MAY 02 msg
Docket fio. 50-456
Comonwealth Edison Company
ATTil: fir. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Mr. A. Dunlop, Jr. , of
this office on February 24 through April 17, 1986, of activities at Braidwood
fiuclear Power Station, Unit 1, authorized by fiRC Construction Pemit fio. CPPR-132
and to the discussion of our findings with C. J. Terrashek at the conclusion of
the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
exanination of procedures and representative records, observations, and
interviews with personnel,
fio violations of fiRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Congnission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the f4RC
Public Docurrent Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
p,,g p -~
2; C . L N'M
Charles W. Hehl, Chief
Operations Branch
Enclosure:
Inspection Report
fio. 50-456/86010(DRS)
_See _At_ta_ched Distribution
RIII
RIII
RIII
RIII
Od
%
tM
Dunlo /mab
Ring
Gardner
Hehl
05/01/86
'
8605060072 860502
ADOCK 05000456
G
ll
f4/
.
.
Commonwealth Edison Company
2
g
,,cog
a
Distribution
cc w/ enclosure:
D. L. Farrar, Director
of Nuclear Licensing
M. Wallace, Project Manager
D. Shamblin, Construction
Superintendent
E. E. Fitzpatrick, Station
Superintendent
P. L. Barnes, Regulatory
Assurance Supervisor
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D. W. Cassel, Jr. , Esq.
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, ELD
J. Moore, ELD
G. Berry, ELD
J. Stevens, NRR
The Honorable Herbert Grossman, ASLB
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB
.