MONTHYEARML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217J4411999-10-18018 October 1999 Forwards Exemption from Certain Requirements of 10CFR73.55 for Zion Nuclear Power Station,Units 1 & 2 in Response to Application Dtd 990730,to Allow Util to Discontinue Specific Aspects of Security Plan & SER ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20216G9541999-09-27027 September 1999 Forwards Environ Assessment & Finding of No Significant Impact Re 990730 Application for Exemption.Exemption Would Allow Zion Nuclear Power Station to Discontinue Specific Aspects of Security Plan A99025, Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station1999-09-15015 September 1999 Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station ML20211L1551999-09-0101 September 1999 Forwards Insp Repts 50-295/99-03 & 50-304/99-03 on 990608-0812 at Zion 1 & 2 Reactor Facilities.No Violations Noted.Activities in Areas of Facility Mgt & Control, Decommissioning Support,Sf & Radiological Safety Examined ML20211J9701999-08-31031 August 1999 Discusses Request for Approval of Defueled Station Emergency Plan & Exemption from Certain Requirements of 10CFR50.47, Emergency Plans, for Plant,Units 1 & 2.Exemption & Safety Evaluation Encl ML20211J0311999-08-30030 August 1999 Agrees with Content in NRC 990810 Memo Re Plant Spent Fuel Pool.Memo Contains Accurate Summation of Info That Util Communicated to NRC During 990713 Telcon ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211G8191999-08-26026 August 1999 Forwards Amend 6 to Fire Protection Rept for Zion Nuclear Power Station,Units 1 & 2, IAW 10CFR50.71(e).Attachment 1 Contains Summary of Changes ML20211F5971999-08-20020 August 1999 Submits Request for Addl Info Re Proposed Defueled TSs for Plant,Per NRC Bulletin 94-001, Potential Fuel Pool Draindown Caused by Inadequate Maint Practices at Dresden Unit 1 ML20211C7401999-08-19019 August 1999 Informs That NRC Plans to Stop Using Office Complex at Zion Nuclear Generating Station Which Commonwealth Edison Provided for NRC Resident Inspectors Under 10CFR50.70(b)(1). NRC-owned Equipment to Be Moved on or About 991001 ML20211J4421999-08-13013 August 1999 Forwards, EA & Finding of No Significant Impact Re Application for Exemption ,as Suppl by 990708 & 19 Ltrs.Proposed Exemption Would Modify Emergency Response Plan Requirements as Listed ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210J0861999-07-30030 July 1999 Requests NRC Approval of Exemption from Certain Requirements of 10CFR73, Physical Protection of Plants & Matls, by 990921.Exemption Is Needed to Support Scheduled 991001 Implementation of Plant Sf Ni.Encl Withheld,Per 10CFR73.21 ML20210C3641999-07-20020 July 1999 Discusses OI Rept 3-98-017 Completed on 980224 Re Contract Security Officer That Inadvertently Brought Personal Handgun Into Search Area at Plant & Forward NOV ML20210C4201999-07-20020 July 1999 Discusses Investigation Rept 3-98-017 Into Info Reported to Comed on 980224,informing NRC That N Everson Brought Personal Handgun Into Personnel Search Area at Plant.Nrc Determined That Violation Occurred.Nov Encl ML20210C2561999-07-19019 July 1999 Forwards Rev 1 to Calculation 22S-B-110X-0068, Determination of Heat Load for Assemblies F50D & Z33A, as Replacement Pages to Rev 0.Calculation Submitted Re Request for Approval of Proposed Plant Defueled Station EP ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20209E7391999-07-0808 July 1999 Forwards Proposed Revised Znps Defueled Station Emergency Plan & Supporting Calculations.Revs to Proposed Defueled Station Emergency Plan Have Been Reviewed & Approved IAW Comed QA Program ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20196D3301999-06-18018 June 1999 Forwards Insp Repts 50-295/99-02 & 50-304/99-02 on 990121-0608.No Violations or Deviations Were Identified. Weakness Noted in Self Assessment/Corrective Action Program in Which Series of Personnel Errors Not Recorded in PIF Sys ML20195H9391999-06-15015 June 1999 Forwards Revised Monthly Operating Rept for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.Data Was Revised to Reflect Change in Daylight Savings Time ML20207H6121999-06-10010 June 1999 Provides Synopsis of OI Rept 3-1998-012 & Summary of Relevant Facts Re Violation Involving Employment Discrimination Against SRO at Zion Station.Enforcement Conference Scheduled for 990707 ML20195E3451999-06-0707 June 1999 Forwards 3.5 Inch Computer Diskette Containing Revised File Format for Annual Dose Rept for 1998,per 990520 Telcon Request from Nrc.Each Station Data Is Preceded by Header Record,Which Provides Info Necessary to Identify Data ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs A99018, Responds to NRC Re Violations Noted in IR 3-98- 017.Corrective Actions:Three Security Guards Unescorted Access to All Comm Ed Nuclear Stations Put on Temporary Hold1999-05-27027 May 1999 Responds to NRC Re Violations Noted in IR 3-98- 017.Corrective Actions:Three Security Guards Unescorted Access to All Comm Ed Nuclear Stations Put on Temporary Hold ML20195B2301999-05-19019 May 1999 Requests Approval of Proposed Changes to QA Topical Rept CE-1-A,rev 66a.Attachment a Describes Changes,Reason for Change & Basis for Concluding That Revised QAP Incorporating Proposed Changes Continues to Satisfy 10CFR50AppB ML20207B5991999-05-14014 May 1999 Informs That NRC Ofc of NRR Reorganized,Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Was Created.Reorganization Chart Encl ML20206F5381999-04-30030 April 1999 Forwards Magnetic Tape Containing Annual Dose Repts for 1998 for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR20.2206(c).Without Magnetic Tape ML20206D8041999-04-30030 April 1999 Forwards Zion Nuclear Power Station Annual Radiological Environ Operating Rept & Listing of Commitments ML20206B9371999-04-27027 April 1999 Discusses Investigation Rept 3-98-17 Re Info Reported by Licensee on 980224 That Firearm Detected During Routine Search of Contractor Employee & Failure to Rept Incident to Supervisor.Oi Rept Synopsis Encl ML20206B4051999-04-23023 April 1999 Ack Receipt of Encl FEMA Ltr,Transmitting FEMA Evaluation Rept for 980819 Annual Medical Drill for Zion Nuclear Power Station.No Deficiencies Noted.Two Areas Requiring Corrective Action Noted During Drill ML20206B2471999-04-20020 April 1999 Informs That SE Kuczynski Has Been Transferred to Position No Longer Requiring SRO License.Cancel License SOP-31030-1, Effective 990412 ML20205S5811999-04-16016 April 1999 Responds to Which Urged Full Public Hearing to Held on Concerns Raised by R Robarge & E Dienethal Re Zion Npp.Commission Issued 990302 Memo & Order Affirming ASLB Decision to Deny Petition to Intervene A99014, Provides Description of Actions Comed Has Taken to Reinforce Safety Conscious Work Environ at Zion Nuclear Power Station1999-04-15015 April 1999 Provides Description of Actions Comed Has Taken to Reinforce Safety Conscious Work Environ at Zion Nuclear Power Station ML20205Q9971999-04-13013 April 1999 Requests NRC Approval of Plant Defueled Station Emergency Plan in Accordance with 10CFR50.54(q).Ltrs of Agreement Between Util & Offsite Agencies Who Have Agreed to Provide Assistance to Plant Encl.Calculations Also Encl ML20205P2071999-04-0909 April 1999 Discusses Insp Repts 50-295/98-02,50-304/98-02 & OI Rept 3-98-015 Completed on 981112 & Forwards Nov.Violation Involves Zion Supervisor Who Willingly Failed to Protect Unattended SGI from Unauthorized Disclosure ML20205K5841999-03-31031 March 1999 Submits Rept on Status of Decommissioning Funding for Reactors Owned by Comm Ed.Attachment 1 Contains Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML20206B4331999-03-26026 March 1999 Forwards Rept for Annual Medical Drill Conducted for Zion Nuclear Power Station on 980819.Two Areas Requiring Corrective Action Identified During Drill ML20205B4241999-03-23023 March 1999 Provides Results of drive-in Drill Conducted on 990208,as Well as Augmentation Phone Drills Conducted Since 981015,as Committed to in Util A99011, Responds to NRC Re Violations Noted Insp Repts 50-295/98-02 & 50-304/98-02.Corrective Actions:Uncontrolled Safeguards Documents Were Immediately Taken Into Possession & Controlled by Plant Security Supervisor1999-03-18018 March 1999 Responds to NRC Re Violations Noted Insp Repts 50-295/98-02 & 50-304/98-02.Corrective Actions:Uncontrolled Safeguards Documents Were Immediately Taken Into Possession & Controlled by Plant Security Supervisor ML20207D6831999-03-0101 March 1999 Forwards fitness-for-duty Program Performance Data for Each Comed Nuclear Power Station & Corporate Support Employees for Six Month Period Ending 981231,per 10CFR26.71(d) A99009, Forwards Znps Annual Occupational Exposure Rept, for Exposures Occurring in 1998.Listing of Commitments Contained in Ltr Provided as Attachment B1999-03-0101 March 1999 Forwards Znps Annual Occupational Exposure Rept, for Exposures Occurring in 1998.Listing of Commitments Contained in Ltr Provided as Attachment B ML20202J4381999-02-0303 February 1999 Forwards Zion Fuel Evaluation Info,Per Discussion ML20203C7001999-02-0202 February 1999 Informs That Mhb Technical Associates No Longer Wishes to Receive Us Region III Docket Info Re Comed Nuclear Facilities.Please Remove Following Listing from Service List A99001, Forwards Zion 1998 Annual Rept of Revised Regulatory Commitments1999-01-19019 January 1999 Forwards Zion 1998 Annual Rept of Revised Regulatory Commitments 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr A99025, Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station1999-09-15015 September 1999 Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station ML20211J0311999-08-30030 August 1999 Agrees with Content in NRC 990810 Memo Re Plant Spent Fuel Pool.Memo Contains Accurate Summation of Info That Util Communicated to NRC During 990713 Telcon ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211G8191999-08-26026 August 1999 Forwards Amend 6 to Fire Protection Rept for Zion Nuclear Power Station,Units 1 & 2, IAW 10CFR50.71(e).Attachment 1 Contains Summary of Changes ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210J0861999-07-30030 July 1999 Requests NRC Approval of Exemption from Certain Requirements of 10CFR73, Physical Protection of Plants & Matls, by 990921.Exemption Is Needed to Support Scheduled 991001 Implementation of Plant Sf Ni.Encl Withheld,Per 10CFR73.21 ML20210C2561999-07-19019 July 1999 Forwards Rev 1 to Calculation 22S-B-110X-0068, Determination of Heat Load for Assemblies F50D & Z33A, as Replacement Pages to Rev 0.Calculation Submitted Re Request for Approval of Proposed Plant Defueled Station EP ML20209E7391999-07-0808 July 1999 Forwards Proposed Revised Znps Defueled Station Emergency Plan & Supporting Calculations.Revs to Proposed Defueled Station Emergency Plan Have Been Reviewed & Approved IAW Comed QA Program ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20195H9391999-06-15015 June 1999 Forwards Revised Monthly Operating Rept for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.Data Was Revised to Reflect Change in Daylight Savings Time ML20195E3451999-06-0707 June 1999 Forwards 3.5 Inch Computer Diskette Containing Revised File Format for Annual Dose Rept for 1998,per 990520 Telcon Request from Nrc.Each Station Data Is Preceded by Header Record,Which Provides Info Necessary to Identify Data ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs A99018, Responds to NRC Re Violations Noted in IR 3-98- 017.Corrective Actions:Three Security Guards Unescorted Access to All Comm Ed Nuclear Stations Put on Temporary Hold1999-05-27027 May 1999 Responds to NRC Re Violations Noted in IR 3-98- 017.Corrective Actions:Three Security Guards Unescorted Access to All Comm Ed Nuclear Stations Put on Temporary Hold ML20195B2301999-05-19019 May 1999 Requests Approval of Proposed Changes to QA Topical Rept CE-1-A,rev 66a.Attachment a Describes Changes,Reason for Change & Basis for Concluding That Revised QAP Incorporating Proposed Changes Continues to Satisfy 10CFR50AppB ML20206D8041999-04-30030 April 1999 Forwards Zion Nuclear Power Station Annual Radiological Environ Operating Rept & Listing of Commitments ML20206F5381999-04-30030 April 1999 Forwards Magnetic Tape Containing Annual Dose Repts for 1998 for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR20.2206(c).Without Magnetic Tape ML20206B2471999-04-20020 April 1999 Informs That SE Kuczynski Has Been Transferred to Position No Longer Requiring SRO License.Cancel License SOP-31030-1, Effective 990412 A99014, Provides Description of Actions Comed Has Taken to Reinforce Safety Conscious Work Environ at Zion Nuclear Power Station1999-04-15015 April 1999 Provides Description of Actions Comed Has Taken to Reinforce Safety Conscious Work Environ at Zion Nuclear Power Station ML20205Q9971999-04-13013 April 1999 Requests NRC Approval of Plant Defueled Station Emergency Plan in Accordance with 10CFR50.54(q).Ltrs of Agreement Between Util & Offsite Agencies Who Have Agreed to Provide Assistance to Plant Encl.Calculations Also Encl ML20205K5841999-03-31031 March 1999 Submits Rept on Status of Decommissioning Funding for Reactors Owned by Comm Ed.Attachment 1 Contains Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML20206B4331999-03-26026 March 1999 Forwards Rept for Annual Medical Drill Conducted for Zion Nuclear Power Station on 980819.Two Areas Requiring Corrective Action Identified During Drill ML20205B4241999-03-23023 March 1999 Provides Results of drive-in Drill Conducted on 990208,as Well as Augmentation Phone Drills Conducted Since 981015,as Committed to in Util A99011, Responds to NRC Re Violations Noted Insp Repts 50-295/98-02 & 50-304/98-02.Corrective Actions:Uncontrolled Safeguards Documents Were Immediately Taken Into Possession & Controlled by Plant Security Supervisor1999-03-18018 March 1999 Responds to NRC Re Violations Noted Insp Repts 50-295/98-02 & 50-304/98-02.Corrective Actions:Uncontrolled Safeguards Documents Were Immediately Taken Into Possession & Controlled by Plant Security Supervisor A99009, Forwards Znps Annual Occupational Exposure Rept, for Exposures Occurring in 1998.Listing of Commitments Contained in Ltr Provided as Attachment B1999-03-0101 March 1999 Forwards Znps Annual Occupational Exposure Rept, for Exposures Occurring in 1998.Listing of Commitments Contained in Ltr Provided as Attachment B ML20207D6831999-03-0101 March 1999 Forwards fitness-for-duty Program Performance Data for Each Comed Nuclear Power Station & Corporate Support Employees for Six Month Period Ending 981231,per 10CFR26.71(d) ML20202J4381999-02-0303 February 1999 Forwards Zion Fuel Evaluation Info,Per Discussion ML20203C7001999-02-0202 February 1999 Informs That Mhb Technical Associates No Longer Wishes to Receive Us Region III Docket Info Re Comed Nuclear Facilities.Please Remove Following Listing from Service List A99001, Forwards Zion 1998 Annual Rept of Revised Regulatory Commitments1999-01-19019 January 1999 Forwards Zion 1998 Annual Rept of Revised Regulatory Commitments A98056, Forwards List of Revised Various Commitments Originally Contained in Util to Nrc.Changes in Commitments Were Satisfactorily Evaluated Using NEI Commitment Change Methodology1998-12-11011 December 1998 Forwards List of Revised Various Commitments Originally Contained in Util to Nrc.Changes in Commitments Were Satisfactorily Evaluated Using NEI Commitment Change Methodology ML20198C2501998-12-11011 December 1998 Forwards Rev 45 to Zion Nuclear Power Station Security Plan, Per Requirements of 10CFR50.4(b)(4).Rev Includes Listed Changes.Licensee Has Concluded That Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld ML20196B5871998-11-20020 November 1998 Requests That Svc List for All NRC Correspondence Re Any of Six Comed Nuclear Stations Be Modified Per Attached List.All Other Names Previously Listed Should Be Removed A98051, Forwards List of Revised Regulatory Commitments Which Were Evaluated as Satisfactory Using NEI Commitment Change Methodology1998-11-20020 November 1998 Forwards List of Revised Regulatory Commitments Which Were Evaluated as Satisfactory Using NEI Commitment Change Methodology A98055, Forwards List of Revised Regulatory Commitments Which Were Evaluated as Satisfactory Using NEC Commitment Change Methodology1998-11-20020 November 1998 Forwards List of Revised Regulatory Commitments Which Were Evaluated as Satisfactory Using NEC Commitment Change Methodology ML20195E6451998-11-12012 November 1998 Provides Results of drive-in Drill Conducted on 981007,as Well as Augmentation Phone Drill Conducted on 980917 A98059, Forwards Page Change Instruction for Aug 1998 DSAR for Zion Nuclear Power Station,Units 1 & 2.Instruction Was Omitted from 981110 DSAR Due to Administrative Error1998-11-11011 November 1998 Forwards Page Change Instruction for Aug 1998 DSAR for Zion Nuclear Power Station,Units 1 & 2.Instruction Was Omitted from 981110 DSAR Due to Administrative Error A98053, Forwards Change Instructions for Update to Zion UFSAR, Rewritten to Reflect Permanent Defueled Condition of Plant. & DSAR,1998-11-10010 November 1998 Forwards Change Instructions for Update to Zion UFSAR, Rewritten to Reflect Permanent Defueled Condition of Plant. & DSAR, ML20155D2701998-10-27027 October 1998 Forwards Changed Pages from 980423 Submittal Providing Addl Info Marked with Revision Bars & Revised Pages to QA Topical Rept Section 18,for Review ML20198C7401998-10-21021 October 1998 Informs That Encl Correspondence Was Received from Constituent,C Paxton Re Request for Investigation as to Documentation Also Encl.Without Encl ML20154J4951998-10-0707 October 1998 Forwards Revised Security Plans for CE Listed Nuclear Power Stations,Per 10CFR50.4(b)(4).Changes Do Not Decrease Effectiveness of Station Security Plans.Encl Withheld A98050, Forwards Zion Station Special Rept Number 30412398002SR.Rept for Reporting Period of Jan 1996-Dec 1997.Attachment B Provides Listing of Commitments Contained in Submittal1998-10-0505 October 1998 Forwards Zion Station Special Rept Number 30412398002SR.Rept for Reporting Period of Jan 1996-Dec 1997.Attachment B Provides Listing of Commitments Contained in Submittal ML20151Y5101998-09-11011 September 1998 Provides Results of drive-in-drill Conducted on 980804 & Augmentation Phone Drills Conducted Between 980601 & 0831 ML20238F7571998-08-28028 August 1998 Forwards fitness-for-duty Program Performance Data for Each of Util Nuclear Power Stations for Six Month Period Ending 980630 A98047, Forwards Revised Scope of One Commitment Contained in Response to NOV1998-08-28028 August 1998 Forwards Revised Scope of One Commitment Contained in Response to NOV ML20153F6811998-08-26026 August 1998 Informs of E Dienethal & R Robarge Concerns Re Safety of Areas in & Around City of Zion ML20237D9281998-08-24024 August 1998 Provides Description of Approach Being Taken by Comed to Develop Dsar.New Safety Classification Will Be Developed for Equipment Determined to Be Important to Defueled Condition 1999-09-30
[Table view] |
Text
. _ . .
Commonwealth lawn Company
, , Zion Generating Station
- 101 $hiloh Itoulnani Zion. II. 9MW 2-'9?
Tel m-7 M 20m i
l l
l ZRA98055 November 20,1998 U. S. Nuclear Regulatory Commission Document Control Desk )
Washington, D.C. 20555 Zion Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR 39 and DPR-48 NRC Docket Nos. 50-295 and 50-304
Subject:
Change to Regulatory Commitments
Reference:
(1) Letter to USNRC from O. D. Kingsley (Comed) dated February 17,1998, Integration of Section 50.54(f) Commitments into the Nuclear Generation Group Strategic Reform Initiatives.
(2) Letter to USNRC from J. J. O'Connor (Comed) dated March 28, 1997, Commonwealth Edison Company's (Comed) Response to the U. S. Nuclear Regulatory Commission (NRC) Request for Information Pursuant to 10CFR50.54(f) Regarding Safety Performance at Comed.
(3) Nuclear Energy Institute guidance decumeret dated December 19,1995, " Guidelines for managing NRC Commitments," Revision 2.
(4) Letter to A. B. Beach (USNRC) from J. C. Brons (Comed) dated March 30, 1998, Applicable Regulations, Disposition of Commitments, and Systems Required Following ,
Permanent Shutdown and Defueling of Zion Units 1 and 2.
Reference 1 identified that ZION Station will oidy be implementing those 50.54(f) commitments of Reference 2 necessary to place it in SAFSTOR. This letter is to revise the scope of several regulatory commitments created by Reference 2 as identified in Attachment A.
Attachment A identifies:
- 1. The relerence which created the regulatory commitment / j
- 2. The original commitment /
- 3. The revised commitment. ,/f These changes in conunitments were satisfactorily evaluated using the Nuclear Energy Institute commitment 2 change methodology (Reference 3) as conunitted to in Reference 4. Should you have any questions concerning this
// &c'j) letter, please contact Mr. Robert Godley at (847) 746-2084 Extension 2900.
Respectfully, NI R. Starkey l Decommissioning Plant Manager l
Zion Nuclear Power Station 1
- Attachrnent 9811250066 981120' PDR ADOCK 05000295 p PDR; A Umcom Company
. l l
.*- l
. 4 i
1 I
November 20,1998 U.S. Nuclear Regulatory Commission :
Attachment A to 2RA98055 Page 1 of 4 1 Change to Regulatory Commitments The following table identifies actions committed to by Comed in this document. These
. commitment changes were evaluated as satisfactory using the Nuclear Energy Institute commitment change methodology.
Please notify Mr. Robert Godley, Zion Station Regulatory Assurance Manager, of any questions regarding this document or any associated regulatory commitments. ,
1 I l Reference Which Created The Commitment i i
Letter to USNRC from J.J. O'Connor (Comed) dated March 28,1997, Commonweahh Edison ;
I Company's (Comed) Response to the U. S. Nuclear Regulatory Commission (NRC) Request for Information Pursuant to 10CFR50.54(0 Rgarding Safety Performance at Comed.
Orginal Commitment To improve performance m planning, scheduling, and conducting routine maintenance, Zion management i refocused efforts to more effectively i.mplement a "12 week rolling" work planning and schedulmg process. ;
1 1
Revised Commitment i Zion station will implement a limited work planning process to accommodate the reduced scope work l effort required under a <lecommissioned plant in SAFSTOR.
I i
j 2 l Reference Which Created The Commitment Letter to USNRC from J.J. O'Connor (Comed) dated March 28,1997, Commonwealth Edison ,
Company's (Comed) Response to the U. S. Nuclear Regulatory Commission (NRC) Request for j Information Pursuant to 10CFR50.54(f) Regarding Safety Performance at Comed. ;
Orginal Commitment l Performance Improvement Management This strategy addresses how station performance will be I assessed to assure improvement. The strategy is implemented through action plans increasing j management oversight of field activities, implementing an effective self assessment program, improving the 4 PIF and root cause analysis processes, and improving the management of the station's formal commitment tracking system.
Revised Commitment None,this commitment has been deleted. The expectations for the imp!ementation of a self-assessment program at Zion are contained in a Station Manager document dated July 10,1998, Expectations for Self-Assessment Program.
l t
i
t 4
l November 20,1998 U.S. Nu' clear Regulatory Commission Attachment A to ZRA98055 Page 2 of 4 Change to Regulatory Commitments '
3 I i Reference Which Created The Commitment Letter to USNRC from J.J. O'Connor (Comed) dated March 28,1997, Commonwealth Edison Company's (Comed) Response to the U. S. Nuclear Regulatory Commission (NRC) Request for Information Pursuant to 10CFR50.54(I) Regarding Safety Performance at Comed. !
Orginal Commitment Work management processes will be clarified and streamlined in this strategy and training on these processes improved. The Operation 3 Work Control Center concept will be used to improve the control j of work activities. Action Request and Work Request backlogs will be screened, prioritized and reduced. ,
Multi-disciplined teams will physically walkdown plant structures, systems, and components to identify '
undocumented material deficiencies. l Revised Commitment Zion station will implement a limited work planning process to accommodate the reduced scope of work effort required to maintain a decommissioned plant in SAFSTOR 4
)
j 4 I Reference Which Created The Commitment 4 l
Letter to USNRC from J.J. O'Connor (Comed) dated March 28,1997, Commonwealth Edison i Company's (Comed) Response to the U. S. Nuclear Regulatory Commission (NRC) Request for Information Pursuant to 10CFR50.54(f) Regarding Safety Performance n Comed. ,
Orginal Commitment )
Management and Personnel Development - This strategy develops the capabilities and depth of the organization. This includes training, skills development, outside recntiting, and a substantially increased management involvement in the accredited training program. Required management and supervisory skills will be identified, personnel will be evaluated against these attributes, and appropriate development activities will be conducted. Instructor skills and training lesson plans will be upgraded. The System ;
Engineer training program will be upgraded. The strategy will also address upgrading craft skills and :
qualificationt l
Revised Commitment :
None,this commitment has been deleted. Additional skill developments are not needed because the I personnel which remain in the Zion Decommissioning Organization (ZDO) were selected through a targeted selection process. This process selected the best candidate based on his/her skills and competencies to perform targeted assignments within the ZDO. Qualifications will be maintained in acco-dance with 10CFR50.120 requirements.
l i
r November 20,1998 U.S. Nuclear Regulatory Commission Attachment A to 2RA98055 Page 3 of 4 Change to Regulatory Commitments 5 l Reference Which Created The Commitment Letter to USNRC from J.J. O'Connor (Comed) dated March 28,1997, Commonwealth Edison ,
Company's (Comed) Response to the U. S. Nuclear Regulatory Commission (NRC) Request for j Information Pursuant to 10CFR50.54(0 Regarding Safety Performance at Comed. J Orginal Commitment The ef fectiveness of work planning and control processes, quality of routine work activities, and equipment problems challenging operations will be addressed in the strategy entitled Getting Work Done.
Revised Commitment Zion Station will implement a limited work planning process to accommodate the reduced scope of work effort required to maintain a decommissioned plant in SAFSTOR 6 l Reference Which Created The Commitment Letter to USNRC from J.J. O'Connor (Comed) dated March 28,1997, Commonwealth Edison Company's (Comed) Response to the U. S. Nuclear Regulatory Commission (NRC) Request for Information Pursuant to 10CFR50.54(0 Regarding Safety Performance at Comed.
Orginal Commitment Comed management has committed to keep both units shutdown until corrective actions have been taken to ensure safe operation. These corrective actions regarding personnel performance, along with the results nf the Comed investigation of the event, will be submitted to the NRC in response to the Confirmatory Action Letter. The 1997 Operational Plan will also be modified as appropriate to address the depth of issues surrounding this event.
Revised Commitment None,this commitment has been deleted. Completion of corrective actions related to improving personnel performance during critical operations of Zion Units 1 and 2 will not be pursued. In
, accordance with 10CFR50.82(a)(1)(I), on February 13,1998, Comed submitted its written certification of permanent cessation of operations at Zion Station Units 1 and 2. In accordance with 10CFR50.82(a)(1)(iQ ;
on March 9,1998, Comed provided the NRC written certification that all fuel has been removed from the Zion Station Units 1 and 2 reactor vessels and that the two units will remain permanently defueled.
^
i I
l i
l *. .
l l
l l November 20,1998 l tl.S. Nu* clear Regulatory Commission l
Attachment A to ZRA98055 l Page 4 of 4 l
Change to Regulatory Commitments I
7 l Reference Which Created The Commitment Letter to USNRC from J.J. O'Connor (Comed) dated Alarch 28,1997, Commonwealth Edison l
Company's (Comed) Response to the U. S. Nuclear Regulatory Comminion (NRC) Request for j Information Pursuant to 10CFR50.54(f) Regarding Safety Performance at Comed. ;
Orginal Commitment The responsibilities of the action plan manager will be to develop the implementing plan and ensure that it is effective. In reviewing the action plan, the responsible manager will verify that it can be implemented and is capable of achieving its objectives.
Revised Commitment None,this commitment has been deleted. The responsibilities for station Action Plan Manager are no l
longer being implemented due to permanent plant shutdown. Action Plan Managers were assigned for 1997 Operational Plan Action Plans. Due to plant shutdown the continued monitoring and work on these specific plans to resume critical operations of the units has been stopped.
i 8 l Reference Which Created The Commitment Letter to USNRC from J.J. O'Connor (Comed) dated March 28,1997, Commonwealth Edison Company's (Comed) Response to the U. S. Nuclear Regulatory Commission (NRC) Request for Information Pursuant to 10CFR50.54(f) Regarding Safety Performance at Comed.
Orginal Commitment The Zion management team (Site Vice President and Senior Managers), as assisted by the strategy manager, will provide a forum for review of plan effectiveness. The results of the strategies, and the removal of any barriers to successful completion of the action plans, will be discuned at weekly review meetings.
Revised Commitment None,this commitment has been deleted. Weekly review fomms of recovery plan effectiveness are no longer required because work on the recovery plan has stopped with the plant shutdown announcement.
The Station Manager and the 2DO management team meet periodically to review and discuss plant decommiuioning issues.
l l
4 i
f I
l
,