Requests Relief from 800229 Confirmatory Order for Facility to Extend Outage Time for 40 H in Order to Complete Repair Air Start Sys & Perform Operability Run on Diesel Generator 1B,per 900130 Telcon
ML20011E180
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 01/30/1990
From: Chrzanowski R
COMMONWEALTH EDISON CO.
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20011E179 List:
References
0628T, 628T, NUDOCS 9002080390
Download: ML20011E180 (2)


Text

Q,-

W i Commonwealth Edison ~

d s,

~

C

/ One first Nabonal Plaza. Chicago. IIMnois

'~

7gf. 2 J ~ XMrWheply to. Post OffdilioT76F w/ iChicago, Illinois 00090 07671 J1 f Q.

~ January 30, 1990 Mr. A.? Bert' Davis

Regiona1' Administrator U.Ss Nuclear; Regulatory Commission Region;III:

i 799 Roosevelt Road-l Glen.Ellyn,.IL.'60137-

Subject:

Zion Station Unit 1 License Number DPR-48 i

Request for Enforcement Discretion Diesel Generator Operability-Requirements NRC Docket No. 50-304 s

v

Dear Mr.. Davis:

s The purpose of this letter is to request relief from the~ February'29,,

~1980, Confirmatory Order for Zion Station, by-using the guidance outlined in.

the " Enforcement Discretion" process.

Specific relief is requested from the requirements of Appendix A,' Item B.6, which stipulates allowable outage times dependent'on.the number of Diesel Generator failures in the prior 100 tests.

Zion Station's Unit 1. diesel generators have experienced 4 failures in the prior 100 tests. This corresponds to an allowable outage time of 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br />.

Thia letter confirms the consnitment that was made during the course of the s

January 30, 1990, telephone conversation between Commonwealth Edison and members of your staff.

On Monday, at 1237 hours0.0143 days <br />0.344 hours <br />0.00205 weeks <br />4.706785e-4 months <br />, January 29, 1990, Unit I was operating at power when the '1B Diesel Generator was declared ' inoperable due' to a f ailure of Lthe Air Starting System.

Due to Unit 1 experiencing 4 diesel test failures in

the past 100 tests, the Confirmatory Order stipulates an allowable outage time
)'

of 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br />. Therefore, at=2037 hours, Unit 1 would be required to be in hot j

shutdown within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in cold shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

lThe specific purpose of this request-is to allow an extension of 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> (to 1237 hours0.0143 days <br />0.344 hours <br />0.00205 weeks <br />4.706785e-4 months <br /> on February 1, 1990) to complete the repair to the air start: system and to perf orm the required operability run.of the IB Diesel Generator. ; Zion Station requests temporary relief in this circumstance based on the following reasons:

1) The repairs.to the air start system will be completed within approximately 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />,
2) During.the operability test, the

= diesel is capable of providing emergency power to the Unit, 3) The undesirable stress of the shutdown transient will be avoided, and 4) Any Diesel Generator operability concerns observed during the test run will result i

in completing the shutdown of Unit 1.

Finally, if the diesel generator is still considered inoperable at the end of the 40 hour4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> proposed extension, the Unit will he shutdown in an orderly f ashion.

90020803990000 DR ADOCK

^

PDC

4-

. ;J

.in conclusion, Conanonwealth Edison Company requests -that the merit of this relief be evaluated considering the facts'that this problem was discovered'during' periodic diesel generator testing and is non-recurring, was-not reasonably foreseen by-the licensee, and can be corrected in a relatively short period of. Linie.

If you have any further questions regarding this. matter, please contact'this office.

Very truly yours, 624

..g #

^

R. A. C reanowski Nuclear Licen ing Administrator 0628T cc:

B. Clayton

'RIII C. Patel - NRR

.J. D. Smith - Zion Senior Resident