Commonwealth Edison Company
[*
1400 Opus Place Downers Grove, IL 60515-5701 1
August 28,1998
)
U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Dpf et Nos. STN-456 and STN 50-457 k
Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN-454 and STN 50-455 Dresden Nuclear Power Station, Units 1,2, and 3 Facility Operating License Nos. DPR-2, DPR-19, and DPR-25 NRC Docket Nos.50-010. 50-237 and 50-249 i
LaSalle County Nuclear Power Station, Units 1 and 2 Facility Operating Licenses Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 I
Quad Cities Nuclear Power Station, Units 1 and 2 Facility Operating Licenses Nos. DPR-29 and DPR-30 j
NRC Docket Nos. 50-254 and 50-265 Zion Nuclear Power Station, Units I and 2 n
I Facility Operating Licenses Nos. DPR-39 and DPR-48 NRC Docket Nos. 50-295 and 50-304
~, 21
Subject:
Fitness for Duty Performance Data Reports - First Period - 1998 l
In accordance with 10 CFR 26.71(d), the Commonwealth Edison (Comed) Company is providing the compiled fitness-for-duty program performance data for each of our nuclear power stations and the corporate support employees within the scope of the rule for the six month period ending June 30,1998. As required by 10 CFR 26.71(d),
9809040284 980828 PDR ADOCK 05000010 R
PDR A Unicom Company u.__
U.S..NRC August 28,1998 management actions and reported events are also provided as attachments. The information is being provided as required within 60 days of June 30,1998, i.e., by August 29,1998. This perfonnance data is reported on the January 1992 revised Fitness-For Duty (FFD) Performance Data Form developed by Nuclear Management and Resources Council (NUMARC).
Please direct any questions regarding this matter to Ms. Marcia Lesniak at 630/663-6484.
Respectfully, R. M. Kri Vice President - Regulatory Services Attachment l
cc:
Regional Administrator - NRC Region Ill NRC Senior Resident inspector - Braidwood Station NRC Senior Resident inspector - Byron Station NRC Senior Resident Inspector - Dresden Nuclear Power Station i
NRC Senior Resident inspector - LaSalle County Nuclear Power Station NRC Senior Resident Inspector - Quad Cities Nuclear Power Station
[
NRC Senior Resident inspector - Zion Nuclear Power Station l
I g: nla:allsta:fTd980 llic-98 123. doc:2 L
ATTACHMENT FITNESS FOR DUTY PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR 26 COMMONWEALTH EDISON COMPANY __ __
June 30.1998 Company Six Months Ending BRAIDWOOD NUCLEAR POWER STATION Location Judith C. Papaleo 630-663-6565 Contact Name Phone (include area code) l l
Cutoffs:
Screen / Confirmation (ng/ml)
/
/
Appendix A to 10CFR 26 M:rijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opintes 300/300 Alcohol (% BAC)
.04 I
Testing Results Licensee Long -Term Short -Term Contractor Employees Contractor Av; rage with 930 126 424 Unescorted Access Number Number Number Number Number Number Categories Tested Positive Tested Positive -
Tested Positive -
20 1
26 2
288 8
Pre-Access Post Accident 0
0 0
0 0
0 For Cause Observed Behavior 2
0 0
3 3
238 0
31 0
107 0
R:ndom 0
0 0
0 4
0 Follow-up 7
0 3
0 6
1 Other Pr:-Employment 0
0 0
0 0
0 Total 267 1
60 2
408 12 c___
R ts E
e W
T O
'o 0
0 0
P T
R a
l s
s A
u lt E
f u
e s
L R
e C
r U
tss N
o ei l
h a
t D
o 0
0 5
r a t t O
c od l
O A
pee W
rh t o
D e
t i
IA m
m r
d e/
R d g h
B c
n r
y 0
0 0
o 0 c
n S
n 5
I E
e
.f 8
h o
C l
C P
N He A
Tve T
s rlot S
e f n B
n d e d
i U
m log lo S
a 0
0 0
n hi h
st s
r t
C e
es e
e r
I h
r FI p
h e v h t r o T C
m o
b E
A ivm a 'n e
s P
it r
s s
o o S
o 'd t
s R
se pE s
a id O
a 0
0 0
m e
s E t
lmo c
t F
i n
s h p
/
S O
gC a
e l T
a t
T nr s
e o
S 0f b
ew u
v E
e 5 d s
i n T
m an it o s
o d )a w
om E
a 0
1 3
V c
Pm el t
o T
m t
I e/
o l
o r
l I
C n
AC g
f S
mn e
O a
1 1
2 4
le0 itv P
n p0 is a
D u
im (1 o
E jn l
p M
a Oev d
Ce e
I M
R 1
2 5
8 El t
F s
s Cd N
e w e
t o
,i O
s 0i l
s f
C e
9c lo la e
9 ef u
F y
1 ps O
lp 1
d o
,s a iv N
Ce i
r d
m eRv n
W E
nr ms bNo i
s r
r b
O e
et et mSa o
o o
K s
a
- a L
eU w
D e
T-c Tc d
T v
r t r A
o ee A
n gt r t t
e n n on T
Nt o e
h r E
c o o h o O
t r
p R
i n o o
L LC SC T
B Of e N
r lI l
BRAIDWOOD NUCLEAR POWER STATION h
l l
l Manaaement Actions and Sanctions l
l Fifteen positive tests resulted in the denial or revocation of unescorted access. On May 11, 1998, a short-term contractor admitted to providing an adulterated specimen that was not l
suitable for GC/MS confirmatory testing which resulted in the denial or revocation of unescorted access.
1 Events Reported There were no 24-hour reportable events during this reporting period.
l L
1 l
l l
l
FITNESS FOR DUTY PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR 26 l
COMMONWEALTH EDISON COMPANY June 30.1998 Company Six Months Ending BYRON NUCLEAR POWER STATION Location I
i Judith C. Papaleo 630-663-6565 Contact Name Phone (include area code)
Cutoffs:
Screen / Confirmation (ng/ml)
/
/
Appendix A to 10CFR 26 M:rijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opiltes 300/300 Alcohol (% BAC)
.04 Testing Results -
Licensee Long -Term Short -Term Contractor Employees Contractor 4
Av;r:ge with 958 125 774 l
Unescorted Access Number Number Number Number Number Number Categories Tested Positive Tested -
Positive Tested Positive 40 0
11 0
823 9
Pre-Access Post Accident 0
0 0
0 0
0 For Cause l
Observed Behavior 1
0 0
0 1
0 1
228 0
27 0
195 0
R:ndom 10 0
0 0
33 1
Follow-up 8
0 0
0 37 0
Other Pre-Employment 2
0 0
0 0
0 289 0
38 0
1089 10
T ts A
e T
T 0
0 3
3 S
o R
T r
E l
e a
t W
s s
ae f
lt u
r O
u
- g P
e s
R e
f, R
r A
ss t
E l
ei 5
o L
h a
t o
0 0
2 2
t t C
c a
rod U
lA p
N ee rh N
ot, O
e t lm n
r R
i e/
3 d
Y i
d g l
B c
n r
y 0
0 0
0 o 0 c
n S
n I
5 4
E e
.f C
C l
h o
P N
He A
Tve T
s rlot S
e f n lo d
B n
d e U
im log h
S a
0 0
0 0
n hi s
r t
st e
C e
es r
I h
r eh F
p h e vT CI m
o s
t r o
P ivm b 'n e
E A
a t
r o is 's os S
od id R
s t
e pE aE O
m s
ta 0
0 0
0 imo t h F
ip
/
t sl S
O gC ea T
nr Te S
0f e w o
E
'e 5 d iov n T
n an tim s
E ia 0
0 4
4 d )a om V
c el P
I o
i Co T
C nm
!A t
I e/g S
mn O
a 3
3 e0 P
n lp0 a
0 0
im(
D u
1 E
ij r
l Oe M
a v
R Ce.
I M
4 4
El F
s Cd N
e w
,io O
0i lo f
l C
e 9 c e
9 ef F
y 1 ps o
,s a O
lp 1
Ce N
m n
reRv W
E nrs ms bNo r
r b
O eo e o mSa e
D e
Tt Tc eU t
c K
s a
- a L
d v
A o ee r
t r A
n gt r t nt e
n n on T
Nt r
E o
ic o o h o O
r n
p R
L LC SC T
o e B
Of r
f BYRON NUCLEAR POWER STATION Manaaement Actions and Sanctions Ten positive tests resulted in the denial or revocation of unescorted access. Three refusals to test by short-term contractors resulted in the denial and revocation of unescorted access.
Events Reported There were no 24-hour reportable events during this reporting period.
l l
i
-]
i FITNESS FOR DUTY PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR 26 COMMONWEALTH EDISON COMPANY June 30.1998 Company Six Months Ending DRESDEN NUCLEAR POWER STATION Location Judith C. Papaleo 630-663-6565 Contact Name Phone (include area code)
Cutoffs:
Screen / Confirmation (ng/ml)
/
/
Appendix A to 10CFR 26 l
Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opi:tes 300/300 Alcohol (% BAC)
.04 Testing Results' Licensee Long -Tenn Short -Term Contractor Employees Contractor Av;r:ge with 994 111 877 Unescorted Access Number Number Number Number Number -
Number Categories Tested Positive Tested Positive Tested Positive 56 0
58 0
1540 25 Pr:-Access l
Post Accident 0
0 0
0 0
0 For Cause Observed Behavior 1
0 0
0 4
1 255 1
28 0
226 1
R:ndom 0
0 5
0 18 1
Follow-up 5
0 0
0 31 1
Other Prs-Employment 0
0 0
0 0
0 tom 317 1
91 0
1819 29 L_____.____________.-.__
AT ts S
e R
T E
o 0
0 0
0 T
W l
t O
as s
P f
lt t
u u
R e
s T
A R
e r
E t
L ss C
l ei i
o i
U h
t a
o 0
0 5
5 r a P
t t N
c od l
n i,
N A
pee E
r h D
ot S
e t
m E
i r
d e/
R i
d g D
lc n
r y
0 0
0 0
o 0
c n
4 S
n I
5 1
E e
.fo h
C l
C P
He N
~
Tv A
e T
s ot rl S
e f n B
n d e U
im lo g S
a 0
0 1
1 rn hi C
st t
I e
es h
r e
F I
p h e v
t r
o C
m o
b e
E A
ivm a
P it r
S s 's o
R s
od t
e pE s
a O
m e
t imo c
s a
0 0
1 1
t F
ip S
O gC a
e n
s
/
T t
T nr s
S 0f b
ew o
u iv E
e 5 d s
T t
in an is o
0 1
d )a w
om E
a 1
0 V
c 1
1 P
ei t
I o
r l
m t
T C
n I
e/
o lA g
f S
mn e
O a
1 1
e0 iv P
n 1
1 l p0 it a
s E
i 0
0 im (1 D
u o
j l
p r
Oe M
a 4
4 v
d R
M Ce te l
1 1
El F
s s
Cd O
s 0i,ie w e
N t
o f
l s
C e
9 c lo la e
9 ef u
F y
1 ps o
,s a id O
lp Ce iv 1
N r
d m
eRv n
W E
ms ms bNo i
r r
b r
O o
e o mSa r
o e
et D
e Tc Tc eU w
t L
d T
K s
- a
- a v
A o ee r
t r A
n gt r t t
e n n on T
Nt h r o o h o O
o e
E R
ic r
t n
p L
LC SC T
o o
B Of e N
r
DRESDEN NUCLEAR POWER STATION Manaaement Actions and Sanctions Thirty positive tests resulted in the denial or revocation of unescorted access.
Events Reported There were no 24-hour reportable events during this reporting period.
i l
l l
l l.
FITNESS FOR DUTY PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR 26 COMMONWEALTH EDISON COMPANY June 30.1998 Company Six Months Ending LASALLE NUCLEAR POWER STATION Location Judith C. Papaleo 630-663-6565 Contact Name Phone (include area code)
Cutoffs:
Screen / Confirmation (ng/ml)
/
/
Appendix A to 10CFR 26 M:rijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opi:tes 300/300 Alcohol (% BAC)
.04 Ter, ting Results Licensee Long -Term Short -Term Contractor Employees Contractor l
/sv;r:ge with 961 105 1270 Unescorted Access Number Number Number Number Number Number Categories Tested Positive Tested Positive Tested Positive 21 0
7 0
1002 19 Pr;-Access Post Accident 0
0 0
0 0
0 For Cause l
Observed Behavior 0
0 0
0 8
3 4
245 27 0
323 0
R:ndom 6
0 0
0 32 0
F:llow-up 4
0 0
0 28 4
Other Pr -Employment 3
0 0
0 0
0 tow 279 0
34 0
1393 26 l
O' se 0
0 1
1 P
T R
o A
T E
l L
as C
u s
U f
lt e
u N
R s
Y e
r T
t N
l s s o
ei U
h t a O
o 0
0 8
8 t tr a C
lc o d A
p E
ee L
rh t
L o,
e A
lm t
S in r
d e/
A d g i
L lc n
r y
0 0
0 0
o 0 c
n 1
S n
I 5
1 E
e
.fo h
C l
C P
N He T
L Tv A
e r
l s
ot S
e f n B
n d e U
im lo gn S
a 0
0 0
0 hi t
st r IC e
es h
r e
FI m
o b
p h e v
t r
o C
e E
A P
ivm a'
t r
iss o
S o d' R
s t
e pE a
O m
s s
ta 0
0 0
0 imo e
F ip
/
t c
s S
O gC n
e T
nr a
T t
o S
0f s
e b
v E
e 5 d u
in T
n an s
i o t
s E
ia 0
0 8
8 d )a o
om V
c t
l el w
Pm I
o T
m l
t I
C n
r e/
AC g
o S
mn f
O
'a 8
8 e0 e
P n
p0 iv l
a E
i 0
0 im(
it D
u s
1 j
l o
r M
a Oe p
1 1
v I
M Ce e
R d
1 1
El F
s t
Cd N
e w se o
,i O
s 0i l
t f
C e
9 c l
l o
a e
9 ef u
F y
1 ps d
o
,s a i
O lp Ce iv 1
N d
m rRv s
e n
W E
nr bNo i
s r
b O
et mSa e
D N e
- o o
t n
e c
Tc eU L
d O
KO s
- a
- a v
A o ee r
t r
I n
9t r t AT t
e
" n on T
Nth r o
e EA c
o h o O
t r
p RT iL C
SC T
n o o
e BS Of i N
LASALLE COUNTY NUCLEAR POWER STATION Manaaement Actions and Sanctions Twenty-six positive tests resulted in the denial or revocation of unescorted access. One refusal to test by a short-term contractor resulted in the denial and revocation of unescorted access.
Events Reported A For Cause test was conducted on a short-term contractor supervisor on January 15,1998 that resulted in the denial and revocation of unescorted access. A 24-hour reportable event telephone call was made to the NRC Operations Center on January 15,1998.
i a
e
FITNESS FOR DUTY PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR 26 l
COMMONWEALTH EDISON COMPANY June 30.1998 l
Company Six Months Ending QUAD CITIES NUCLEAR POWER STATION Location Judith C. PaDaleo 630-663-6565 Contact Name Phone (include area code) l l
Cutoffs:
Screen / Confirmation (ng/ml)
/
/
Appendix A to 10CFR 26 M:rijuana 50/15 Amphetamines 1000/500 1
Cocaine 300/150 Phencyclidine 25/25 Opi:.tes 300/300 Alcohol (% BAC)
.04 Testing Results Licensee Long -Term Short -Term Contractor Employees Contractor Av rage with 915 97 377 Unescorted Access Number Number Number Number Number Number
)
Categories Tested Positive Tested Positive Tested Positive 25 0
0 0
309 5
Prs-Access Post Accident 0
0 0
0 0
0 For Cause Observed Behavior 1
0 0
0 1
0 228 0
25 0
96 0
R ndom 5
0 0
0 5
1 Follow-up 0
0 0
0 4
0 l
Other Pre-Employment 12 0
0 0
0 0
Tohl 271 0
25 0
415 6
i
R t
E se W
T e
r 0
0 0
O o
a t
P T
t e
ar R
la s
sg t
A s
lt r
s o u
u e
E f
s Ti L
e e
m C
R r
e/
U t
vg ss in t
N l
ei is0 o
t a S
h o0 t t E
o 0
0 1
a P1 r
c od h
lA ee p
lC rh ot D
l, t
e m
A in e/
r U
d d g 1
Q lc o
i r
n y
0 0
0 0
S c
In 5 n
.f 2
E e
o C
h C
l N
P He A
Tve T
rl S
s ot e
f n B
n d e d
U i
S m
lo g lo n
hi h
a r
t 0
0 0
st s
C e
es e
r e
r FI h
h e v h I
p t r o T C
m e
b o
s E
A vm a 'n P
it r
is S
s' o o t
is
's od R
pE a d e
O im s E t
F ia 0
0 1
mo ts h p
/C el t
S O
g T
nr Ta o
e S
0f ew v
E e
5 d it n T
ia 0
0 2
n an is o E
d )a om V
c el Pm I
o m
l o
t I
C n
T l
e/
AC g
S mn O
'a 1
e0 P
n lp0 a
E ij im1 D
u 0
0
(
M a
Oel r
v I
Ce R
M 2
2 F
r El
.s Cd N
e wo
,i O
s 0i f
C e
9 cllo e
9 ef F
y 1 ps O
lo s a 1
p Ce W
E mrs ms bNo N
m eRv r
r r
b O
o et mSa r
o e
et D
e Tc Tc eU L
d K
s
- a
- a v
A o ee r
t r n
gt r t A
t e
n n on T
Nt h r E
c o o h o O
o r
n p
R i
LC SC T
o L
B Of er
4 QUAD CITIES NUCLEAR POWER STATION Manaaement Actions and Sanctions i
Six positive tests resulted in the denial or revocation of unescorted access.
Events Reported There were no 24-hour reportable events during this reporting period.
i j
l l
i u__--___-___-_.
FITNESS FOR DUTY PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR 26 COMMONWEALTH EDISON COMPANY June 30.1998 j
Company Six Months Ending ZION NUCLEAR POWER STATION Location Judith C. Papaleo 630-663-6565 Contact Name Phone (include area code)
I Cutoffs:
Screen / Confirmation (ng/ml)
/
/
Appendix A to 10CFR 26 M::rijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Ophtes 300/300 Alcohol (% BAC)
.04 Testing Results Licensee Long -Term Short Term Contractor Employees Contractor l
Av; rage with 694 93 229 Unescorted Access Number Number.
Number Number Number Number Categories Tested Positive Tested Positive Tested Positive 12 0
8 0
173 2
j Pre-Access Post Accident 0
0 0
0 0
0 For Cause
(
Observed Behavior 0
0 0
0 2
0 l
171 1
24 0
55 0
l Rcndom 3
0 0
0 6
1 4
Follow-up l
1 0
3 0
0 0
}
Other l
Pr -Employment 8
0 0
0 0
0 i
Total 195 1
35 0
236 3
L__.___
h t
O s
I e
T T
A 0
0 1
T o
T S
l R
a s
s E
u lt W
e s
f u
O R
e P
r t
R l
s s o
ei A
h t
a E
o 0
0 0
t tr a L
lc od C
A pee U
rh N
ot, e
t n
i N
i r
m I
i e/
O d
Z l
d g r
c n
y 0
0 0
o c
0 S
n In 5 2
C C
l E
e
.f h
o P
N He T
Tv A
e rl s
ot S
e f n B
U in d
d e lo m
log S
a 0
0 0
rn hi h
st s
t C
e es e
I h
r e
r F
I p
h e v h C
m o
b t r o T e
s E
A P
ivm a'n t
r is S
s' o o t i R
s od e
pE a d O
m s E t
F ia 0
0 0
imo ts h p
/
t S
O gC e
l T
nr T
a o
e S
0f e w E
e 5 d i
n v
T n
an it o
s E
ia 1
0 1
d )a om V
c el Pm I
o l
T m
l o
t I
C n/
eg AC S
mn O
a 1
e0 P
n lp0 a
D u
0 0
im (1 j
l E
M a
Oe ir v
R Ce I
M 2
2 F
El
.s Cdew N
O s
0i lo
,i f
C e
9 clo e
9 ef F
y 1 ps o
s a O
lp Ce 1
N m
eRv r
W E
nr ms bNo s
r r
b O
o e o mSa e
et t
D e
Tc Tc eU L
d K
s
- a
- a v
A o ee r
t r
A n
gt r t t
h e
n n on T
Nt r
E o
R ic o o h o O
r p n o L
LC SC T
B Of e r
l1
i ZION NUCLEAR POWER STATION Manaaement Actions and Sanctions Four positive tests resulted in the denial or revocation of unescorted access. One refusal to test by a short-term contractor resulted in the denial and revocation of unescorted access.
Events Reported I
There were no 24-hour reportable events during this reporting period.
l i
FITNESS FOR DUTY PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR 26 COMMONWEALTH EDISON COMPANY June 30.1998 Company Six Months Ending CORPORATE NUCLEAR OPERATIONS Location Judith C. Papaloo 630-663-6565 Contact Name Phone (include area code)
Cutoffs:
Screen / Confirmation (ng/ml)
/
/
Appendix A to 10CFR 26 Mirijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opictes 300/300 Alcohol (% BAC)
.04 Testing Results Licensee Long -Term Short -Term I
Contractor Employees Contractor l
Av; rage with 738 0
0 Unescorted Access Number Number Number Number Number Number Categories Tested Positive Tested Positive Tested Positive I
48 0
0 0
12 0
Pr:-Access Post Accident 0
0 0
0 0
0 i
For Cause j
Observed Behavior 0
0 0
0 0
0 185 0
0 0
3 0
Random 3
0 0
0 2
0 Follow-up 0
0 0
0 0
0 Other Pre-Employment 32 0
0 0
1 0
268 0
0 0
18 0
L iE
]l1li I
lj il i
S N
O IT t
A s
e
. R T
EP o
O 0
0 0
O T
re la R
t s
s a
t t
A u
f u
a e l
E e
s sg r
L R.
e t
r s
r C
t e o U
ss Ti l
N o
ei m
h t a e/
E o
O 0
0 0
r a ivg t t T
c od it n l
A A
p s0 R
ee o0 rh P1 O
ot, P
e t
i m
R r
i O
d e/
d g il r
C c
n y
O 0
0 0
o 0 0
c n
S n
I 5
E e
.f o
h C
l C
P N
He O
A Tv e
T s
ot rl S
e f n B
n d e i
U m
log S
a O
0 0
0 n
d hi t
st lo r
C e
es h
I h
r s
F p
h e e
I i
t r C
r o
er e
vh i
E A
itvm oT P
b is 's a 's S
R s
od n
r e
pE o o t is O
m ta O
0 0
0 imo ad F
ip
/C sE S
O g
t T
nr sh t
o el S
0f Ta
. E e
5 d e
T n
an ew v
E i
d )a in a
O 0
0 0
tio c
V el s
o nm om t
I T
C.
e/
Pm I
g l
S mn l
o O
a e0 AC P
n lp0 a
D u
O 0
0 0
im(
1 E
j M
ir l
a Oev I
M Ce.
R El F
s Cdew N
,io O
s 0i f l
C e
9 clo e
9 ef F
y 1 ps o
,s a O
lp Ce 1
N m
eRv r
W E
ms ms bNo r
r r
b O
r o o
e et et mSa c
Tc eU D
e T-
~
L d
a
- a K
s v
A o ee r
t r A
n gt r t t
WOf h r e
n n on Nt E
o R
ic o o h o r
n p
L LC SC T
o e B
r
[
CORPORATE NUCLEAR OPERATIONS H
Manaaement Actions and Sanctions 4
There were no positive test results requiring action during this reporting period.
Four hundred sixty-four (464) on-site tested negative quality control specimens were submitted to the SAMHSA laboratory during this period. 463 specimens were confirmed negative by the laboratory. One specimen confirmed positive at the laboratory following GC/MS testing. This specimen tested on-site at 98% of the positive threshold and was a valid negative. The on-site immunoassay test instrument was calibrated according to manufacturer's recommendations. A review of the forty-three other specimens tested during the run yielded no abnormalities. The Laboratory Forensic Testing Director was prdvided on-site screening information. She noted that when this specimen was tested on-site, it was properly reported i
as a negative test, although it was just under the positive threshold. The Laboratory Director concluded the overall accuracy of the on-site specimen screening program is acceptable j
under instrument accuracy standards. The false negative test result may be attributed to variability of reagents and/or differences in on-site and laboratory test equipment. Statistically, specimens that are right at the threshold level may screen both above and below the cutoff, if j
testing is repeated.
Blind performance testing was conducted at a rate of ten percent. Fourteen (14) specimens were submitted to the laboratory. All results were reported correctly.
Three (3) Fitness For Duty program violation appeals were presented to the Review Board for this period. The Comed Executive Review Board upheld all violation decisions.
Ninety-six (96) positive test results for specific substances were confirmed positive by the Medical Review Officer. Additionally, three (3) positive specimens were reanalyzed and re-confirmed positive.
Events Reported There were no 24-hour reportable events during the period.