05000304/LER-1978-071, Forwards LER 78-071/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 78-071/03L-0
ML20062F842
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 12/08/1978
From: Wandke N
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20062F847 List:
References
NUDOCS 7812210217
Download: ML20062F842 (1)


LER-1978-071, Forwards LER 78-071/03L-0
Event date:
Report date:
3041978071R00 - NRC Website

text

GQL CI:mmonwrith Edison Zion Generating Station Shiloh Blvd. & Lake Michigan Zion, tilinois 60C99 Te!egnone 312/746-2084 Decenber 8, 1978 Mr. James G.

Keppler Regional Director Directorate cf Regulatory Operations Region III U.S. Nuclear Regulatory Commission Glen Ellyn, Illinois 60137

Reference:

Zion Generating Station Docket No. 50-304/DPR-48 Technical Specification, Section 6.6.2

Dear Mr. J. Keppler:

Enclosed please find Reportable Occurrence Report No.

50-304/78-71 for Zion Generating Station.

~

This report is submitted to you in accordance with the re-quirements of the Technical Specifications, Section 6.6.2.b(2),

which states that conditions leading to operation in a degraded mode permitted by a limiting condition for operation or clant shutdown required by a limiting condition for operation requires a 30-day written report.

Very truly yours,

/

r N. E. Wandke Superintendent Zion Station ATK/vym

Enclosure:

Reportable Occurrence Report No.

50-304/78-71 781221 C\\1 SCW/

k\\

$3