ML20206F008

From kanterella
Revision as of 05:32, 11 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/87-06 & 50-457/87-05 on 870317-20.No Exercise Weaknesses Identified.Util Should Make Greater Efforts to Minimize Types of Scenario Data & Controller Flaws as Summarized in Paragraph 5.f of Rept
ML20206F008
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 04/07/1987
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20206F013 List:
References
NUDOCS 8704140060
Download: ML20206F008 (2)


See also: IR 05000456/1987006

Text

-

. *

APR 0 71987.

"

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATIN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

f

This refers to the routine safety inspection conducted by Mr. T. Ploski and

others of this office on March 17-20, 1987, of activities at the Braidwood

Nuclear Generating Station, Units 1 and 2, authorized by Operating License

and to the discussion of

No. NPF-59

our findings and

with Construction

Messrs. N. Wandke, Permit No. CPPR-133,ick and others of your staf

E. Fitzpatr

.at the conclusion of the inspection.

The enclosed copy of our inspection re) ort identifies areas examined during

the inspection. Within these areas, tie inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

Although no exercise weaknesses were identified in the inspection re) ort, we

are concerned that this exercise scenario was not of the quality we lave come

to expect from your organization. We are also concerned that s_e.yeral, controller

errors or late actions resulted in temporary player confusion. While it may

be unrealistic to assume that every scenario package and controller performance

can be devoid of errors, we expect that your staff will make greater efforts

to minimize the types of scenario data and controller flaws as are summarized

in Paragraph 5.f of the enclosed report.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

r ea 17 U D* E

h

G ,,, .

-

. S fer, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosure: Inspection Reports

No. 50-456/87006 DRSS ; and

No. 50-457/87005 DRSS

See Attached Distribution

RIII

LOGS P

i

RIII

7f

RII

A h RIIIC4 RI RIII

s

&

Patte on/ims Ploski Christoffer Nte on S th gWilliamsen

RIII

G,s

h' RIlh'

ell

Ya

Li tle ir hg

A)!

k?h1 l

v

c

., .-

Common <ealth Edison Company 2 APR 071987

Distribution-

cc w/en~ closure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Superintendent-

,

P. L. Barnes Regulatory

's AssuranceSu

=DCS/RSB (RIDS)pervisor

? Liceasing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

D. W. Cassel, Jr., Esq.

Richard Hubbard

<-

J. Utilities

W. McCaffrey'sionChief,

Divi Public

.H. S., Taylor, Quality Assurance

Division

e E. Chan, OGC

""

J. Moore, 0GC

-G. Berry, 0GC

J. Stevens, NRR.

The Honorable Herbert Grossman, ASLB

The Honorable A..Dixon Ca11ihan ASLB

f

TheHonorableRichardF. Cole,dSLB

D. Matthews EPB, 0IE

W. Weaver,$EMA,RV

1e

') .

--,,,,,,-,,,v,- . - - , , - - - - - - - - - ,,