Responds to Generic Ltr 90-04, Request for Info Re Status of Implementation of Generic Safety Issues Resolved W/ Imposition of Requirements or Corrective Actions. Current Status of Issues Encl
ML20055J119
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 07/26/1990
From: Chrzanowski R
COMMONWEALTH EDISON CO.
To: Murley T
Office of Nuclear Reactor Regulation
References
GL-90-04, GL-90-4, NUDOCS 9008010093
Download: ML20055J119 (8)


Text

.... _.. _..

./

Commsnwoalth Edisen

  • ~

J 1400 Opus Place >

  • D Downsrs Grova, Illinols 60515

+

f, -.

4 July 26, 1990 Dr.. Thomas E. Hurley, Director 4

Office of Nuclear Reactor F.egulation U.S. Nuclear Regulatory Commission Washington, DC.

20555 Attn: Document Control Desk l

Subject:

Zion Station Units 1 and 2 Response to Generic letter 90-04 NRC Docket Nos. 50-295 and 50-10_4 i

Reference:

(a) Generic Letter 90-04 Request for Information Concerning Status of-Implementation of Generic Safety Issues-(GSI)

Resolved with Imposition of Requirements or Corrective Actions (b) June 28, 1990 letter from T.J. Kovach to T.E. Murley i

Dear Dr. Hurley:

Generic Letter 90-04 was issued as a part of the NRC's continuing effort to estabitsh and maintain an accurate and validated implementation status for all significant staff imposed regulatory requirements or. corrective act ons. An important aspect of-this effort is to ensure.that the licensee and the NRC agree on-the-status of GSI resolution implementation at each facility.

Reference (b) indicated that compilation of the requested information would be completed by July 31, 1990..This letter represents the Commonwealth Edison (Edison) response to Generic Letter 90-04, for Zion-Station.

Zion Station has reviewed the guidance provided=in the Generic Letter.

The attached GSI table (Enclosure 1 from the generic letter) has been t

updated to reflect the current status of GSI implementation.

The generic letter's guide for updating GSI status was utilized for.this process.

Accordingly, the Attachment to this -letter provides the status of the efforts for Zion Station.

Please direct any questions regarding this response to this office.

Respectfully, h/Z)V R.A.

rzanowsK)i Nuclear Lice)(sing Administrator

/scl:ID125-1 Attachment cc:

A. Bert Davis-RIII Resident Inspector-Zion g((

C. Patel-NRR 900801o093 900726

/

/-

PDR ADOCK 0500o295 p

PDC

FACILITY NAME:

Zion Nucler.r Station

- 1 DOC 10!T NO.:

295 and 304 LICENSEE:

Co==onwealth Edison Qtsppany 4

A'ITACHMENT TO GENERIC LETTER 9(M)4 RFRDONSE STATUS OF LICENSEE IMPT NFNTATION OF GENERIC SAFETY ISSUES RESOLVED WITH IMPOSITION OF REQUIREMENTS OR CORRECTIVE ACTIONS GSI/(PA No.).

TITLE APPLICABILITY STATUS COMMENTS 40 (B065)

Safety Concerns Associated With ABBWR*s N/A Pipe Breaks in the BWR Scram System 41(B058)

BWR Scram Discharge Volume Systems All BWR's N/A 43 (B107)

Reliability ofAir Systems AH Finnt.

I February 16,1989, letter from M.H. Richter to.

(G.L. 8814)

NRC,imtial response to GL 88-14.

April 11,1999, letter from D. R. MuDer to H. E. Bliss providing NRC acceptance.

- Zion design verification response to NRC to.

foBow late 1990.

51(L913)

Improving the Reliability of All Plants I

January 29,1990,1<tter fro M. H. Richter to '

(G.L. 89-13) -

Open-Cycle Service Water Systems NRC, initial response.

The foBowing actions are pemhng for GL 89-13..

Astaan 1 Intake IL em. Inspection Zion Action Item 296-104-89-01301 Investagstion of possible techniques to be -

completed by August 1990.

Asdaest2

- Establish on-going program fort lion or Lake Screen House. Zil 296-104-81M)1302 to be established end of August 1990.

Action 3 Assess existance of effects of nuerobiological (

fouhng by end ofAugust 1990.

/sel:ID125:2 w

g

-v'"

v-i--

i-a

+

=e 4

e i

2 FACILITY NAME:

Zion Nuc7 ear Stellen DOCKET NO.:

296 and 304 LICENSEE:

Commonwealth Edison Comnany.

ATTACMWNT TO GENERIC LETTER 90-04 RESPONSE STA11JS OF LICENSEE IMPT FWNTATION OF GENERIC SAFETYISSUES REcoLVED WITH WPOSITION OF REQUTRFwNTS OR CORRECTIVE ACTIONS GSIMPA Noj TITLE APPLICABILITY STATUS COMMENTS 51(1913)

Actaen 4 (G.L. 89-13)

Estabhsh flushing stagnant / infrequently used Iim program or enhance existing m.

Expected initial activities to be com by Februmey 25,1991, for Unit I a f'

' x 30.1991. for Unit 2.

ZAl 296-104-89-01305.4 and.5 Action 5 Heat Exchanger Test / Inspection Program Heat Exchanger Inspections scheduled to begin February 25,1991. for Unit 1 and September 30, 1991, for Umt 2. Program to h for 3 outages and then the cotablishment of an -

on-going program. ZAI 296-104-8!M)1307 and 06.

Action 6 la,, g ste inspectnen of 5 high and 5 low flow loestions into eresion/ corrosion Februm 25,1991, for Unit 1 a 30, 1991 nit 2. ZAI 296-104-89-01 and 10.

67.3.3 (A017)

Improved Accident Monitoring AH Plants I

Item 1C.1 Com (G.L. 82 33)

Item LD.1 R. program approved and final aH items by the end of the next m.pletion of modifications inprogress with com outage for each Unit currently scheduM for faH 1991 and winter 1992. June 71990,-

letter from C.P. Patel to T.J. Kevoch providmg SER.

/sel:ID125:3

n FACILITY NAME-Zion Nuclear Station DOCKET NO.:

295 and 304 LICENSEE:

po==onwealth Edison @nigagr

~

ATTACWFNT TO GENERIC LETTER 90-04 RESPONSE STATUS OF LICENWF IMPTNFMTATION OF GENERIC SAFETY ISSUES RRe,OLVED WITH IMPOSITION OF #F4UTRFurNTS OR CORRECITVE ACTIONS GSI/(PA No.)

TITLE APPLICABILITY STATUS COMMENTS Item LD 2 Completed Item IILA.L2 Upgerde En. % Support Fechtaes. Facihnes u.

Item III.A.2.2

'al Deta,tb A-Model for Zionis schdaled to be _.4 M 30,1990.

75 (B076)

Item L1-Post-Tri Review All Plants C

June 17,1986, letter from S.A.Varga to (G.L 83-28)

(Program Descri on & Procedure)

D. L Farrar.

75 (B085)

Item L2-Post-Trip Review All Planta C*

November 5,1986, letter from G.L Alexander (G.L 83-28)

Date & Information Capability to ILR. Denten.

  • Awa2cmg NRC approval 75 (B077)

Item 2.1.1-Equipment Classification All Plants 0

July 2.1966,1etter from S.A. Varga to G.L 83-28)

& VendorIntedece(Reactor Trip D.L Farrer.

System Components)

Item 2.L2 All Plants

'C February 27,1999, letter from C.P. Patet to H.E. Bliss-73 (B086)

Item 2.2.1-Equipment Classification All Plants C.

February 6,1990, letter from C.P. Patel to (G.L 83 28; for Safety-Related Components

, T. J. Kovach.

75 (IA03).

Item 2.2.2. Vendor Interface C*

September 3,1987, letter from P.C. LeBlond to (G.L 83-28)_

- for Safety-Related Components U.S. NRC.

MaintenanceTesting (Reactor.

C July 5.1986, letter from S.A. Varga to 75 (B078)

Items 3.L1 and 3.L2-Post -

Is.L Farrar.

Trip System Components)

/scl:ID125:4

FACILITY NAME:

Zion 2Tuclear Sta_gon DOCKET NO : -

295 and 304 UCENSEE:

Commonwealth I'disan Comnany ATTACHMENT TO GENERIC LETTER 904)4 F5%'DONSE STA'IUS OF LICENSEE IMPT NFNTATION OF GENERIC SAFETY ISSLTS RESOLVED WITH IMPOSITION OF REQUTRNNTS OR CORRFCTIVE ACTIONS -

iSTMPA No.)

TITLE APPLICABILITY STATUS COMMENTS 75 (B079)

Ite n 3.1.3-Post-Maintenance All Plants C*

August 22,1989, letter from G.E. Trzvne to (G.L. 83-28)

Testing Changes to Test R, ants U.S. NRC

  • Awaiting NRC approval ~

(Reactor Trip System Components) 75 (B087)

Items 3.2.1 and 3.2.2-Post-hinten-All Plants C

July 5,1985, letter from S.A. Varge to (G183-28) ance Testing (ALL Other Safety-DL Farrar.

Llated Components) 75(B088)

Item 3.2.3-Post hintenance All Plants C'

August 22,1988. letter from G.E. Trzyne to (G.L. 83-28)

Testing Changes to Test Requirements U.S. NRC

  • Awaiting NRC approvat (All other Safety-Related Components) 75 (B080)

Item 4.1-Reactor Trip System All Plants C

July 5,1986, letter from S A. Varga to (G183-28)

Reliability (Vendor-Related DL Farrar.

Modi 5 cations) 75 (B081)

Items 4.2.1 and 4.2.2-bactor Trip All PWR*s C

June 6,1986, lehr from S.A. Varga to (GL 83-28)

System Reliability-hintenance Test-DL Farrar.

. ing (Preventative hintenance &

Surveillance Program for Reactor Trip Breakers) 75 (B082)

Item 4.3-Reactor Trip System AllW & B&W C*

August 22,1988, letter from G.E.Trzyna to (G.L. 83-28)

Reliability-Design Edit 1 ations Plants U.S.NRC. 'Awaiti:2g NRC approval (Item 4.3)

(Automatic Actuation of Shunt Trip Ntachment for Westinghouse & B&W Plants) 75 (B091)

Item 4.4-Reactor Trip System All B&W N/A (GL 83-28)

Reliability (Improvements in Plants hintenance & Test Prd for B&W Plante)

/scl:ID125:5

~ -.

z-.

FACILITY NAME:

Zion Noclear Stati a

-l D O C K E T N O.:

296 and 304 IJCENSEE:

Commonwealth W-Comnany 0

KITACEMENT TO GENERIC IETITR 90 04 RE5P9NSE STARTS OF LICENSEE IMPLE3fENTATION OF GENERIC SAFETT ISSUES RESOLVED WrIH IMFCSITION OF REQUIREMENTS OR CORRECTIVE ACTIONS GSIAPA No.)

TrILE APPIJCABIIIIT TTATUS COMMENTS 75 (B092)

Item 4.5.1. Reactor Trip System AU Plants C

July 5.1986, letter from S.A. Vary to (GL 83-28)

Reliability Diverse Trip Feetures DL Ferrar.

(System Functional Testing) 75 (B093)

Items 4.5.2 and 4.5.3 ReactorTrip C

Mardi 10,1987,1.teer from SA. Varga te (GL 83-28)

System Reliabihty-Test Alternatives DL Ferrar (Item 4.5.2) and August 2.19&J,

& Intervals (System Functional Test-freen C.P. Patei to TJ. Eevech (Item 4.5.3) ing) 86 (B064)

Iong Range Plan for Deahng with All M ants N/A Stress Corrosion Cracking in BWR Piping 93 (B096)

Steam Binding ofAuxiliary AU PWIts C

Jalt 19,1988.1.tter frun LN. Olshan '.o (GL 88-03)

Feedwater Pumps H.f. Bliss, accepting arporate. _, _.-

99 (LOIT)

RCS/RHR Suetewi Line Valve Interlock AUPWIts I

Cs-- -- _ 30,1998,1stter freen RA. Chrmanewski (GL 88-17) onPWRs to T.E. Marley.

January 31.1999, letter froen RA. Chrzanewski to T.E. Murley.

February 6,1999, letter free R.A. Chrsanowsin to T.E. Murley.

Install seesed level transmantter to mester reduced -. _ _t[- cond:wn.

RCSlevel I

Unit I to be - _ 'if uring faH 1991 mutage. and Unit 2 schedule 6 to be

__,' if during 1992 outage.

ZAI 296-104-88 01.

.06 and.tyT.

?

/scidD125:6

_.awp a--

s.g

~-

.,-.n

- m

--~.--a e--

~-

~ - - +

~ - ~ ~. ~

e-,w.

=, ~ - - - - - - - - - - - - - -

FACILITY NAME:

Zion Nuclear Station DOCKET NO.:

296 and 304 t

LICENSEE:

Co==enwealth FAan Comnany

(

90-94 RESPONS STARJS OF LICENSEE IMPf2 MENTATION OF GENERIC SAFETT ISSUES GSIAPA No.)

11TLE APPLICABILITT STATUS COMMENTS 124 Auxiliary Feedwater System NS1&2 N/A Reliabihty haoche Seco, Prairie Island 1 & 2 Crystal River-3, Ft.

Calhoun A-13 (B017)

Scubber Oy>nubbersbility Assurance-All Plants C

January 22,1996, letter freen JA Norris Nr Hydraulic.

D.L. Farrer, contained SER for Techmeel Speerficataan Amendments 93 for Unit 1 and j

83 for Unit 2.

A-13 (B022)

Snubber Operability Assurance.

All Plants C

January 22.190s letter from JA Nor;is t-Mechanical Snubbers D.L. Farrar, contained SER for Tech ~cel Speenfleetsen Amendente 93 for Unit 1 and 83 for Unit 2.

A-16 (D012)

Steam Effects on BWR Core Spray Oyster Creek N/A Dieluha

& BMP-1 A-35 (B023)

Adequ.*:y of Offsite Power Systeams AH Plants -

C

  1. 8, IM9. letter from NRC, _. M CRCe te renew the electric power systeen at Zion.

Ceco letters dated E,'_'_ c 17,1979 Now,* 1, IM9. December 14. IM9. June 23, 1980 August 18,1990. and February 17,1981 prov.ded the.,

informeteen.

Aprl 9,1961, letter fhun SAVerge to J.S Abel found CECO *e reefEnnation to Zion's coesplience to GDC-17 to be _, d';.

/sel:ID125:7

FAC11JIT NAME:

Zion Nuclear Station DGCKET NO.2 295 and 304 LICENSF21 Esemagswealth Ed2 son CommenI ATTACHMENT TO GENERIC MTIER 90 94 RESPONSE STA1TJS OF LICENSEE IMPMMENTAHON OF GENERIC SAFETY ISSCES RESOLVED WITH IMPOSITION OF REQUIREMENTS OR CORRECTIVE ACTIONS GSMPA No.)

TIT M APP 12CABIIJTY STATUS COMMENTS B-10 Behavior of BWR Mark III Contain-AII BWR Work N/A ments III Plants B-36 Develop Design.Testang and AII Plants N/A Maintenance Criteria for At=- - '

with OL Cleanup System Air FiltrationT.ere Applications Abortion Units for Engumred Safety ARer 4/1/50 Features Systems and for Normal Ventilation Systems B-63 (BO45)

Isolation of Low Pressure Systems All Plants C'

February 23,1990, letter frm NRC r4.r : a Connected to the Reector Coolant CEC te primde response.

System "r-. Boundary.

March 14.1990, letter from W.F. Naughten t.

D.C. Eisenhetg reopense.

March 13,198., Genene Ieter 87-06 was issued June 11.1987,Iseter from M.S. Tarbek te U.S. NRC pd2: " roepense.

  • Aweiting NRC l

approvat 4

/sellD125:8

~...

-., _. _..