ML20042G970

From kanterella
Jump to navigation Jump to search
Forwards Corrected Monthly Operating Rept for Mar 1990 for Zion Unit 1.Original Rept Did Not Reflect Correct Forced Outage Duration for Time Period
ML20042G970
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 05/03/1990
From: Joyce T
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20042G971 List:
References
Z6D-90-012, Z6D-90-12, NUDOCS 9005160354
Download: ML20042G970 (1)


Text

v 1

I g.;*Q g,

+

i-

  1. I Commonwealth Edison-Zion Generating Station 4

,=

I

^'

- Shiloh Blvd. & Lake Michigan

~ Zion lilinois 60099 To 708 /746-2064 s

J May:3, 1990

'I Z6D-90-012 y

H 1

U.S.; Nuclear Regulatory Commission Dccument Control' Desk

. Washington, DC. 20555

Dear Sir:

Enclosed please find the corrected unit shutdown information for Zion's March 1990 Operating Status Report.

-March's report did not reflect-the correct forced outage duration for that time period.

j Sincerely, f-41 "

T.P. 'oyce Station Manager Zion Station i

-1

-TPJ/JT/ddr l

Enclosure cc:-

T. Maiman l

A.B. Davis (NRC) l' J.

Leider-M.S. Turbak W. Naughton T.J. Kovach D.R.

Eggett INPO Div. of Eng. Health State of Illinois Tech Staff File'

'I i'

Director, Office of Inspection and Enforcement Master File 9005160354 900503 PDR ADOCK ODOOO295 R

PDC i

ZERY i

{

t

'll J