ML20155J311
| ML20155J311 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 10/17/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20155J317 | List: |
| References | |
| NUDOCS 8810250492 | |
| Download: ML20155J311 (2) | |
See also: IR 05000267/1988024
Text
.
.
&*
,
In Reply Refer Tu:
OCT I 7 1"
Docket:
50-267/88-24
Public Service Company of Colorado
ATTN: Robert O. Williams, Jr.
,
Vice President, Nuclear Operations
2420 W. 26th Avenue, Suite 15c
Denver, Colorado 80211
,
Gentlemen:
This refers to the inspection conducted by Messers H. F. Bundy, and T. O.
McKernon of this office during the period September 26-30, 1988, of activities
authorized by NRC 0,,erating I.fcense DPR-34 for Fort. St. Vrain, and to the
discussion of our findings with you and other members of your staff at the
conclusion of the inspection.
"
'
Areas examined during the inspection included surveillance and' modification
testing. Within thtse areas, th? inspection consisted of selective examination
of procedures and representative records, interviews with personnel, anc
observations by the NRC inspectors. The inspection findings are documented in
the enclosed inspection report.
'
Within the scope of the inspection, no violations or deviations were
.
identified.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
l
Original Signed By
W. D. Beach
'
j
L. J. Callan, Director
Division of Reactor Projects
'
Enclosure:
(see next page)
j
RIV:T
/
TPSh
C:TP]
JL'Hilho/d
D
D:
'
f-41FBundy:gb g PMcKernon g WCTeidle
an
LJ K lan
j
/0// -188
jv//z/88
jo// z/88
to //3 /88
to/1/88
'
.
,
)
i
8
d
8810250492 891017
,
ADOCK OSCCO267
j
Q
-
. -
-
-
- -
-
.
-
_.
-.
.
.
.
,
.
.
_-
-
.
'
t
. .
.
.
.
- Public Service Company of Colorado
-2-
Enclosure:
- Appendix - NRC Inspection Report
i
50-267/88-24
-
,
cc w/ enclosure:
Fort St. Vrain Nuclear Station
Manager, Nuclear Production Division
I
.'
16805 WCR 196
!
Platteville, Colorado 80651
Fort St. Vrain Nuclear Station
i
P. Tonlinson, Manager, Quality
1
Assurance Division
'
,
.
(sameaddress)
4
)
Colorado Radiation Control Program Director
Colorado Public Utilities Convaission
-
l
4
l
bectoDMB(IE01).-DRS&DRP
i
bec distrib. by RIV:
r
1
i
i
- RRI
- R. D. Martin, RA
!
!
- Section Chief (DRP/B)
- Project Engineer, DRP/B
,
l,
- RPB-DRSS
Lisa Shea, RM/ALF
- MIS Systeta
- RSTS Operator
i
,
- K. Heitner, NRR Project Manager
- RIV File
!
i
- DRS
- DRP
'
- H.
Bundy
- T. McKernon
- W. C. Seidle
i
',
- W/766
4
l
4
,
i
i
]
!
.
,
i
!
A
I
1
!
I
i
'
1
!
l
.
-
-
-