ML20155J311

From kanterella
Revision as of 03:42, 17 December 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-267/88-24 on 880926-30.No Violations or Deviations Noted
ML20155J311
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 10/17/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20155J317 List:
References
NUDOCS 8810250492
Download: ML20155J311 (2)


See also: IR 05000267/1988024

Text

. .

&* ,

In Reply Refer Tu: OCT I 7 1"

Docket: 50-267/88-24

Public Service Company of Colorado

,

ATTN: Robert O. Williams, Jr.

Vice President, Nuclear Operations

2420 W. 26th Avenue, Suite 15c

Denver, Colorado 80211

,

l

Gentlemen:

This refers to the inspection conducted by Messers H. F. Bundy, and T. O.

McKernon of this office during the period September 26-30, 1988, of activities

authorized by NRC 0,,erating I.fcense DPR-34 for Fort. St. Vrain, and to the

discussion of our findings with you and other members of your staff at the

conclusion of the inspection. "

'

Areas examined during the inspection included surveillance and' modification

testing. Within thtse areas, th? inspection consisted of selective examination

of procedures and representative records, interviews with personnel, anc

observations by the NRC inspectors. The inspection findings are documented in

the enclosed inspection report.

.

Within the scope of the inspection, no violations or deviations were

identified.

'

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.
Sincerely,

l' Original Signed By

W. D. Beach

j L. J. Callan, Director  !

'

Division of Reactor Projects

Enclosure: (see next page)

j RIV:T / TPSh C:TP] D D:

'

f-41FBundy:gb g PMcKernon g WCTeidle JL'Hilho/d

an LJ K lan

j /0// -188 jv//z/88 jo// z/88 to //3 /88 to/1/88

I

'

.

,

) i

8

d

8810250492 891017

,

PDR ADOCK OSCCO267

j Q PDC l

l

. - _. -. . . . , . . _- - .

' *

t

.. .

.

.

- Public Service Company of Colorado -2-

Enclosure:

- Appendix - NRC Inspection Report i

, 50-267/88-24 -

cc w/ enclosure:

Fort St. Vrain Nuclear Station  !

.'

Manager, Nuclear Production Division I

16805 WCR 196  !

Platteville, Colorado 80651  :

Fort St. Vrain Nuclear Station i;

P. Tonlinson, Manager, Quality

1 Assurance Division ,

'

.

(sameaddress)  ;

4

) Colorado Radiation Control Program Director

-

Colorado Public Utilities Convaission

4

l

l bectoDMB(IE01).-DRS&DRP i

r bec distrib. by RIV:

1 i

i *RRI *R. D. Martin, RA  !

!

  • Section Chief (DRP/B) * Project Engineer, DRP/B ,

l, *RPB-DRSS Lisa Shea, RM/ALF *

,

  • MIS Systeta *RSTS Operator i

i *K. Heitner, NRR Project Manager *RIV File  !

'

*DRS *DRP
*H. Bundy *T. McKernon  ;
*W. C. Seidle  ;

i  ;

', *W/766  :

4 l

,

4

i

i

]  !

!

.

,

i  !

A I

1  !

! I

'

i

1  !

! l