminated 11-22-83)

(b) The below listed liquid penetrant material certification records were reviewed to ascertain if the sulfur and halogen content of the materials were within acceptable content requirement Material Batch No Liquid Penetrant 830038, 84H027, 84E058, 83L030 Penetrant Remover 83M069, 84H057, 84C108, 83F017 Developer 84C051, 84J005, 83E014 (c) The inspector reviewed the examination records for the below listed Unit I welds to determine compliance with procedure requirements for examination record Examined By PPP Drawing N Weld N K3-1208-023-01 023-W-122 023-W-199 023-W-01A 023-W-188 1K4-1204-039-02 125-W-07 043-W-01 043-W-05A 043-W-05 .

125-W-08

-

. .

12

043-W-03 IK4-1204-024-03 024-W-113 1K3-1205-003-02 003-W-19B 1K3-1205-007-02 007-W-12E 1K3-1205-008-01 008-W-02C 1K3-1208-145-01 145-W-028 IK4-1208-015-02 015-W-101A Examined By NISCO Bottom Mounted Instrumentation Tubing - DWG. 1X6AB08-58 Line N Weld N F1 4

.D3 4 B3 4 C5 4 D12 6 L13 6 C5 6 H2 6 Radiographic Examination Procedure Review / Record Review (57090)

(1) Procedure Review Units 1 and 2 The below listed PPP and GPC radiographic procedures were reviewed to ascertain whether they had been issued and approved in accordance with the licensee's/ contractor's QA program and to ascertain whether the examination variables were defined and whether these variables are controlled within the limits specified by the applicable Code or specification requirement Latest Procedure N Title Rev. Oate PPP IX-RT-1-W77 Radiographic Procedure 5-2-85 IR-192 Butt Welded Pipe Winter 1977 Addenda GPC QT-T-07 Radiography Inspection 10-25-84 (R3)

In addition to the review above, the procedures were analyzed in the area of technical content relative to material and weld surface condition requirements, types of material to. be radiographed, material thickness range, type of radiation source, film brand or type, minimum source to film distance, blocking or masking technique, type and thickness of intensifying screens and filters, uposure conditions for' procedure qualification,

._ . .

-

. .

radiographic film processing requirements, quality of radiographs, film density limits for single and composite viewing, system of radiograph identification, use of location markers, record for shoving film and source location with reference to the part being radiographed, use of intensifying screens, methods of testing for backscatter, material type and thickness restrictions for isotope radiography, geometrical unsharpness limitations, selection and use of penetrameters, radiographic technique requirements for double wall viewing, qualificatior of radiographic procedure, requirements for evaluation and disposition of radiographs, and records requirement (2) Records Review Unit 1 (a) The inspector reviewed the examination records for the bebi listed welds to determine compliance with procedure requirements for examination recc-ds and to determir.e if the disposition of the welds radiographed was in compliance with applicable Code and specification requirement Examined By PPP Drawing N Weld N IK3-1208-023-01 023-W-185 023-W-178 023-W-172 1K4-1204-039-02 125-W-07 043-W-01 043-W-05A 043-W-05 125-W-08 043-W-03 1K4-1204-024-03 024-W-113 Examined By NISCO Bottom Mounted Instrumentation Tubing Penetration N Weld N (b) A review of qualification records for the radiographic examination personnel listed below was accomplished to determine whether the qualification records reflect th employer's name, person certified, activity qualified to perform, level of qualification, effective period of

r

-

.-

certification, signature of employer's designated representatives, basis used for certification, annual visual acuity, color vision examination and periodic recertificatio Radiographers >

PPP P NISCO DES GRG GLS JGA JWB DJS JEH GLC (Terminated 1-14-84)

Uithin the areas excmined, no violations or deviations were identified.

i