Forwards Safety Insp Rept 50-456/86-10 on 860224-0417.No Violation Noted
ML20155G364
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 05/02/1986
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20155G368 List:
References
NUDOCS 8605060072
Download: ML20155G364 (2)


See also: IR 05000456/1986010

Text

. .

MAY 02 msg

Docket fio. 50-456

Comonwealth Edison Company

ATTil: fir. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. A. Dunlop, Jr. , of

this office on February 24 through April 17, 1986, of activities at Braidwood

fiuclear Power Station, Unit 1, authorized by fiRC Construction Pemit fio. CPPR-132

and to the discussion of our findings with C. J. Terrashek at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

exanination of procedures and representative records, observations, and

interviews with personnel,

fio violations of fiRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Congnission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the f4RC

Public Docurrent Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

p,,g p -~ 2; C . L N'M

Charles W. Hehl, Chief

Operations Branch

Enclosure: Inspection Report

fio. 50-456/86010(DRS)

_See _At_ta_ched Distribution

RIII RIII RIII RIII

Od

Dunlo /mab

%

Ring

tM

Gardner Hehl

05/01/86

'

8605060072 860502

PDR ADOCK 05000456

G PDR ll

f4/

. .

Commonwealth Edison Company 2

g ,,

a cog

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Superintendent

P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr. , Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Moore, ELD

G. Berry, ELD

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

.

I

$