3 Commonwealth Edison

  1. p *..L:.

I k

' One First Nabonel Plaza. Chics 00, Ilhnois_

[

p-7.o '

Address Neply to: Poet Omco Box 757 -

.eN Chscego, lhnos 60000 0767 =

January 22, 1990 0{

~

Mr.'A. Bert Davis Regional Administrator L

U.S. Nuclear Regulatory Conunission I

~

Region-III 799 Roosevelt Road-Glen-Ellyn. II, 60137

[

4

Subject:

Zion Station Units 1 and 2

' Supplemental Response to NRC Bulletin 88-01 NRC Docket Nos. 50-295 and 50-304 i-

References:

- (a) NRC'Bulletin 88-01, dated February 5,1988.

}

(b) W.E. Morgan letter.to A.B. Davis, dated April 8, = 1988. -

(c) W.E. Morgan letter to A.B.. Davis, dated May 18. 1988.

(d)'M.H. Richter letter to A.B. Davis, dated February 9, 1989.

i 1-Dear Mr. Davis Reference (a), addressed to all holders.of' operating ~-licenses or-construction permits for nuclear power reactors, provided information on Westinghouse series DS circuit breakers and safety concerns associated with their use. -Addressees using these breakers in Class 1E service were requested to-perform and document inspection of the welds on the pole shafts and inspec-tionLof-the, alignment in the breaker closing mechanism.

Inspection of the

~ Zion Station Unit 1 DS breakers in Class 1E applications-(and'all; spare Class l

1E breakers) was completed ~ during the recent Unit I refueling outage (Fall 1989). :This letter provides the results of the Unit 1 breaker inspections.-

In Reference (b), Conunonwealth Edison indicated for Zion Unit 1 that

-i

" sixteen l(16) DS breakers, consieting of DS-206 and DS-416 breakers, would-be inspected'("short-term" and "long-term" inspections) during the Spring 1988 refueling outage. As reported in Reference (c), the inspections revealed that

each breaker could be kept in service for an interim period of time until the pole shaft could be, replaced. During the Fall 1989 refueling outage, replace-ment pole shafts,'which met all of the weld acceptance criteria identified in Reference (a), were installed'in those breakers and the alignment inspections were satisfactorily repeated.

fG//

9001290140 900122 PDR ADOCK 05000295

/II O

PDC ff y

s

,, _ a

'A.B. Davis January 22, 1990 4

The remaining Unit 1 DS breakers, consisting of twenty-eight (28)

DS-206 breakers, were also inspected ("short-term" and "long-term" inspections) during the Fall 1989 refueling outage.

Pole shafts were replaced on those breakers which failed to meet all of the weld acceptance criteria identified in Reference (a).

Breaker alignment inspections were only performed with originally installed pole shafts, or replacement pole shafts, which met the weld acceptance criteria.

The results of the Zion Unit 1 DS breaker inspections are presented on the Attachment to this letter.

This completes the inspections of the Westinghouse series DS circuit breakers, as requested by Reference (a), for Zion Unit 1.

As indicated in g

Reference (d), the breaker inspections for Zion Unit 2 have been completed.

Therefore, no further action is required by Zion Station for Reference (a).

Please direct any questions that you may have concerning this response l

to this office.

Respectfully, M.H. Richter Generic Issues Administrator 1

I Attachment i

cc: Document Control Desk - NRR Senior _ Resident Inspector - Zion C. Patel - Project Manager, NRR SUBSCRIBED AND SWORN to before me thisAD., f, day l[ ~,' 'O F F i t _,,,,,,,,_ql SE AL "

l of b ni u 199h l!PATRICI A LYUN MARLOW l i

l; 4

mV

/

.N ll NOTARY PUt OF ILUNOIS l P(Rw i n M1 } (LlWC llMY COMMi% e, r

CS 11/ 5 / 9 1];

Notary Public

-" ^ ' ' ' ~ ~ " ' '

lb/0495T

1 6

,L.;,

,[ O ' '

1

~

J..

pm l

ZION STATION UNIT 1~

RESULTS OF WESTINGHOUSE SERIES DS CIRCUIT BREAKER INSPECTIONS TYPE 416 TYPE 206 No. of breakers inspected 2

42 No. of breakers which had pole 2

41 shafts replaced due to welds No. of breakers requiring corrective 0

0 action for alignment i

The following breakers were inspected.

1A RCFC High Speed Pressuriser Heater. Control Group - 1B-1A RCFC Low Speed

    • Pressurizer Heater Backup. Group - 1A IB RCFC High Speed
    • Pressurizer Heater Backup Group - 10 1B RCFC Low Speed Battery Charger 011 j

10 RCFC High Speed Battery Charger 111' L

1C RCFC' Low Speed Battery Charger 112 h

ID RCFC High Speed-Aux. Bldg. Vent Exhaust Fan OA 1D RCFC Low Speed Aux. Bldg. Vent Exhaust Fan OB IE RCFC High Speed Aux. Bldg. Vent Exhaust Fan OC IE RCFC Low Speed Aux. Bldg. Vent Supply Fan OA Turbine Emerg. Oil Pump 1 Aux. Bldg. Vent Supply Fan OB Pos. Disp. Charg. Pump 10 Turb. Turning Gear 0.11 Pump 1-

/

Serv. Wtr. Booster Pump OB Computer & Misc. HVAC Refrig. 0A L

Cont. Rm. Refrig. Comp. 0A Aux. Bldg. Feed MCC 1371 Aux. Bldg. Feed-MCC 1372 Aux. Bldg.--Feed MCC 1381A and 1381B Aux.-Bldg. Feed MCC 1391 Aux. Bldg. Feed MCC 1383A and 1383B i

l Crib House Feed MCC 1382 Aux. Bldg. Feed MCC 1393A,1393B & 13930 l

Crib. House Feed MCC 1392 Spare Breaker: Bus 137, Cub. 2D Fire Water Pump OA Spare Breaker:

Bus 137, Cub. 3D Spare Breaker: Bus 137, Cub. 30 Spare Breakers. Bus 138, Cub. 30 Spare Breaker: Bus 138, Cub. 6A Spare Breaker: Bus 138, Cub. 6B Spare Breaker: Bus 138, Cub. 60 Spare Breaker:

Bus 138, Cub. 6D

    • Denotes Type DS-416 breaker. All other breakers are Type DS-206.