A98047, Forwards Revised Scope of One Commitment Contained in Response to NOV

From kanterella
Jump to navigation Jump to search
Forwards Revised Scope of One Commitment Contained in Response to NOV
ML20238F673
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 08/28/1998
From: Starkey R
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
50-295-97-03, 50-295-97-3, 50-304-97-03, 50-304-97-3, ZRA98047, NUDOCS 9809040185
Download: ML20238F673 (2)


Text

,

a Ginunonacahh filimn Company g

Zion Generating Station i

Iol Shiloh Iksutrun!

Zion. I1. G099 2-'97 Tcl 847-762086 l

ZRA98047 August 28,1998 U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention:

Document Control Desk

Subject:

Commonwealth Edison Change to Commitment included in Response to Apparent Violations in NRC Inspection Report Numbers 50-295/304-97003(DRS);

Zion Nuclear Power Station Units I and 2; NRC Docket Numbers 50 295 and 50-304 l

Reference:

1) Letter to J.11. Mueller (Comed) from G. E. Grant (USNRC) dated July 9,1997. NRC Inspection Report 50-295/97003(DRS),50-304/97003(DRS).
2) Letter to USNRC from J. II. Mueller (Comed) dated August 8,1997. Commonwealth Edison Response to Apparent Violations in NRC Inspection Report Numbers 50-295/304-97003(DRS).
3) Letter to A. B. Beach (USNRC) from J. C. Brons (Comed) dated March 30,1998, Applicable Regulations, Disposition of Commitments, and Systems Required Following Permanent Shutdown and Defueling of Zion Units I and 2.

Gentlemen:

In Reference 1, the NRC identified two related apparent violations of NRC requirements. Reference 2 provided the Comed response to the apparent violations and contained several regulatory commitments.

This letter is to revise the scope of one of the commitments contained in Reference 2.

Attachment A provides both the original and revised commitment scope.

I Sincerely,

'f24j M l

R. Starkey i

J Decommissioning plant Manager

.' l Zion Station A

N 0'

Attachment c m, 3

,.4 v v

/

cc: Regional Administrator, USNRC - Region 111 Senior Project Manager, USNRC - NRR Project Directorate 111-2 Senior Resident inspector, Zion Nuclear Station OfTice of Nuclear Facility Safety - IDNS 9009040185 900828 '

PDR ADOCK 05000295 G

PDR A 1:nicum unnpany

a 4

ATTACllMENT A to ZRA98047 Page1of1 Regulaton* Commitments The following table identifies those actions committed to by Comed in this document. Please notify Mr. Robert Godley, Zion Station Regulatory Assurance Manager, of any questions regarding this document or any associated regulatory commitments.

Source Document:

Letter to USNRC from J.11. Mueller (Comed) dated August 8,1997, Commonwealth Edison Response to Apparent Violations in NRC Inspection Report Number 50-295/304-97003(DRS);

Original Commitment Revised Commitment A modification will be installed to Install temporary alteration 98-002 while isolate the Unit 2 VPC from the FHB defueling unit 2 when containment integrity when the wall is down.

This is not intact or the Unit 2 shield wall is not modification will be installed in intact.

refueling outage Z2R15.

Commitment Change Justification:

The temporary alteration and the modification are detcrmined to be equivalent. The change in commitment was evaluated as satisfactory using the Nuclear Energy Institute commitment change methodology as committed to in Reference 3.