Provides Supplemental Response to NRC Bulletin 89-001 Re Mechanical Plugs Supplied by Westinghouse,Per .All Mechanical Plugs from Heats NX-3513 & NX-4523 Removed from Hot Legs of Plant Steam Generators
ML20058P779
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 08/13/1990
From: Taylor D
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-89-001, IEB-89-1, NUDOCS 9008200070
Download: ML20058P779 (2)


Text

.

cg y ~ '. --

M_.

f

,( _ :J Common %alth Edison

~

1400 Opus Plics

~

Downers Grove, Illinois 60515 3

i August 13, 1990' i

-U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Hashi7aton, D.C 20555

Subject:

Zion Station Units 1 and 2

' Supplemental Response to NRC Bulletin 89-01 EC_Qor,AeLt(L_50-295 and 50-304

References:

(a) NRC Bulletin 89-01, dated May 15, 1989.

(b) CECO response to NRC Bulletin 89-01,' dated June 16, 1989.

i l

Dear Sir:

= Reference (a) requested that addressees determine whether certain mechanical plugs supplied by Westinghouse are installed in their steam generators, and if.'so, that an action plan be implemented to ensure'that these

,m plugs will continue to provide adequate assurance of reactor coolant system

'~

pressure boundary integrity.

Reference-(b)-presented the Commonwealth Edison Company (CECO)' response for Byron, Braidwood and Zion Stations.

In that response CECO, indicated that Zion Station would perform remedial actions on L_

the steam generator.not leg plugs fabricated from suspect heats during the l-~

.next refueling outage for_each unit.

CECO's remedial actions: consist of I

removal, examination (on'a sample basis) and replacement of the plugs fabricated from suspect heats.

+

As indicated in Reference (b), remedial actions'for the 27 hot leg plugs'from suspect heats (all from heat 4523) were scheduled to begin during i

the Spring 1990 refueling outage far Zion Unit 2.

These plugs have been removed from the Unit 2 steam generators and were replaced with Combustion Engineering rolled mechanical plugs or welded plugs, as appropriate.

The E

. mechanical plugs were fabricated from Inconel-690 material.

All 27 hot leg-plugs were removed using_the " Stretch-and-Pull" method.

These plugs from heat 4523 were to have been examined on a sample basis for primary water stress corrosion cracking (PHSCC).

However, correspondence from'Hestinghouse Electric Company has informed CECO that they require.no additional plugs for metallurgical examination from the suspect heats.

Therefore, no examination of Unit 2 hot leg plugs will be performed, 9008200070 900313 i

6 ALOCK.03OOg5 p

DR

/

g

,,,. " U. S. NRC ' August 13, 1990 l

It_should be noted that at this time all Hestinghouse mechanical plugs from heats NX-3513 and NX-4523 have been removed from the hot legs of the Zion Steam Generators. Any_ future plugs removed from the steam generators

+

will be-provided to Hestinghouse Electric Corporation for analysis.

This response fulfills the reporting requirements of Bulletin 89-01

'for Zion Station.

Please direct any questions concerning this letter to this office.

Respectfully, Darrell L. Taylor Generic Issues Administrator cc:

A.B. Davis - Regional Administrator, Region III Resident Inspector - Zion C. Patel

.NRR, Zion Station Project Manager SUBSCRIBED AND SHORN TO' BEFORE HE THIS DAY LLIALLB1 1990.

Oh l l[

t j' NOTARY PUBLIC /

, 7' 7gr 7-yg -- 1111 11=11}[.

7

" OFFICI AL' S C A L',,

PATRICIA LYNN MARLOW L

! 'MTARY Pm,'k $1w11 m iLLil9018 1mW/IDI64 SI E N 0*2-@N-b -

-:-:-:-:+ e I

i i

i k