05000304/LER-1978-073, Forwards LER 78-073/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 78-073/03L-0
ML19305A119
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 12/14/1978
From: Wandke N
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19305A120 List:
References
NUDOCS 7901040147
Download: ML19305A119 (1)


LER-1978-073, Forwards LER 78-073/03L-0
Event date:
Report date:
3041978073R00 - NRC Website

text

'

Commonwe:lth Edison Zion Generating Station

-/

Shiloh Blvd. & Lake Michigan Zion, Ilknois 60099 Telephone 312/746-2084 December 14, 1978 Mr. James G.

Keppler Regional Director Directorate of Regulatory Operations Region III U.S. Nuclear Regulatory Commission Glen Ellyn, Illinois 60137

Reference:

Zion Generating Station Docket No. 50-304/DPR-48 Technical Specification, Section 6.6.2

Dear Mr. Keppler:

Enclosed please f_nd Reportable Occurrence Report No.

50-304/78-73 for Zion Generating Station.

This report is submitted to you in accordance with the requirements of the Technical Specifications, Section 6. 6. 2.b.( 2) which states that conditions leading to operation in a degraded node permitted by a liniting condition for operation requires a 30 day written report.

Very truly yours, M.

E.

Uandke Superintendent Zion Station

Enclosure:

Reportable Occurrence Report No. 50-304/78-73 1

EC 181978 9

0 0 '7

\\

j 790iO40tU

(

J