05000304/LER-1978-022, Forwards LER 78-022/03X-1 Update

From kanterella
Jump to navigation Jump to search
Forwards LER 78-022/03X-1 Update
ML19274D344
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 01/11/1979
From: Wandke N
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19274D345 List:
References
NUDOCS 7901230216
Download: ML19274D344 (1)


LER-1978-022, Forwards LER 78-022/03X-1 Update
Event date:
Report date:
3041978022R00 - NRC Website

text

O C t.,

-@ Oommonwealth Edison Zion Generating Station

,j-Shiloh Blvd. & Lake Michigan Zion. Illinois 60099 Telephone 312/746-2M4 January 11, 1979 Mr. James G. Keppler Regional Director Directorate of Regulatory Operations Region III U. S. Nuclear Regulatory Commission Glen Ellyn, IL 60137

Reference:

Zion Generating Station Docket No. 50-304/DPR-48 Technical Specification, Section 6.6.2

Dear Mr. Keppler:

Enclosed please find updated Reportable Occurrence Report No.

50-304/78-22 for Zion Generating Station.

This report is submitted to you in accordance with the re-quirements of the Technical Specifications, Section 6.6.2.b(2),

which stated that conditions leading to operation in a degraded mode permitted

~~y a limiting condition for operation or plant shutdown required by a limiting condition for operation requires a 30-day written report.

Ve7 truly yours, 4

N. E. Wandke Superintendent Zion Station JRV/vym

Enclosure:

Updated Reportable Occurrence Report No. 50-304/78-22

'_P1979 7901230916

@NO S