ML20198C250

From kanterella
Jump to navigation Jump to search
Forwards Rev 45 to Zion Nuclear Power Station Security Plan, Per Requirements of 10CFR50.4(b)(4).Rev Includes Listed Changes.Licensee Has Concluded That Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld
ML20198C250
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/11/1998
From: Krich R
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9812220024
Download: ML20198C250 (2)


Text

--

Commonwealth Edhon Company 1400 Opus Picce

  1. ~

Docners Grove, 11. (30515 5701

(..,

3AFECUAbNFUa,in -

NO 1 December 11,1998 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Zion Nuclear. Power Station, Units 1 and 2 Facility Operating License Nos. DPR-39 and DPR-48 NRC Docket Nos. 50-295 and 50-304

Subject:

Security Plan for the Zion Nuclear Power Station, Revision 45 in accordance with 10 CFR 50.4(b)(4), enclosed is the signed original and three copies of Revision 45 of the Security Plan for the Zion Nuclear Power Station.

This revision includes the following changes.

Elimination of the requirement for an annual change-out of vital and protected area keys and locks.

Clarification of compensatory measures for the failure or partial failure of the vital area door alarm system.

Adjustment of the minimum security force staffing requirements to be commensurate with the permanently defueled condition of the reactors.

Revision of the secondary power supply for alarm annuciator equipment and non-portable communication equipment.

As required by 10 CFR 50.54(p)(2), we have concluded that these changes do not decrease the safeguards effectiveness of the plan. The changes to the plan are described in Enclosure 1.

SAFEGUARDS INFORMATION I

[ [

J.

E'nclosure 2 C nta ns Safeauards Information Upon Separation This Paae is Decontrolled i

9812220024 981211 PDR ADOCK 0500 g 5t j

1 :-

p.

December 11,1998 s-U.S. Nucl2ar Regulatory. Commission Page 2 i

t g.

i.

L in accordance with 'O CFR 50.54(p)(2), the earliest that these changes to the l

' plan were implemented was on October 14,1998. Therefore, this report is being l

submitted by December 14,1998.

,i

- contains Safeguards Information that must be protected from public disclosure pursuant to 10 CFR 73.21.

If you have any questions about this letter, please contact K. A. Ainger at (630) 663-7350.

[,

Respectfully, I

- R. M.

Vice President - Regulatory Services : Description of Changes, Security Plan for the Zion Nuclear Power Station, Revision 45

, : Security Plan for the Zion Nuclear Power Station, Revision 45 Regional Administrator - NRC Region lli (2 copies of Enclosure 2) cc:

1 l.

d 6

d a

' Contains Safeauards Information Upon Seoaration This Paae is Decontrolled g

(I 3

_ _ _